peek >>
Near Southeast DC Past News Items: Jul 21, 2009
In the Pipeline
Yards/Icon Theater
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Those of you who actually visit the site to read my blog (rather than using RSS or e-mail) may have noticed a little addition late last week: the "More Posts" links at the bottom of each entry. These take you to all previous blog posts about a certain subject/development/location--it was possible to get to these lists by going to the project pages and clicking on the "News" tabs, but there are some subjects (like Cornercopia or the Little Red Building or the inauguration) that don't really have a project page but where people might want to easily browse past posts. You'll also find these categories (and there's a boatload of them) on my Blog Archive page.
I haven't yet added them to my RSS feed--because I'm lazy.
 

(I Tweeted this a week ago, then forgot to ever post it here.) From the WashBizJournal: "Florida Rock Properties Inc. is on the market for a joint venture partner to help develop its much-anticipated 1.1-million square foot project, which will put retail, office space and a waterfront plaza on the land across from Nationals Park." My RiverFront page has scads of renderings, showing the designs and planned phases; the initial plans were to construct the office building and public plaza on the east end of the site (by Diamond Teague Park) first; the later phases can't be built until the new Douglass Bridge is constructed and the old one demolished.
 




                  © Copyright 2018 JD.