peek >>
Near Southeast DC Past News Items: Feb 17, 2011
In the Pipeline
One M/10 Van
Capper/Square 769N
1250 Half St.
JBG/Half St.
The Garrett
Capper/Square 767
1000 1st St.
Yards/Icon Theater
Yards/Parcel L
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
Square 696
SC1100
Completed
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

This was referenced in the flurry of stories on the company a few weeks ago, but Monument Realty has now officially announced that they have signed a 10-year 50,000-square-foot lease with the Federal Aviation Administration at 55 M Street, the building on top of the Navy Yard Metro station just north of Nationals Park. With this lease, DDOT's 150,000-square-foot lease signed last fall, and two other smaller tenants, the 275,000-square-foot building is now 85 percent leased, with only three smaller office suites remaining (as well as all of the building's ground-floor retail space).
The press release says that the FAA is expected to move into their new spaces on the 8th and 9th floors in April, and that DDOT is expected to complete its move to the fourth through seventh floors during the second quarter of the year.
As for the rest of the Monument Half Street project, which as designed includes a 200-room hotel and 332 residential units and plenty of ground-floor retail to the south of 55 M, the press release quotes executive vice president Douglas Olson as saying that they are"actively working to move forward with Monument's next phase of Half Street."
 




                  © Copyright 2017 JD.