Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Mar 16, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

While you ponder the upcoming Zoning Commission vote on the 1325 South Capitol Street residential project, you can gaze at a new drawing of the building, nicked from the WDG Architecture web site. It's certainly a much more detailed and spiffier rendering than what was previously released....

 

On Wednesday March 21, the AWC is holding an Anacostia Riverwalk Trail and Parks Public Meeting; to quote from the announcement, "The Anacostia Riverwalk is a continuous 20 mile trail system that will link public parks, plazas, and neighborhoods to the Anacostia River. A major section of the trail is due to be completed this year. Come learn about the Riverwalk and the many new parks to be built along the Anacostia Waterfront." There's an open house at 6 pm, with the presentation and discussion from 6:30-8 pm; it's at the Ellen Wilson Center at 750 6th Street SE (just north of the freeway). For more information, contact: Diane Sullivan, Project Director, at (202) 406-4028 or diane.sullivan@awcdc.com. (This announcement isn't yet posted on the AWC web site, so no link, alas.)

 

The Zoning Commission has deferred until its March 26 Special Public Meeting any decision on whether to allow Capper Seniors #2 to be redesignated as a mutlifamily workforce (30%-60% annual median income) dwelling in addition to having its low-income senior citizens units. ZC chair Carol Mitten noted a bit of a disconnect between statements offered by the DC Housing Authority and the Office of Planning, and so both are to meet before March 26 to formulate a recommendation.
The March 26 special meeting will also have the ZC's final vote on the 1325 South Capitol Street residential project, and also the "minor modification" being requested at 100 M Street.
And, since I gave the Office of Zoning a bit of a hammering a few weeks back when they debuted their new online calendar, it's only fair that I now rave over the return of monthly at-a-glance lists for Zoning Commission and BZA meetings, which make finding out what's happening far far easier. Thanks, guys, not only is it great to see this functionality back, but you did a really nice job with it, too.