Near Southeast DC Past News Items: Mar 29, 2015
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

It's been a while since I've been down to the shores of the Anacostia at 1st Street (I'm old/it's been cold/I'm tired/I'm lazy), but on Saturday I finally made the trek to Florida Rock, and saw what I expected to see--a concrete slab at the bottom of the two-story excavation for the 305ish-unit residential building "The Riverfront," along with the base of the project's crane being put together.
I snagged a peek-through-the-fence shot of the hole, though before long I'll get to start taking photos of it from up above, on the viewing platform at Nats Park. (While I, uh, watch baseball, too. Yeah, yeah, that's it.)
Here's the riverfront view of the Riverfront footprint (below left), matched to the rendering of the same spot (center). Plus, at right, a shot looking from Diamond Teague's pier to the staircase at Nats Park, giving a sense of the plaza that will be there (and that one sightline from the staircase to the river will still exist after the apartment building is completed).

/This building, the first phase of the overall 1.1-million-sq-ft mixed-use redevelopment, is expected to be finished in late 2016. It will have a little more than 18,000 square feet of ground-floor retail, and two levels of underground parking (as you see!). There will also be an extension of the Anacostia Riverwalk Trail.
The Phase 2 land immediately to the west of the new building is expected to be temporarily remade as a "beach" area, including volleyball courts, with additional space for parking and other temporary uses. Which is all separate from Bardo's potential "brew garden" plans for the two acres to the west of THAT site, on the portion of the Florida Rock footprint that edges up to the current Douglass Bridge.
See my Florida Rock page for lots more photos and renderings.
UPDATE: I finally made it up onto the Douglass Bridge on Sunday for the first time in forever to take some photos, and got an even better view of the excavation and its position in relationship to the ballpark. So, let's all look at this and start to mentally prepare for the change in the view not only of the ballpark, but from the ballpark.

 