peek >>
Near Southeast DC Past News Items: Jul 19, 2016
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

Another construction project is now confirmed to be starting soon, with the announcement earlier this month that Skanska has signed a $60 million contract to build the new DC Water headquarters on the banks of the Anacostia River.
For those who haven't been following along, the new building will be built as a "surround" to the existing red-brick O Street Pumping Station (no, not the historic Main Pumping Station).
Skanska's press release says that construction will begin this year, and is slated for completion in late 2017.
The Anacostia Riverwalk Trail bridge between the Yards Park and Diamond Teague Park will offer a prime viewing location for the construction, as you can see in the latest renderings passed along with the announcement (and I've included one of my shots of the existing O Street building for those who need refreshing).
This is the second office project that Skanska currently has in the neighborhood, as it is building the on-spec 99 M office building a few blocks to the north.
 




                  © Copyright 2019 JD.