Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: May 03, 2012
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

As the Fairgrounds prepares to begin its daily hours on May 4, the outdoor event space just north of Nationals Park at Half and M is also starting to promote some of its non-gameday offerings:
* The Truckeroo food truck festival will be back for another year, on five Fridays this summer: May 11, June 8, July 13, Aug. 10, and Sept. 28, running from 11 am to 11 pm each time.
* There will also be a new "Family Day" event, with a promo flyer describing it as having "carnival games and prizes, inflatable and mechanical rides, children's entertainers and live musicians," plus food trucks. Admission will be free, and scheduled dates so far are May 13, May 27, June 3, June 10, and June 24, from 11 am to 4 pm.
All have been added to my Events Calendar, for future reference.
(Perhaps this is also good timing to finally link to this Housing Complex post from last week showing what the site could look like if it ends up with advertising on the sides of the shipping containers, which WCP says Fairgrounds was soliciting.)
 

Earlier this week the Federal Highway Administration and DDOT gave notice that the in-process National Environmental Policy Act study of CSX's Virginia Avenue Tunnel project will be switching mid-stream from an Environmental Assessment to a more detailed Environmental Impact Statement study.
Since the outcome of an EA is often the instigation of an EIS, this is probably serving mainly to speed up the process and get started on an EIS that most likely would have been needed anyway. The NEPA web site mentions that "[i]f a federal agency anticipates that an undertaking may significantly impact the environment, or if a project is environmentally controversial, a federal agency may choose to prepare an EIS without having to first prepare an EA," both of which would certainly seem to be ways this project could be described.
If you want to see how extensive an EIS can be, check out the ones completed for the 11th Street Bridges reconstruction and the planned South Capitol Street corridor improvements.
The information already gathered and feedback already garnered during the EA process will be incorporated into the EIS. CSX representatives tell me that they expect the switch to add about six months to the environmental review process, and the project's web site now has a Spring 2013 date listed for the Final EIS/record of decision. CSX has always wanted the project to be done in 2015, to coincide with the opening of the expanded Panama Canal, but that timeline is starting to look a bit dicey given that construction has been expected to take 2-3 years.
The public meeting to unveil the chosen "alternative" designs that the EIS is studying is currently being planned. You can read my write-up from the last meeting to see more about the initial group of concept designs, which ranged from expanding the tunnel to building a separate parallel tunnel to leaving the tunnel untouched to closing it and having CSX reroute all their traffic rerouting the double-stack traffic and through traffic out of the city (UPDATED to fix my mistake--there is no proposal that would close the tunnel altogether). (It probably isn't hard to guess which alternatives are preferred by the Capitol Quarter Homeowners Association, with CQ's homes on Virginia Avenue standing mere feet away from any construction.) UPDATE: It's been requested that I mention that, while the CQ HoA letter above lists a group of possible signatories, at least three of them (ANC 6B, Barracks Row Main Street, and the Committee of 100) have all already voted against co-signing the letter.
For those blissfully unaware of this project (I wish!), CSX is needing to expand the 105-year-old tunnel that runs beneath Virginia Avenue between 2nd and 12th streets, SE so that a second track can be added and double-height cars can be accommodated. With initial plans calling for the extended closure of Virginia Avenue and a temporary track in an open trench to run trains through during construction, residents on both sides of the freeway have been greatly concerned about how the work will be designed and carried out, which then spurred DDOT to request a formal environmental review (despite this being a project being carried out by a private entity on a right-of-way that they own some of).
My pile of posts over the past few years on the subject may also be enlightening, or may not.
UPDATE: This flyer just posted on the VirginiaAvenueTunnel.com web site says that the next public meeting, announcing which concepts will be looked at in the EIS, is scheduled for May 21 from 6 to 8 pm at Nationals Park.
 




                  © Copyright 2024 JD.