Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Mar 18, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

Still working my way through the pile of pictures I took today.... New shots posted of the ongoing work at the Monument Half Street site, and also some "substantially complete" shots of 20 M Street--in a couple photos you can see men working on the far left window on M Street, and a reader gave me a heads up that not more than a few minutes after I came through, they posted a sign saying "Wachovia Coming Soon." So, if that's indeed the case, that would be the first 20 M tenant we've heard of.
 

A beautiful if chilly late winter day today drew me out for a belated update to the Nats Ballpark Construction Gallery (I was out of town; don't shoot me for being a week late!).
Speaking of construction, Saturday's Washington Times reports that the DC auditor has determined (to the chagrin of David Catania, no doubt) that the stadium remains beneath the mandated $611 million budget cap: "Nichols said budget projections for certain parts of the project have increased, but that the overall project remains on budget. [...] But Nichols said these new costs do not violate the cost cap, because the city was able to make up the difference in savings or reductions to other budget items. Commission budget figures show the city spent about $17 million less than estimates on financing for the stadium and about $2 million less than estimates on installation of utilities. The commission also reduced its contingency for the project from $19 million to about $9 million. Several council members including David Catania, at-large Independent, have claimed that the sports commission should include the cost of improvements to Metro and roadwork as part of the ballpark budget. But Nichols said those costs, which total $36 million, are not part of the $611 million budget. "
More posts: Nationals Park
 

The DC Property Sales database reports that, on January 29, "noted" DC developer Douglas Jemal (in the form of Jemal's Ballpark LLC, Douglas Development) paid $4.25 million for 1201-1225 South Capitol Street, the two one-story gray buildings that run on the west side of South Capitol between M and N streets. Haven't heard anything about any plans for the site; it's currently home to a couple of small businesses. Jemal already owns a number of somewhat-close-to-the-stadium properties down in Buzzards Point.
More posts: South Capitol St.