peek >>
Near Southeast DC Past News Items: Oct 26, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

I had one ear tuned in this afternoon to Phil Mendelson's hearing on space needs for the police department (a follow-up to the Sept. 20 barnburner between him and Office of Property Management director Lars Etzkorn). This time it was Deputy Mayor for Planning and Economic Development Neil Albert in the hot seat, and he stated that plans for using the old Post Plant at 225 Virginia Avenue will be "finalized by the end of the year." He called the original plan to use 225 for the First Distrct police station, the evidence warehouse, and other MPD functions a decision by "a well-intentioned prior administration" that he can't advise the mayor to adopt. Mendelson disagreed strongly, and also said a number of times that if the eventual uses for 225 Virginia don't include any of the public safety agencies, then his committee has no jurisdiction, but that as a council member he will be very critical of any plans for the building that don't include the various urgent space needs of the police department.
Albert also talked about the plans for relocating the 1D station--it appears they have a location in mind, but Albert didn't want to discuss it in public. He did say that it is in Southwest, and that it is permanent space, not swing space. He also said that community leaders would be contacted for input before the plan is finalized. Despite skeptical questioning by Mendelson, Albert said that the timeline for a 2011 completion of the new Consolidated Forensics Lab at the current 1D location is still on schedule, and that with the 1D relocation sites being looked at, he's confident that 1D can be moved and built out without jeopardizing the planned start of construction on the lab in early 2009.
Mendelson is clearly frustrated with the decision not to use 225 Virginia, and with the run-arounds he feels he has received over the past few months (he had a long list of questions from the Sept. 20 hearing that he never received answers to), so it will be interesting to watch this continue to unfold.
 

I don't normally do this, but I've got a bunch of pretty small items, so I'll just run them together:
* There's finally a small piece in the big media about the plans to redo the 11th Street Bridges, from WTOP. Nothing new, except that DDOT hopes to begin the construction in 2009, contingent on that pesky little thing called federal funding.
* Monday's kick-off ceremony for the Capitol Riverfront BID is making its debut on DC Cable 16 tomorrow (Saturday), at 3 pm, with additional showings on Monday, Wednesday, and Friday also at 3 pm. If you don't have cable, you can watch its feed via streaming video.
* I've now posted Monument's 90-second animation of what the east side of Half Street will look like when finished. If it goes by too fast (or if you can't get it to work), you can see the stills I took from it on my Monument Half Street page. There's no sound, and in order to make it small enough to download in less than 12 hours, the quality is lower than the crystal clear original. But you'll get the idea.
* You may notice that the map at right on my homepage has acquired a bunch of new stars. Showing that razor-like sharpness I'm known for, I took just under five years to figure out that I could display projects on the map even if I didn't have enough room for them under the "selected projects" lists at left. But at least the stars are color-coded! Just hover your mouse over them, and you'll get the descriptions. And don't forget that you can also click on the tabs above the map to get to the directory of all completed, under construction, and in-the-pipeline projects. Now I just need to work on freshening up some of the neglected interior pages of the site; I'll do it during all that spare time I have.
 




                  © Copyright 2020 JD.