Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Apr 26, 2016
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

I suspect this will bring about some strong feelings, but it is still incumbent upon me to report that a raze application has been filed in recent days for the McDonald's at South Capitol and I Streets.
This is where RCP Development is planning a two-phase project that will start with a 380-unit apartment building.
I know nothing about any expected closing date for Mickey D's, which was just renovated in 2012. But I have heard rumors that the developers are looking to start construction on the apartment project late this year, and this raze application would certainly seem to be in line with that.
As a devotee of McDonald's fountain Diet Coke, I am willing to go on record in saying that this pains me.
 

F1RST VIEW: The 325-unit apartment building known as F1rst is still a number of months away from completion, but that hasn't stopped the developers from sharing a rendering of the eventual view from the roof, billed as the city's "first rooftop stadium-seating view into Nationals Park." (Which is true, though spoil-sport me must mention that there will eventually be another building between F1rst and the ballpark, with as-yet-unknown impacts on the F1rst line of sight.) It's expected to be ready by Opening Day 2017.
BROWN PLAGUE: I have said on a couple of occasions that it sometimes seems like every new resident of Near Southeast/Capitol Riverfront/Navy Yard/#NeCaBaRY is issued a dog upon arrival, and there's now a colorful missive from the BID and Anacostia Riverkeeper about the impact of un-picked-up-poop on the neighborhood and the river. THIS MEANS YOU. (Signed, the owner of two indoor-only cats with zero patience for dog owners who don't clean up.)
BARRY PREP: The prep work for the May 7 departure of the USS Barry is now underway, and users of the Riverwalk should expect closures at various times between now and the departure date.
DERBY DAY: If you find yourself in need of a libation or two after waving goodbye to the Barry on May 7, Due South is inaugurating its first annual Derby Day, from 3 to 7 pm. There will of course be juleps (including mint, sweet tea, bourbon punch, and a bottomless frozen mint version for $40), along with Derby-themed food specials like Beer Cheese Crostini, Kentucky Hot Browns, ham and biscuits, "Kentucky Fried Chicken," and more. There's also going to be prizes and giveaways, and a hat contest for the ladies.
 




                  © Copyright 2024 JD.