Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: May 28, 2015
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Developer Jair Lynch's plans to finally get development going on the site at Half and N just north of Nats Park known in some parts as "Monument Valley" or the "Half Street Hole" went before the Zoning Commission on Thursday night for a Capitol Gateway Overlay Review.
I went into detail on the updated designs a few weeks ago, but the quickie summary is that there will be somewhere between 350 and 445 residential units (including condos!) in two buildings, and as much as 68,000 square feet of retail on two floors. (There could possibly be a small hotel as well, which would bring the residential count to the lower end of the proposed spectrum.) There would also be 231 parking spaces and bike parking in three underground levels, the hole for which, as we all know, has already conveniently been dug.
Both Jair Lynch and project architect Chris Harvey of Hord Coplan Macht talked about how the building is designed to bring the "indoors out, and the outdoors in," with huge windows for retail spaces and with the upper floors designed to take in views not of the surrounding skyline but of the street below, especially as the festive gameday atmosphere unfolds. "We believe it will define the ballpark entertainment district," Lynch said, calling it a "unique destination" for the three million people who visit the ballpark and the neighborhood every year.
The comments from the zoning commissioners were uniformly positive*, with the discussion going through especially zoning-y zoning issues, such as the design of the roof, the status of LEED certification (they're going for Silver, apparently), the lack of affordable housing (short version: this project is expensive!) and the location of a lobby entrance at the corner of Half and the new pedestrian-only Monument Place.
Much of the remaining discussion ended up centering around the streetscape plans, with commissioners agreeing that a curbless street being a wise decision with thousands of people walking through and not watching where they are going, but with DDOT needing to work with Lynch's group to decide exactly how to approach, since as of now DDOT really has no guidelines for such a design.
DDOT also appeared to be putting the kibosh on the idea of "catenary lights" across both ends of Half Street (which has been in the drawings for the site for many years), as well as wanting planned bollards ditched and wanting a different layout for sidewalk trees, since the lack of overhead wires on Half means that there could be a substantial tree canopy if the proper trees are used.
In response to a question from commissioner Robert Miller, who described the project as "very long-awaited and dynamic and exciting," Lynch said that the expectation is to break ground in 2016 and be finished in 2018 (presumably in time for a certain all-star event). Cushing Street would be used as the route for construction vehicles (though work would stop three hours before any Nats game), but Lynch also said that the fact that the excavation is mostly complete "should help tremendously."
With the Office of Planning and DDOT each supporting the plan as long as a few items are addressed, and with ANC 6D having voted to support it as well, there appears to only be the need for some mopping up submissions (renderings from street level for Cushing Street and Monument Place, better roof plans, the fixes for OP, yadda yadda), it sounds as if this project should be voted on favorably, perhaps at the June 29 commission meeting.
My page for this Half Street project gives additional details on the site, as do my previous posts.
And maybe before too much longer we'll see some details of JBG's plans for the other side of the street.
* Or, in the case of Peter May, not actually negative.
 

A missive from CSX just now:
"CSX today started the major construction phase of the Virginia Avenue Tunnel Project. The support of excavation work now underway consists of drilling 42-inch holes for steel and concrete pilings that will support a temporary retaining wall necessary to construct the first new permanent tunnel elements. This work is taking place at the west end of the project site in public space near 2nd and H Streets, S.E."
It goes on to say that similar work will get underway at the eastern end of the tunnel near 11th & M SE "within the next few weeks."
As always, to get more information, check out my Virginia Avenue Tunnel page (which probably needs a bit of freshening) or the official VirginiaAvenueTunnel.com web site, where you can also sign up to be on the project mailing list.
 




                  © Copyright 2024 JD.