peek >>
Near Southeast DC Past News Items: Nov 30, 2010
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

If you see some work being done on the block bounded by 1st, K, L, and Half in the next couple of days, don't get all excited that construction might be starting on the Plaza on K project. DRI--who bought the block for $69.4 million in 2007--tell me that they are going to be doing some leveling work to get rid of the eight-foot hill in the middle of the lot, to make it show a little nicer for prospective tenants who might be looking at the site. There will also be new fences put up.
Plans for the site currently call for buildings totaling approximately 825,000 square feet of LEED Gold office and retail. The first phase would be 300,000-sq-ft 88 K, along with 77 I, a "headquarters" space that could provide either 125,000 or 250,000 sq ft of space. There are also plans for a 10,000-sq-ft public plaza, surrounded by 14,000 sq ft of retail, along with another building (50 K) in a later phase. You can see my project page for more details, or visit the official web site. There's no timeline at this point for when the project might get underway.
 




                  © Copyright 2021 JD.