Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Feb 15, 2011
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

I keep saying I'm never going to take any more photos of politicians at microphones, but who can resist them slinging sledgehammers? This morning there was a brief ceremony officially kicking off the redevelopment of 225 Virginia Avenue, turning what was the old Washington Star building and then Washington Post printing plant into 200 I, a 320,000-square-foot LEED Gold office building housing three city agencies. Here's a slew of photos, not only of the ceremony but also a few images from inside the building, as well as two renderings of what the lobby will look like when it's completed.
Though the sun was out, the assembled guests (and gate-crashers!) probably wished this little shindig had been held yesterday, when it was about 25 degrees warmer. But at least it made for a quick event, which didn't seem to bother anyone too much.
The renovation is expected to be complete and tenants moved in by the second quarter of 2012. The Office of the Chief Technology Officer, the DC Commission on the Arts and Humanities, and the Child and Family Services Agency will all be occupying the building, and there may also be some "incubator retail space" on the ground floor's southwest corner. There will also be an art gallery in the new lobby that will open out onto I Street and Canal Park, showcasing works from the Arts and Humanities commission's collection. There will also be 180ish parking spaces on site, some in the building's basement but about 100 of them in a two-level parking deck on the 3rd Street side of the building (where the current surface lot is). And the loading dock will now be just west of 3rd, on Virginia.
The building was bought by the city for $85 million in 2009, and then leased it to StonebridgeCarras in a 20-year lease/leaseback agreement to fund the construction. You can check out my 225 Virginia project page for lots (and lots!) of background on this building, though the page isn't quite up-to-date with today's stuff. Yet.
 




                  © Copyright 2024 JD.