Overview First Phase Renderings/Photos More Photos/Later Phases Yards News Items
The first phase of the redevelopment of the 44 acres of the Southeast Federal Center site will see the construction of the Yards Park, the renovation of three existing buildings and the construction of one new one. Note that specifics such as start dates are estimates, and all designs may still undergo modifications. All renderings are courtesy Forest City Washington.
Choose Other First-Phase Projects to View
| |
Factory 202
Factory 202 (the splashy new name for what's been known as the Gun Assembly Building or Broadside Mount Shop or Building 202) was originally built in 1941. It is being co-developed by Forest City and PN Hoffman as a 271-unit condo building, again with two floors added on top, and could be completed in 2011. (3/07)
Two views of what the renovations of Factory 202 may look like, specifically showing the two floors added to the roof and the glass-enclosed atrium inside the building. Designs by SK&I Architecture Design Group.
|
|
|
The eastern side of Building 202 finally came into view from M Street east of Fifth in summer 2008, when a hole was punched in the historic brick wall to make way for the eventual 5 1/2 Street, SE. Building 74, at left will eventually be redeveloped into townhouses. (8/24/08)
|
Building 202, facing M Street. (10/03)
|
|
|
Although the Federal Protective Services has now moved out of Building 202, some evidence remains. (10/29/08)
|
A closeup of the northeast corner of the building, just inside the M Street brick wall. (10/29/08)
|
|
Building 202 (right) as seen from the roof of the old Capper Seniors building just before it was demolished. (11/1/07)
|
|
Choose a Phase One Project to View, or View All:
The Foundry Lofts
|
The Boilermaker Shops
|
Twelve12 Apartments
|
Factory 202
|
The Yards Park
|
|
Overview First Phase Renderings/Photos More Photos/Later Phases Yards News Items
|