Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 22, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

With the daily Building Permit feed continuing to be on the fritz, it's back to finding out about approved permits on Mondays, via the Never-Ending PDF File. Today's news (on pages 182 and 186, for those of you following along at home) is that the building permit has been approved for 909 New Jersey Avenue, JPI's 244-unit residential project on the block where the Nexus Gold Club recently closed; an excavation permit was approved as well. In one of the articles on the Nexus closing, JPI said it was planning to begin demolition on the site in March. In other permit news, a bunch of soil boring permits were approved (page 183) for the Monument Realty/Half Street site.
 

The next Police Service Area (PSA) 105 meeting, which covers Capitol Hill as well as most of Near Southeast, is scheduled for Saturday, Jan. 27 at 10 am, and is being held in the 1st floor community meeting room at Capitol Hill Tower--and they're offering a tour of the CHT building after the meeting as added incentive.
More posts: Capitol Hill Tower
 




                  © Copyright 2024 JD.