|
| ||||||||||||||||||||





The news of the two freeway spans of the 11th Street Bridges opening over the past few weeks is of course the most interesting part of the current state of the project's construction, but there's plenty of work still happening on the Near Southeast side of the Anacostia River, from the new "11th Street Local" bridge that will open this summer (seen at right) to various other new ramps and flyovers.
icon.)|
Comments (0)
More posts:
11th Street Bridges, photos
|
Back in February, the National Community Church applied for a raze permit for the Miles Glass site on the southwest corner of 8th and Virginia that it acquired along with a number of adjoining lots on Square 906 in 2010 and 2011. However, perhaps something was not quite right, because two new raze permit applications for 733 Virginia are now in the city's database, along with a separate new one for the car garage next door at 701 Virginia, the lot that finalized NCC's footprint.|
Comments (0)
|


























