Yeeech. I managed to get out this morning before the rain started, and while there was a smidgen of sunlight at first, I've mainly got a bunch of gray, gray photos for you to look at. I updated the main
Stadium Exterior Construction Gallery (and have added a few new angles), plus the
north/
south/
east/
west additional views for the diehards. New things to look for: the arched steel atop the scoreboard, the rounded steel marking the construction of the outfield restaurant, a lot more glass installed on the southwest side of the ballpark, and the ever-growing west parking garage. There's also now a big ole' trench dug down the middle of Potomac Ave. and rounding up onto First Street (two roads now completely closed south of N Street to anything but construction traffic). But with these photos being so dingy, if there wasn't something obviously new and different in the shot, I didn't update every angle on every page.
I also posted some shots of the
Douglass Bridge extreme makeover, as work continues on the new ramp up from Potomac Avenue to the existing bridge. The rest the closed section of South Capitol Street doesn't look too different, although I did see that new sewer drains/curbs have started to be installed. (I also spied from the freeway a nice fresh layer of pavement on South Capitol heading into the underpass beneath M Street, but no pictures.)
And I also updated the
Onyx on First and
70/100 I Street pages as both those projects now have an additional floor since last week. And
100 M looks to be getting close to coming out of the ground.