Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 15, 2008
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

Metro has just launched a new web page to help stadium-goers plan their trips to Nationals Park via public transit. It's at wmata.com/nationals, and it gives links to Metro's Trip Planner, information on Metrobuses that stop near the ballpark, how to use the parking lots at Metro stations, and more. And, for you diehards: "Metro will soon be offering a choice of commemorative SmarTrip cards, available for a limited time only."
Also, the parking information for season ticket holders is starting to arrive in mailboxes around the area today. I'll link to the Nats' web site with the information once they've got it up, but until then, here's the map of the four parking zones and the prices per game that ticket holders will have to pay. (Note, none of the zones are in Southwest.)
I'll be updating my Ballpark FAQ and Stadium Parking/ Transportation pages with this new information as soon as I find the 25th hour in the day.
 

The official announcement will come soon, but Monument Realty has confirmed to me that today they are turning over to WMATA the west entrance of the Navy Yard Metro station --on schedule--so that "fare installation" can begin (i.e., making the entrance useable). Monument says they completed their building structural commitments to WMATA back on Dec. 21. (hat tip to Nats320)
If you look at the Half Street web cam, you can see that the station entrance at lower center does look like it's getting cleaned up somewhat. Monument's initial Half Street project--office, hotel, residential, retail--is not scheduled to be completed until the end of 2009, but the Metro station is expected to be reopened in time for the beginning of baseball. The 55 M Street office building is currently being built on top of the Metro entrance; the southern half of the block, which is currently a big hole but where a hotel and residential units will be offered, should see construction begin soon. Retail will line the ground floor (and some second-floor spaces) all along Half. No tenants have been announced yet for the retail spaces, and, as I mentioned this morning, Monument appears to be looking for a new chain to operate the 200-room hotel.
As for what Half Street will look like during the inaugural season of the ballpark while construction continues, the Office of Planning report on Monument's request for some minor modifications to their Half Street designs has a description: "As part of the original proposal, the applicant showed a covered walkway on the east side of Half Street as a temporary condition during construction. Present plans call for pedestrian traffic to be directed to the other side of Half Street on non-game days, and for the entire street to be opened to pedestrian traffic on game days. Therefore there is no need for a covered walkway. The applicant has committed, however, to maintain a decorative fence at the edge of their construction zone as generally shown in the original plans."
 

On Monday night the Zoning Commission considered two Near Southeast cases on its consent calendar. I wasn't there (having chosen to go to the ANC meeting scheduled for the same time), and the ZC's web feed experienced technical difficulties, so I'm posting some bare bones info that folks at the meeting have been nice enough to pass along.
Monument Realty asked for 22 "minor modifications" to its previously approved design for the under-construction eastern side of Half Street. According to the Office of Planning report, the changes mostly centered on adjustments to the exterior architecture and the layout of the residential component. The most noteworthy change request is probably switching from a multicolored LED screen at the Metro entrance at Half and M (which WMATA turned down, apparently) to a backlit laminated glass panel. Also, nestled deep in the OP report is a request to modify the design for the hotel windows because the "hotel operator has pulled out" -- early on, the word had been that W Aloft would be running the midblock hotel on Half Street, but apparently this is no longer the case; I've heard nothing on any new operator. You can read the report to see the other requested changes. Though this was on the Zoning Commission's consent calendar, and the commission acknowledged that the changes are small, they still wanted to see some renderings showing the befores-and-afters of the proposed changes, and have scheduled a special public meeting for Jan. 28 at 6 pm to consider the request.
Now that the eastern side of Second Street (running along Canal Park) is considered "re-opened" (it's a long story), the developers of 250 M Street are requesting to base the office building's height on the width of Second Street, which is wider than M Street. This would allow 250 M to go up to 130 feet, which apparently is the same as the height of 1100 New Jersey on the west side of the park, although apparently the building's planned square footage would actually decrease slightly which would increase the total square footage to 233,405. Though this was on the consent calendar, the commission asked the Office of Planning to submit a report on this, and there will be a public hearing.
UPDATED to fix an error about 250 M's proposed new square footage.
 




                  © Copyright 2024 JD.