Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Feb 22, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

Thanks to reader Scott for snagging this press release off the wires [links mine]: "Patriot Transportation Holding, Inc. announced today that its subsidiary, Florida Rock Properties, Inc. ("FRP"), continues to pursue its efforts to obtain approval of a final planned unit development application for its Washington, D.C. property located on the banks of the Anacostia River across Potomac Avenue from the new baseball stadium being constructed for the Washington Nationals. In response to comments recently received from members of the District of Columbia Zoning Commission, FRP is seeking to refocus the proposed project to respond to the concerns raised. FRP believes that its proposed project, which had previously received preliminary approval, will complement the new stadium and will contribute to the overall redevelopment of the baseball stadium district. At this time, Patriot is uncertain when the Zoning Commission will act finally on the FRP application or what action the Commission may take." If you read on, you'll even get a nice little explanation as to how Florida Rock Properties, Florida Rock Industries, Patriot, and Vulcan Materials are connected (or not connected). It's like they wrote it just for me! For background, read these previous posts.
More posts: Florida Rock, zoning
 




                  © Copyright 2024 JD.