Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Oct 06, 2006
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

EYA has released details on the Workforce Housing program at Capitol Quarter. There are two floor plans to view (which are probably also a hint at the floorplans that will be available in the market-rate homes), as well as an extremely informative Workforce Housing Guidelines sheet explaining how the 90-or-so workforce units will be sold; details on deposit requirements, restrictions (lots of them), and income levels are included (along with a big NOTE: that just because your income falls within the accepted range doesn't mean you'll automatically qualify). Twenty workforce units will be available initially, and there will be a reservation lottery on Nov. 18. There will also be a seminar about the program on Oct. 11 at 7:30 pm at the Holiday Inn Capitol Hill (415 New Jersey Ave., NW), I'm not sure whether you need to be registered with Capitol Quarter's web site in order to attend. The guidelines sheet also mentions that construction at Capitol Quarter is expected to begin in the Spring/Summer of 2007, with units ready for move-in near the end of 2007, into 2008. And don't forget that the one-week preview period for the market-rate homes will begin on Oct. 14, pre-registration required.
More posts: Capper, Capitol Quarter
 




                  © Copyright 2024 JD.