peek >>
Near Southeast DC Past News Items: Dec 04, 2003

JDLand.com's Official Unofficial Guide, Updated for 2016!
In the Pipeline
One M/10 Van
Yards/Icon Theater
DC Water HQ
Yards/Parcel O
Lynch/Half St.
JBG/Half St.
Capper/Square 769N
2 I Street
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
Congressional Square
SC1100
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

The Office of Planning has released the completed Anacostia Waterfront Framework Plan, a 20-year blueprint for transforming the areas on both sides of the river, at an estimated cost of at least $8 billion. (12/3 WP article, plus a graphic detailing the plans). See my Other Projects page for more AWI links.

More posts:
 




                  © Copyright 2016 JD.