peek >>
Near Southeast DC Past News Items: Mar 21, 2011
In the Pipeline
One M/10 Van
Capper/Square 769N
1250 Half St.
JBG/Half St.
The Garrett
Capper/Square 767
1000 1st St.
Yards/Icon Theater
Yards/Parcel L
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
Square 696
SC1100
Completed
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

The proposed 8th Street Beer Garden is back before the Historic Preservation Review Board, with a "substantially simplified" design that the board's staff has deemed sufficiently compatible with the character of the surrounding Capitol Hill Historic District.
The first floor is now proposed to have a brick veneer (though it's not really shown on the new rendering that the beer garden team was kind enough to pass along), and there have been other changes that HPRB staff say have improved the overall proportions of the building. There's also now a pergola (arbor) on the roof to help with shading on sunny days. Sidewalk seating spaces are also shown, though the developer will have to get a public space permit and work around the bus stop currently at the 8th and L intersection.
There are still a few small issues the HPRB staff would like to see addressed, but they have recommended that the concept be approved by the board, and the project has been placed on the consent calendar for the March 24 meeting. (Though the board may choose to remove it from consent if they have any issues they want to discuss before voting.)
You can see a larger view of this revised design alongside the previous version and some current photographs on my new 8th Street Beer Garden page, which isn't exactly a barn-burner but at least it's something. (It goes hand-in-hand with my new National Community Church page, which has photos of the lots NCC now owns.)
The HPRB meeting is on Thursday at 10 am, and will be available via live streaming or on demand. (Or you could go to the meeting in person, but that's so 20th century.)
UPDATE, 3/24: The consent portion of the agenda passed with no discussion, so the design concept is now considered approved by the board ("as consistent with the purposes of the preservation act"), with final approval delegated to HPRB staff.
 




                  © Copyright 2017 JD.