Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: May 30, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

From DDOT, a reminder that the last weekend closure of the outbound/southbound lanes of the Douglass Bridge (i.e., the South Capitol Street Bridge) is on tap, starting at 10 pm Friday June 1 and reopening sometime before the Monday June 4 afternoon rush hour. Of course, in a few weeks we'll all be dreaming of the days of mere weekend closures, when the bridge is closed in both directions for all of July and August for its Extreme Makeover, when "the bridge's elevated northern approach will be lowered to become an at-grade roadway with a new intersection at South Capitol Street and Potomac Avenue. Additional improvements will occur such as paving and painting the entire bridge. Ultimately, nearly three blocks of elevated roadway--which currently act as a barrier to access across South Capitol Street--will be removed and replaced with at-grade intersections that will help knit the neighborhood together."
 




                  © Copyright 2024 JD.