FRP's deVilliers was even more relieved, as well he should be--he spoke of his initial discussions with the Office of Planning about redeveloping the site, which occured in 1994--a mere 20 years from there to construction! (I came in at about the halfway point, and have probably spent more time writing about the zoning ins and outs of this project than any other.)
Given that the plan to redevelop the Florida Rock site along the Anacostia River just south of Nationals Park has been in the works for about 15 years now, it's worth giving a post to the news that yesterday a permit was issued to allow the initial excavation, shoring, and sheeting for the 350-unit apartment building that will be the first phase of the 1.1 million-square-foot mixed use project that's now known as RiverFront on the Anacostia.
* TRAILER PARKED: A few readers have passed along the news that a construction trailer has appeared within the past week or so on the Florida Rock site along the Anacostia River just south of the ballpark. While plans are to get underway Any Minute Now on the first-phase 350-unit apartment building at the site's eastern end, next to Diamond Teague Park and Piers, there's not yet been any news that the construction financing has been finalized, nor is there as yet an approved shoring/sheeting/excavation permit. But the time does appear to be drawing nigh that development of this 5.8-acre parcel will finally get underway, at which point people will shift from complaining about the empty lot right across from the ballpark to complaining about a tall building ruining the views of the river.
* FLORIDA ROCK: MRP Realty is now in control of the land at the Florida Rock site that will become the 350-unit apartment building that is the first phase of RiverFront on the Anacostia. A $65 million loan is expected to be finalized soon, and the developers say that the project will "commence construction by late summer 2014." (WBJ)
At Monday's ANC 6D meeting, representatives of MRP Realty made a presentation showing the updates to the RiverFront on the Anacostia project (aka Florida Rock) that they will be taking to the Zoning Commission later this year.
There was also much time spent on the designs for the public spaces that span the 5.5-acre site. With large lawns, wetlands-type areas that would actually be bio-filtration mechanisms, quieter tree-covered spaces, and a marina that could potentially have 40-50 slips, the additions could be seen as echoing the Yards Park a couple blocks to the east.. But there are also some "beach" areas where sand would be placed, and a large sculpture could be included in the "Riverfront Plaza" at the foot of 1st Street. The esplanade is still a major part of the design, but there is no longer a separate bike path--pedestrians and cyclists would share the boardwalk as it runs through the entire site, from South Capitol Street to Diamond Teague Park. And there may even be locations where some of the concrete blocks from the old concrete plant site would be incorporated into the public spaces.
I wrote recently about the bumpy first trip back to the Zoning Commission for the new designs for the project known as Florida Rock. The developers (MRP and FRP) want to build a residential building at 1st and Potomac instead of the originally planned office building, and also are looking for some tweaks to the plans originally approved in 2008 by the Zoning Commission for the rest of the six-acre site.
On Monday, Feb. 13, the full commission took up the case again. Despite the developers offering to increase the total amount of retail for the entire site by about 11,000 sq ft (up to 36,370 sq ft total), vice chair Konrad Schlater again felt the retail offerings to be lacking, describing the designs as having "no vision" and a "missed opportunity" for one of the city's few large-scale waterfront developments, adding that he doesn't get the sense that the design takes full advantage of the site and "how it can meet the waterfront."
On Monday night, the city's Zoning Commission had its first crack at the new request for modifications to the existing Planned Unit Development (PUD) for the Florida Rock site across the street from Nationals Park, as the commissioners deliberated on whether to "set down" the request for a hearing. As mentioned previously, the developers want to change the site's first phase from office to residential, and also have done some reworking of the rest of the design for the six-acre site that the Zoning Commission approved after much deliberation and tweaking back in 2008.
Commissioner Peter May, on the other hand, said that he is actually more comfortable with the new design, given that there were features he "really questioned" in the 2008 design, but that the latest filing is "pretty simplistic" in terms of the drawings, and did say that the architecture is "kind of boring," especially from the waterside view. (The image at right is the Phase 1 residential building, as seen from the river.) He also wanted to see more comparisons to the previously approved design so that they could understand more what they may be giving up with the new design, but that he found the overall plan "more appealing than before."
With the entire filing available online (if you search), I was able to go through and cull out some of the most representative drawings from this new design, which I've put on my Florida Rock project page. At the bottom of that page you can also see some images of the designs that were approved in 2008. The first image at left, from 2008 (click to enlarge), shows the four buildings and the public spaces with a lot of curves and glass and "articulation."
Compare that to the latest design. While this is clearly a very early drawing, it does show four much more boxy structures, as commissioner Turnbull said. You can also see the curves-versus-corners differences in the site-plan comparison graphic I created, which also shows the differing layouts of the public spaces, again going from a lot of flowing, rounded paths and open areas to straighter-edged movements, with the total amount of "lot occupancy" going down to 44 percent in the new design from 58 percent in the old. The phase 1 apartment building is the most fleshed out in the renderings, but there are additional drawings giving a general sense of the site layout. 
I almost can't bring myself to write the words, but the owners of the Florida Rock site just south of Nationals Park have filed with the Zoning Commission for not only the previously reported plan to change the planned first phase office building to a residential one, but also to revisit parts of the site plan for the three subsequent phases. (For those of you versed in zoning speak, they are requesting to "revert Phases II, III, and IV to First Stage Approvals with modifications.")
* The esplanade that has always been such a big part of the site plan remains, acting as the portion of the Anacostia Riverwalk Trail connecting South Capitol Street to Teague Park, the new pedestrian bridge, and the Yards Park. The Esplanade will "relate" to the "design vernacular" of the newly constructed boardwalks, and will also have a lot of stormwater management and bio-filtration offerings.
On Monday night, ANC 6D gave its support to a series of minor modifications (very minor--did I mention they were minor?) to the previously approved design of the new residential/retail/grocery development planned for the southeast corner of 4th and M, SE.
As we found out a few months ago, site owner Florida Rock Properties has entered into a joint venture with MidAtlantic Realty Partners to move forward on the first phase of the 1.1-million-square-foot "RiverFront on the Anacostia" redevelopment of the site, which they are hoping will be a 200-unit apartment building on the eastern edge of the site (across from the Nationals Park grand staircase at First and Potomac, next to Diamond Teague Park) instead of the office building originally planned. The Zoning Commission will need to approve this change, and that process should be beginning soon. Apparently there will be a presentation on the new plans at the Oct. 17 ANC 6D meeting (though the agenda isn't out yet). Their hope is to begin construction in the spring of 2013.
Back in March we learned that the plans were underway to move the gravel/stone/concrete operations that have been at 25 Potomac Ave. since the 1920s around the corner to South Capitol and S Street SE, down in Buzzard Point. All that needed to be done was build some new infrastructure at the new location, and get a raze permit approved, and then the site long known as Florida Rock could be demolished, which the site owners were hoping would be happen by early summer.
A press release that went out on the wires on Friday has announced that a joint venture is being structured between Patriot Transportation Holdings (through its subsidiary Florida Rock Properties) and MidAtlantic Realty Partners, LLC, to develop the first phase of RiverFront on the Anacostia, just across the street from Nationals Park.
This of course will be huge news to everyone who looks out from the baseball stadium at the concrete plant just to the south, and probably is a more complete explanation for the filing of the raze permit earlier this year. In late 2009 this first phase of the project was given a two-year extension of the zoning order that had originally called for construction to begin by the middle of this year. FRP's representatives cited the difficulties of getting financing to get work underway in their request.
I've gotten a bit more information about the raze permit application at the Florida Rock site, the concrete plant on the banks of the Anacostia directly across from Nationals Park.
* A raze permit application has been filed by the Florida Rock folks for the concrete plant operated by Vulcan Materials Co. on Potomac Avenue just south of Nationals Park. This in an of itself is quite interesting, made even more interesting by a lack of response from Florida Rock Properties when I inquired as to what this planned razing might mean. From what I'm told, raze permits are valid for one year from the date of issuance (and this one hasn't been issued yet). The plan has been for a 1.1-million-square-foot mixed-use project that would include office, residential, hotel, and retail in four buildings, plus lots of open space. (Note that the western part of the project can't be built until the new Douglass Bridge is built and the current one is demolished, which doesn't seem to be happening anytime soon). Whether the current plans will still be going forward with the current owners or if changes are in the works, we'll just have to wait and see, though considering that it took FRP a decade or so to get zoning approvals for the site, it would be no fun to see the process start over again.
Catching up from last week.... On Monday (Nov. 9), the Zoning Commission voted 5-0 to approve Florida Rock Properties' request for a two-year time extension on the 2008 zoning order for its RiverFront project at First and Potomac, across from Nationals Park. Citing the current Economic Difficulties, the developers requested the extension so that their deadline for securing building permits for the project's first phase (an office building on the east side of the site, near Diamond Teague Park) is now mid-2012, with a construction start date deadline of mid-2013. My RiverFront page gives all sorts of additional details on the project, if you need a refresher.
The agenda for Monday's ANC 6D meeting has been posted, with two Near Southeast items listed. The first is that the developers of the RiverFront (aka Florida Rock) site between the Anacostia and the ballpark are apparently filing for a time extension on their zoning PUD ("planned unit development," for those of you mercifully unaware). When the zoning approval for this project finally came through in 2008 (after years of slogging through the process), the developers were given until May of 2010 to apply for building permits for the first phase of the project (an office building on the east end of the site, near Diamond Teague Park), with construction then required to start by May 2011. So, although it was recently reported that Florida Rock Properties is looking for an equity partner to help finance the development of the site, they clearly believe that it will be tough for them to meet the zoning order timeline.
A press release from the mayor's office (not yet online) tells us that this afternoon Mayor Fenty accepted $800,000 from the developers of Florida Rock/RiverFront for the construction of Diamond Teague Park next door. This contribution was part of the second-stage Planned Unit Development approval given by the Zoning Commission a few months back for the 1.1-million-square-foot mixed-use project. 




icon to see them. There's also an additional agenda item for "Capper/Carrollsburg Venture LLC -- Senior Building," which I believe is a revision of the design of Capper Seniors #2, because the design submitted in 2003 included a blank wall along M Street, which is a zoning no-no in this area. The need for this vote was discussed at the Jan. 12, 2004 meeting, and is probably why the project's building permit application has the zoning section marked "Hold for Correction." (Yes, my head hurts, too.)
Speaking of second-stage PUDs, while wandering around on the web trying to educate myself on this topic, I found this 1999 National Capital Planning Commission document, showing the detailed plans for Florida Rock. However, that was then and this is now, and in December the Zoning Commission will be again taking up Florida Rock's second-stage PUD. So we'll have to wait and see what changes have been brought by six years (and a baseball stadium next door).