Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: zoning
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


302 Blog Posts Since 2003
Go to Page: 1 | ... 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 ... 31
Search JDLand Blog Posts by Date or Category

ANC 6D has posted the agenda for its November meeting, at 7 pm on Monday Nov. 14., at 65 I Street SW. Agenda items include votes on Capper/Carrollsburg and Florida Rock PUDs, plus an update by the DC Sports and Entertainment Commission on baseball stadium zoning and construction issues.
 

For those of you who just can't get enough of zoning regulations, here's the final rulemaking and zoning order published in the Nov. 4 DC Register that amended the Capitol Gateway Overlay District regulations to include specifications for the ballpark. (Still waiting for Chapter 16/Capitol Gateway to reappear in the online DC Municipal Regulations!) Note that the design of the ballpark itself will still have to go through zoning hearings; nothing's appeared on the Zoning Commission schedule yet, but there's been hints of a January 2006 hearing date--I imagine that any delay past January on the zoning process would possibly start to impact the start of construction. Tick, tick, tick...!

More posts: Nationals Park, zoning
 

New page alert! I've added a page on the New Capper Community Center that will be built at 5th and K Streets, with some great renderings of the design of the new building (thanks go to architects Torti Gallas CHK for passing them along). The 28,500 sq ft facility will include daycare for 66 children, a rec center, a computer lab, a gym, a game room, and meeting/classrooms. This building is included in the vote on Capper/Carrollsburg planned by ANC 6D on Nov. 14 as well as the zoning hearing on Dec. 19.

More posts: ANC News, Capper, Community Center, zoning
 

I've made some major changes to my Florida Rock page, with much more detailed information about this planned 5.8-acre mixed-use project along the Anacostia River. Also included are some fabulous renderings of what the development will look like. Many thanks go to Davis Buckley Architects for providing me with the information and images. ANC 6D will be voting on the project at its November 14 meeting, and the second-stage PUD will be before the DC Zoning Commission on Dec. 8.
More posts: ANC News, Florida Rock, zoning
 

News from Zoning Commission land: at Monday's meeting, the text amendment to the Capitol Gateway Overlay about the stadium was finally approved. As soon as it gets posted in the DC Municipal Regulations, I'll post it here, although in the meantime you can read the text of the amendment from the July 29 DC Register. In other DCOZ news, there will be a hearing on Dec. 19 on Capper/Carrollsburg, to consider Phase I Final Approval and modifications to the consolidated and prelimary PUD. Phase I final approval references the land between 3rd and 4th and K and M Streets, where they are proposing to build 91 3- to 4-story residential units (note that the existing private homes in these blocks will not be demolished); this application also addresses the plans to build a new community center on 5th Street between K and L Streets. At the ANC 6D meeting on Oct. 17, it was indicated that the breakdown of the 91 units would be: 51 units would be 3-4 bedroom townhouses sold at market rate or moderate (80%-120% median income), 11 would be section 8 ownership units, and 29 would be public housing rental units. These units are in addition to the ones already in the pipeline for the blocks between 4th and 5th and Virginia and M--there will be a total of 208 market-rate townhouse units in these first two phases. The community center will include a daycare facility for 66 children, a rec center, a computer lab, a gym, a game room, and meeting/classrooms. AND 6D will be voting on this at their Nov. 14 meeting.

 

The DC Zoning Commission will be taking up the stadium text amendment to the Capitol Gateway Overlay District at tonight's meeting. This should be when they vote for final approval--although with the discussions these days about building heights near the stadium, I wonder if there will be some revisions in the works.

 

Today's DC Register has published an ever-so-slightly corrected version of the Capper/Carrollsburg first-stage PUD approval from 2004. Since the second-stage PUD should be coming before the zoning board in the near future (and is being discussed at the ANC 6D meeting on Monday 10/17), perhaps printing this is one of those arcane zoning rules I'm unaware of. Anyway, anyone interested in the plans for the Capper/Carrollsburg site should take the time to plow through these 40 pages.
More posts: ANC News, Capper, Capper Senior Apt Bldgs, zoning
 

Some Capper/Carrollsburg items: I hear tell that the construction contract for Capper Seniors #2 will be awarded soon (once the money aspect of the project gets settled, also "soon"). Also, word is that the Capper Community Center is to be demolished, Any Minute Now (we have a lot of those type of items, don't we?). In zoning news, the October Voice of the Hill gives details on the Sept. 15 zoning commission Capper / Carrollsburg agenda items--in addition to a second-stage approval being sought for a three-acre section of the project (presumably the "ribbon" between 5th, 4th, I, and M, which was demolished nearly a year ago), the developers are submitting a new application with modifications to several aspects of the original plans: they are seeking to increase the residential density to 2.34 from 2.21, and at the same time are proposing to reduce the parking spaces per unit to 1.38 from 2.1--these changes are the result of efforts to preserve some of the existing private houses that had been slated for redevelopment, according to a DC Office of Planning staffer. No date is yet announced for the public hearing on this.
More posts: 400m, Capper, Capper Senior Apt Bldgs, zoning
 

I've been away for more than a week, so I apologize if my news items have been slow--I'm still catching up on some things, hope to get back up to speed soon. In the meantime, I'll pass along that the DC Zoning Commission approved the Capper Seniors #2 building, approved for setdown the Capper/Carrollsburg 2nd stage PUD (which I believe means that basically they've agreed that they should have a hearing at a later date), and deferred the final vote on the stadium text amendment to the Capitol Gateway overlay, presumably until their October meeting. I'd be able to give you more details on all this, but I mistakenly believed the DCOZ web site when it said that Zoning Commission meetings are streamed live, and, well, this one most assuredly wasn't. Waaah!

 

The DC Office of Zoning has posted its agenda for the Sept. 15 meeting, and it includes the stadium text amendment for the Capitol Gateway overlay, as I expected. But they're taking up other Near Southeast items as well, both having to do with Capper/Carrollsburg. I'm not 100% versed in zoning minutiae (I might have made it to the 30% mark by now), so I'll just parrot what the site says, that the Capper/Carrollsburg 2nd Stage Planned Unit Development (PUD) and Modification is on the agenda. I believe that a second-stage PUD means a specific, fully engineered, plan for the site is being submitted for approval. So I hope that's something we can get a look at pretty soon. I would also think that this submittal means that the project may be kicking into a higher gear soon, as also evidenced by 15 building permit requests submitted at the end of August for addresses within the Capper/Carrollsburg boundaries.

There's also an additional agenda item for "Capper/Carrollsburg Venture LLC -- Senior Building," which I believe is a revision of the design of Capper Seniors #2, because the design submitted in 2003 included a blank wall along M Street, which is a zoning no-no in this area. The need for this vote was discussed at the Jan. 12, 2004 meeting, and is probably why the project's building permit application has the zoning section marked "Hold for Correction." (Yes, my head hurts, too.)

Speaking of second-stage PUDs, while wandering around on the web trying to educate myself on this topic, I found this 1999 National Capital Planning Commission document, showing the detailed plans for Florida Rock. However, that was then and this is now, and in December the Zoning Commission will be again taking up Florida Rock's second-stage PUD. So we'll have to wait and see what changes have been brought by six years (and a baseball stadium next door).

 
302 Posts:
Go to Page: 1 | ... 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 ... 31
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.