Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jun 23, 2016
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

For those keeping score at home, we have a new member of the above-ground-construction fraternity, with rebar now poking up at 1244 South Capitol Street, JBG's 290-unit apartment building on the northeast corner of South Capitol and N, immediately north of Nats Park.
(This is the site that has the tower crane with the lit crescent moon hanging from it, if you're someone who has gotten used to seeing that tableau from your seats at the stadium.)
The building is expected to be completed in late 2017ish, and will have 26,000 square feet of retail.
This lot is at the south end of the same block where the new National Association of Broadcasters HQ and its sibling 163-unit condo building 10 Van are expected to begin construction later this summer.
While I don't know anything specifically, I'm guessing that the owners of the Public Storage building that within two years or so will be sandwiched between two new luxury residential buildings get a lot of phone calls from developers.
Comments (43)
 




                  © Copyright 2024 JD.