peek >>
Near Southeast DC Past News Items: Jan 03, 2007
In the Pipeline
One M/10 Van
Yards/Icon Theater
DC Water HQ
New Douglass Bridge
Yards/Parcel O
JBG/Akridge/Half St.
Lynch/Half St.
Chiller Site Condos
Yards/Parcel A
1333 M St.
Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
Congressional Square
1000 South Capitol
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
Go to Full Blog Archive

1 Blog Posts

Adding to the projects that look to be starting in 2007, it appears that the 1111 New Jersey Avenue office building being developed by Donohoe is moving forward--they've recently applied for a zoning special exception ("for a waiver of the rear yard requirement"), which has been added to the Bureau of Zoning Adjustment's May 8 agenda. This is slated to be a 146,000-sq-ft, 12-story project with ground-floor retail, and I've heard tell that they're planning a mid-2007 start date. It will be on the land between the Navy Yard Metro station entrance at New Jersey and M and St. Matthew's Baptist Church at L Street (St. Matthew's is not being demolished)--and no, it won't be built up on the grassy hill, they'll dig down to street level! This will make the third project underway on what is known as Square 743N, along with the 100 M Street office building and the Onyx on First residential tower on the other side of the block, along 1st Street.


                  © Copyright 2015 JD.