Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Aug 27, 2010
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

What a gorgeous morning. A morning perfect for taking photos. Perfect for taking photos along the Anacostia riverfront. At a park that's less than two weeks from opening. And so here's a gallery of Yards Park photos, with construction work still very much in evidence but with the site looking in pretty good shape. At more than 5.5 acres, there's a lot of park to photograph, so I left a lot of good shots on the cutting room floor, but hopefully this gallery will give you a good idea of what you'll see when the park has its Grand Opening Weekend Sept. 10-12.
One other piece of news to pass along--I was told today that it's expected that work will begin on the Boilermaker Shops rehab by the end of this year. As with the Foundry Lofts (which is getting restarted now), work on that much-anticipated retail space will take a year or so. (If you need a Yards primer, see my project page.)
 




                  © Copyright 2024 JD.