peek >>
Near Southeast DC Past News Items: May 28, 2010
In the Pipeline
Homewood Suites Hotel
1111 New Jersey
Yards/Parcel A
1244 South Capitol
Florida Rock
Ballpark Square
Virginia Ave. Tunnel
New Douglass Bridge
Southeast Blvd.
Yards/Condo Project
Yards/Icon Theater
1333 M St.
New Barracks
Akridge/Half St.
Monument/Half St.
Capper Apts.
250 M St.
Nat'l Community Church
909 Half St.
Factory 202/Yards
Congressional Square
1000 South Capitol
SC1100
Completed
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
Posts on Food/Fun
Retail News
Restaurants/Nightlife
 

Ads by HillAds
  
Rearview Mirror
Blog Archive
Demolished Buildings
Historic Photos & Maps
Past Events Timeline
On the Hill, '59-'69
From Above, '49-'08
Gas Prices Gallery





Go to Full Blog Archive
1 Blog Posts

I've been chroncling over the past few months the Marine Corps' search for a spot for a new barracks, which has focused on a number of sites in Near Southeast, including the block bounded by Fifth, Seventh, L and M just south of their newest barracks that used to be home to the old Capper Seniors apartment building. It's been clear in public meetings and various other rumblings that both city planning officials and the DC Housing Authority are very much against the Marines using this site, with plans having been in place for a number of years for this now-empty/parking-lot block to become home to both a 600,000-square-foot office building and a 189-unit mixed-income apartment building (shown above) as part of the Capper/Carrollsburg redevelopment.
Clearly feeling that the Marines haven't given up on the site as an option despite these plans, DCHA has now sent the Marines a letter officially requesting that the Corps "not continue to propose redevelopment options on the DCHA-owned Square 882 as a future site for its facility needs." The letter explains that DCHA has already secured funds to improve the infrastructure around the square, has spent "substantial predevelopment funds" on design and engineering drawings, and is anticipating beginning work on the residential portion of the site in October. (There's currently no timetable for the office portion.) Further, DCHA says it "recently received an invitation from HUD to submit an application for a FHA loan guarantee to support the planned residential construction on the site," and that this construction is expected to start "this winter."
Nothing in the letter is necessarily a surprise--I've written fairly extensively about DCHA's plans and about the zoning travails they went through before getting a second-stage PUD approval for Square 882 last year, which even included many discussions and agreements with both the Marines and the Navy about security requirements for the new buildings on this block. But clearly DCHA is hoping to be completely removed from the Marines' list of potential sites in the same way that the DC Public Schools (and parents) got Tyler Elementary removed from consideration. But it's also clear from the public workshops that the Marines very much like what Square 882 has to offer them in terms of space and proximity to the other USMC operations in the area.
The Marines are hoping to make a decision on a site by September. You can see all the sites under consideration and the various options on the "Community Integrated Master Plan" web site.
 




Blog/Home
Project Directory
Photo Archive
Event Photos
 
Nats Park
Food Map
What's New
History

 
Demolished Buildings
Historic Photos
Satellite Images
Timeline
 
About JDLand
Message JD
Advertise
Photo Use
 
     © Copyright 2014 JD.