peek >>
Near Southeast DC Past News Items: Jul 17, 2007
In the Pipeline
1000 1st St.
Yards/Parcel L
The Garrett
Square 696
Yards/Icon Theater
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Just a reminder that Wednesday night, July 18, the Metropolitan Police Department is holding a Community Meeting on the Relocation of the Metropolitan Police Department to the old Post Plant site at 225 Virginia Ave. Tommy Wells will be in attendance, as will representatives of MPD, the Office of Property Management, ANCs 6B and 6D, and other officials. It should be a well-attended meeting: there's the residents of Southwest, who are not happy that these proposed relocation plans include the move of the First District police station from Southwest over to Southeast; and the Friends of Garfield Park and other close-by residents, who are concerned about the parking and traffic issues.
The meeting is at St. Mark's Episcopal Church, 3rd and A Streets, SE, at 6:30 pm. If you want more background on this proposed move, scroll down through the "News" tab of my 225 Virgina Ave. page.
 

As I posted a few weeks ago, a request is now making its way through the process that would allow the construction of another batch of temporary surface parking lots, this time at The Yards, totaling an additional 950 spaces. Temporary surface lots are actually already allowed at The Yards under the Southeast Federal Center Zoning Overlay, subject to this mandatory review. The Zoning Commission hearing is on July 26, and the Office of Planning has completed its report supporting the request, saying among other things that these lots would actually improve the appearance of the parcels and surrounding area--if you've looked at the south side of Tingey Street, you know thiis isn't very far off. (The OP report has a lot of good detail on the Yards parking proposal, so be sure to read it.)
My network of moles inform me that at last week's ANC 6D meeting, after a presentation on the plan, no one made a motion to support it, and when one commissioner made a motion to oppose, no one seconded. (Voice of the Hill has a blurb on this meeting as well.) Ouch!
The case will also then be reviewed by the National Capital Planning Commission at its August 2 meeting.
If you want to know more about the state of ballpark-related parking, my Stadium Parking and Transportation page has the gory details, including a map of the possible lots and links to the slew of documents that have been generated over this subject. And the clock is now ticking on when that draft Transportation Operations and Parking Plan is supposed to be released (it was going to hit the streets in June, it was said...).