peek >>
Near Southeast DC Past News Items: Dec 16, 2006
In the Pipeline
1000 1st St.
Square 696
Yards/Icon Theater
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

A quick tidbit: on Friday Dec. 15, Clark/Hunt/Smoot (and Clark Concrete Construction) placed the first concrete deck on the club level at the new Nationals ballpark--ahead of schedule. And the steel for the upper deck continues to go in at a steady clip. I'm sure the mild and dry December has helped the construction timetable quite nicely. You can look at my latest photos of the site, although they're now two weeks old, which is ancient given the speed of work down there. And there's the official Stadium Construction Webcam if you want up-to-the-minute views.
More posts: Nationals Park
 




                  © Copyright 2018 JD.