Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Feb 03, 2014
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

During Monday night's Zoning Commission hearing on allowing the move of the trapeze school from "Parcel O" at 4th and Tingey in the Yards to another space at New Jersey Avenue, Forest City's Ramsey Meiser revealed that the company is planning to sell a portion of Parcel O to allow for the development of a condo project there.
Meiser explained that while Forest City doesn't do condo development, "we want to have for-sale product at the Yards," hence the potential deal. The zoning filings say that "Parcel O will be developed in 2014/2015 and construction on Parcel O is expected to be completed by 2016/2017."
I've asked for further detail on this, which I may or may not get anytime soon, and I will update when I receive more.
Other tidbits that came out of the hearing:
* Forest City is in the process of hiring an architect to design a residential building for Parcel H, which is the western half of the parking lot on the southeast corner of 1st and N, directly across from Nationals Park and north of DC Water. There appears to be a desire to develop that site within the next couple of years.
* The company expects the demolition of the NGA building at 1st and M to take approximately six months, and that the reconfiguration of the block to include the trapeze school, a new park on the north end, and a slightly shrunken parking lot would be completed by the end of 2014.
* The new park, which with the rest of the block would be a temporary use until office buildings are constructed, has enough open green space that Forest City expects to work with the BID to activate it for some sorts of smaller sports activities (bocce and kickball yes, softball probably not).
Oh, and the commission voted 5-0 to approve the special exceptions to allow trapeze school and parking lot on the south end of the 1st and M block, on the sites technically known as Parcels F and G. (The park would be on Parcel A.) There was some back-and-forth about the need for trees on the site--they weren't included in the plans because Forest City expects buildings to eventually replace the temporary uses, but Forest City has agreed to work with DDOT and the Office of Planning on the issue, and the zoning commissioners did not feel it warranted delaying their vote.
UPDATE: In my haste to get this posted, I should have mentioned that the original Yards plans did include a condo project--a plan to have PN Hoffman convert Building 202, the red brick building at 5th and M east of what's now Twelve12. But that project has seemed to stall.
 

In a nice break from its evaluations of boxy 13-story buildings, the Zoning Commission this week has on its agenda two cases dealing with somewhat unusual development requests at the Yards.
The first, which is being heard tonight, has to do with the reconfiguration of the block at 1st and M streets SE after spooky Building 213 gets demolished sometime in the coming months.
As I wrote back in December, Forest City is wanting to move Trapeze School New York from its current 4th and Tingey location to the northwest corner of New Jersey and Tingey, shrink and reconfigure the existing 1st Street parking lot by 22 spaces, and build a temporary public park on the north half of the block. (The overview drawing at right can help you visualize this.)
The parking lot and the trapeze school move each require zoning approvals for these new temporary five-year uses--if you want the serious details on why, and the evaluation of the zoning rules therein, read the Office of Planning report.
ANC 6D and the Office of Planning have both supported this request, and this week the National Capital Planning Commission is adding its support.
So, in honor of what apparently will be a year of change on this block, I've built a Yards Parcel A project page, to be sure that Building 213's soulless windowless existence (and its brief ArtYards fling with color) is not forgotten.
The second zoning request, to be heard on Thursday, Feb. 6, is to amend the text of the Southeast Federal Center Overlay to allow "veterinary boarding hospital and veterinary hospital uses" subject to a number of conditions within the footprint of the Yards.
This text is being added because of apparent interest from a veterinary hospital in leasing space in the ground floor of the soon-to-be completed Twelve12 apartment building at 4th and Tingey, and the SEFC overlay does not specifically allow veterinary services, so it has to be spelled out.
And it's not a surprise that a vet is looking at the area--the Office of Planning report sites a Capitol Riverfront BID survey saying that 40 percent of neighborhood residents have pets.
The Office and Planning and ANC 6D also support this request.
 




                  © Copyright 2024 JD.