peek >>
Near Southeast DC Past News Items: Feb 13, 2009

JDLand.com's Official Unofficial Guide, Updated for 2018!
In the Pipeline
Yards/Icon Theater
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Eagle-eyed workers at USDOT had asked me about this lately, and now WBJ confirms (subscribers only) that work has stopped at the Foundry Lofts rehab project at the Yards: "Forest City Washington started transforming a former Navy industrial building into 170 loft apartments last year but recently called off the construction crews thanks to, you guessed it, a lack of financing -- in this case an inability of the D.C. Housing Finance Agency to sell bonds for the subsidized units."
And, there's this: a Forest City rep says "work continues on a waterfront park and landing retailers for the 44-acre, multiyear project, but sources say Dogfish Head Alehouse, once in discussions to open on the waterfront, is no longer interested."
So now the neighborhood has its first "skeleton."
UPDATE: On the other hand, WBJ is also reporting that chain brewery Gordon Biersch might be coming to Half Street, with a broker confirming that there is interest, but no deal has been signed: "Gordon Biersch is remaining mum, but sources point to Monument Realty's Half Street project as a likely candidate. The D.C. developer is putting the finishing touches on 55 M St. NW [um, no: SE], a 275,000-square-foot office building with ground-floor retail above the Navy Yard Metro station. The project, on the main pedestrian drag to the baseball stadium, doesn't have any announced tenants."
 

UPDATE: Here are a few photos from the ceremony, along with a closer peek at the construction underway.
(Original entry) Just got back from the ceremony at Diamond Teague Park; while I'm working on the photos, here's the press release about the event, which I'll note contain the same April-for-the-piers, July-for-the-park timeline I've been mentioning (and yes, I'm being lazy and just reproducing the press release--rough morning!):
"Mayor Adrian M. Fenty on Friday joined community leaders in a groundbreaking ceremony for Diamond Teague Park, an $8 million waterfront park that will link Nationals Park to the Anacostia River.
"'Diamond Teague committed his life to restoring, protecting and preserving the Anacostia River,' Mayor Fenty said. 'This park will be a fitting tribute to his legacy and it will mark our commitment as a city to carry on his work.'
"The park is named after 19-year old Diamond Teague, a member of the Earth Conservation Corps (ECC) who was murdered in 2003. The ECC members -- many live in communities along the river's banks -- work to improve the river's health and protect the plant and animal species that call the Anacostia home.
"[...]It will connect the ballpark to a pair of public piers and a 20-mile network of waterfront trails. A 250-foot pier will be built to host commercial vessels such as water taxis and charter boats. The pier will also include slips for the ECC and the District's fire and life safety vessels.
"The park will feature a separate 200-foot environmental pier for educational groups, kayaks and canoes. The piers are expected to be complete by baseball's Opening Day, April 13, 2009.
"Construction and planting work on the upland portion of the park will be completed by July. Muralist Byron Peck and City Arts are also working to complete a memorial dedicated to Diamond Teague that will be unveiled later this summer.
"The cost of the $8 million park is being covered through dedicated revenue streams tied to a number of adjacent economic development projects that surround the park including Florida Rock's one million square foot mixed-used project directly to the West of the park and JBG's U.S. Department of Transportation headquarters building to the East."
 




                  © Copyright 2018 JD.