Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Dec 22, 2005
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

I've added a search box to the top of my Near Southeast home page--when even I am having trouble finding stuff on my site, I figure it's time for a search capability :-). I also tinkered with the display along the right side of the homepage, beneath the map, adding thumbnails of the renderings for projects under construction, and doing some tidying up of the design.
More posts:
 

Stop the presses! I have NON-STADIUM news! Hallelujah! Construction has begun on Capper Seniors #2, the wraparound addition to the Carroll Apartments for low-income seniors at 4th and M. This new construction will add four stories and 130+ units to the 64 units in the Carroll building. Scroll to the middle of my Capper Seniors page for a rendering of the new construction, and photos of the current site. As for Capper Seniors #1 at 5th and Virginia, construction is speeding along, and I promise once the Christmas rush is over to post new photos. For more detail than one would ever want on the entire Capper/Carrollsburg project (and Canal Park, too), read the Feb. 2004 Zoning Approval for the Capper PUD.
 




                  © Copyright 2024 JD.