Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Nov 02, 2006
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

On Nov. 2, the National Capital Planning Commission will consider approval of the design of Washington Canal Park, and someone was nice enough to pass along to me the Canal Park Concept Submission document that was prepared for the NCPC (and also the US Commission of Fine Arts's meeting on Oct. 19)--40 pages of incredible detail, with a long design narrative and many many drawings. UPDATE, 11/2: At today's NCPC meeting, the commission "commented favorably" on the design concept. The next stage will be the preliminary design stage, and the NCPC has requested that AWC provide "More fully developed streetscape designs at street edges and crosswalks; Simplified overall design with consideration of durable materials and elements that require less routine maintenance; Lighting design that has minimal visual impact on adjacent streets and mixed-use development; Details of water elements that demonstrates their character when water is turned off; and Design details indicating accommodations for the physically disabled, including persons with visual or hearing impairments." Finally, the commission "commended the Anacostia Waterfront Corporation and its design team for integrating low-impact development strategies that will minimize the effects of storm water runoff from the site."
More posts: Canal Park
 

If you are a resident of Capitol Hill Tower, you're invited to their next Shareholder Community Meet and Greet, on Nov. 9 (note changed date) from 6:30 - 9:00 pm, where the special guest of honor will be, um, me. Yes, I've agreed to unshackle myself from my computer and exit my dungeon temporarily to come chat with CHT residents about the goings-on in Near Southeast. So come on by and spend some time getting to know your neighbors, I'll be the one standing in the corner shaking uncontrollably from all the unfamiliar contact with actual live humans.
More posts: Capitol Hill Tower
 

From the Examiner: "The District is in the last stages of developing a handbook for moving tens of thousands of people in and out of the Washington Nationals new ballpark on game days. The handbook 'will define exactly how everything is going to be done on game days,' one planner said, including traffic and pedestrian movement, police presence, ambulance staging and fan parking. It will put in place specific mechanisms for movement, from when to restrict on-street parking to which roads to close for pedestrians. [...] Under the draft plan, on-street parking would be restricted to residents, while fans would be urged to take Metro or park at one of multiple off-site lots and garages. Season ticket holders could even be assigned a specific lot based on the direction from which they arrive. Variable message signs would be installed to direct traffic to or away from the stadium; sidewalks would be widened to handle the mass of pedestrians; and traffic signals would be adjusted based on vehicle volume and movement." Also, the restaurant in center field, originally a one-story circular structure (visible on many of the renderings), is now a two-story rectangular building, with the Lerners having expressed the desire for the change and then (believe it or not) footing the $2.8 million bill for the cost difference.
 




                  © Copyright 2024 JD.