Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Sep 19, 2006
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


5 Blog Posts

An e-mail has just gone out to folks who have registered previously at EYA's web site, announcing that the Capitol Quarter townhome project (on the site of the old Capper/Carrollsburg public housing project) will open for a one-week preview period on Oct. 14, during which the sales office will be open, and plans and prices will be available, but no appointments, reservations, or contracts will be taken. To get in on the preview, you need to re-register with EYA (at a new URL, www.eyacapitolquarter.com/), even if you've registered in the past, so that they can ensure you're still interested and that they have your correct contact info. The approximately 121 market-rate townhomes will start in the $500s, but there are also 91 "workforce" units: "If your income is less than $72,642 for a household of one, $83,183 for a household of two, $93,533 for a household of three, or $103,883 for a household of four, you may be eligible for the workforce housing program. The base prices of the workforce homes are projected to range from $295,000 to $350,000." Reservations for the first batch of market-rate homes will be accepted starting on Oct. 21; there will be a separate schedule for the workforce units, and EYA willl be holding a homeownership and financing workshop for those qualifying for these units. Plans and prices should be posted on the EYA web site in early October. There will also be 65 additional townhomes comprising 111 affordable rental and Section 8 home ownership units mixed into the community. As I understand it, they are projecting that construction will begin sometime in Spring 2007. (UPDATED to add additional information, and fix some numbers.)
More posts: Capper, Capitol Quarter
 

In case you don't make it a habit to look at my Neighborhood Events Calendar halfway down the home page (boo!), I'm making mention of a few upcoming meetings: Sept. 20 has the Capitol Hill Restoration Society's Preservation Café, "Barracks Row Below the Freeway"; Sept. 21 has a Washington Canal Park Community Stakeholders Meeting; Sept. 28 has an Anacostia Waterfront Corporation Public Board Meeting. See my calendar for times and places.
 

If you're an obsessive viewer of Clark/Hunt/Smoot's Stadium Construction Webcam, you already know this, but for you folks who don't check it every fifteen minutes, I'm passing along the news that they've added a second camera angle, now looking from the north of the stadium site. (It appears to have been set up on the roof of 20 M Street.)
More posts: Nationals Park
 

The Florida Rock mixed-use project had a second-stage PUD hearing at the DC Zoning Commission on Monday night; I missed the first 90 minutes, so I can't really give you a solid feel for how it all went; I did detect a fair amount of concern about the easternmost building of the project, an office building (now redesigned to include three floors of retail) at the terminus of First Street, specifically how it impacts the views of the river from the "grand staircase" of the ballpark. There were also still apparently some issues to be resolved with DDOT, the Office of Planning, and the AWC's new plan for a 39,000-sq-ft plaza at the foot of First Street. The Florida Rock folks will be back in front of the Commission in November to address the concerns brought forward. One interesting tidbit did sneak in during Adrian Washington's testimony--he said that the plans for the Ballpark District portion of the WASA site (AWC and Forest City are still in negotiations to acquire the land) is for it to be all residential, perhaps as many as 800 units. If that Ballpark Development Strategy ever sees the light of day, we'll get more details, I'm sure.

 

With construction getting under way at 100 M Street, the "Main Street" of Near Southeast is seeing yet another transformation. Since 1999, six office buildings have gotten underway in the short stretch between South Capitol and 4th streets. So I've (of course) added a new map to my M Street Overview page, detailing what's where and what's coming. And I've added a bunch of new photos as well.

More posts: M Street
 




                  © Copyright 2024 JD.