Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: zoning
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


302 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 31
Search JDLand Blog Posts by Date or Category

Last week the Zoning Commission heard Forest City's request for more height (and thereby additional density) in what is being called "Yards West," specifically four sites along N Street between 1st and New Jersey.
The early questions from the commission centered mainly around Peter May's contention that granting this density--which the applicants refer to as an additional 1.0 FAR but which May was happy to always refer to as "264,000 square feet"--was akin to "incentivizing something that's going to get built anyway." May expressed that the additional height and additional density were "perfectly appropriate" but that he was "not seeing the greater good that comes out of this," i.e., what Forest City would be providing in return.
Initially May zeroed in on proposed language he felt was too weak, that the eventual review of any building proposed along the Yards West M Street frontage would ensure that its design and site plan would "facilitate the provision of a public entrance to the Navv Yard Metrorail Station" on the southwest corner of New Jersey and M. (He also mentioned as an aside concerns he said he had heard recently that the explosion in residential development in the neighborhood instead of office projects was restricting the amount of available evening and weekend garage parking for stadium events.)
But then ANC 6D chair Roger Moffatt testified, noting that while the ANC voted 6-0 to support Forest City's request, it did so while strongly encouraging the Zoning Commission "to require units have more than two bedrooms as a condition of this added height and density." He continued: "ANC 6D supports growing DC into a larger population, but we don't want to exclude families who have children from being able to live in our section of the District. We believe this is an issue whose time has come and we hope that Zoning will take a step in the right direction here tonight."
A light bulb then seemed to go on, with each commissioner supporting May's request that Forest City work with the Office of Planning and the Office of the Attorney General to come up with stronger language not only on the Metro issue but on a "greater mix." Marcie Cohen spoke of families being pushed out of the city, and that Forest City needs to offer "compelling evidence" that there is no market and will be no market for units with more than two bedrooms. Michael Turnbull discussed how if a family has a boy and a girl "you are looking at a three-bedroom unit to make things work" and that "two children is not unreasonable for a lot of families."
While agreeing with the desire to have the language of the proposed text amendments looked at, commissioner Robert Miller did say that the board shouldn't treat lightly that granting the additional density would result in an additional 350 residential units to the area beyond what's already allowed, 70 of which would be affordable housing units, which is "something we need."
Finally, chair Anthony Hood admitted that the commission hasn't concentrated on the issue of units with more than two bedrooms ("I don't call it derelict because I'd call myself derelict"), and that it is something that the board needs to "start looking at this in other projects across the city." However, he seemed a bit skeptical that anything could really come of taking the extra time for the Office of Planning to work on the language in this particular case to achieve that end: "Let's see what happens. Make me wrong."
This case is scheduled to be back in front of the commission in late November.
Comments (0)
More posts: Development News, Parcel A/Yards, zoning
 

Materials filed with the Zoning Commission earlier this month are giving a first glimpse at JBG's plans for 1244 South Capitol Street, on the northeast corner of South Capitol and N, just across from Nats Park's Parking Lot C.
It will be a residential building with 290ish units and about 26,000 square feet of retail, and the renderings indicate that the design by architect Eric Colbert and Hariri Pontarini isn't a "typical" Washington DC box-like building. Images show the building's west side, facing South Capitol Street, with only six floors of height at its middle, allowing the interior courtyard to be open to South Capitol from the 6th floor on up, breaking up the pure U-shape that is so often employed 'round these parts. A few more views (click to enlarge):
At left is a stylized version of the view that you'd see standing at Van Street one block west of the Center Field Gate, looking toward the big self-storage building and points to the northwest. At right is a closer view of the South Capitol Street facade and the courtyard, upper floors, and roof. (Note that in these three drawings you can see hints of Akridge's proposed Half Street residential building on the perimeter, though that's not appearing to be getting underway anytime soon.)
The 26,000 square feet of retail will of course warm the hearts of stadium-goers, and the filing indicates that the retail spaces will wrap around on three sides of the building. This rendering depicting the corner of South Capitol and N (with a certain dome in the distance) shows two stories of retail along both streets, with more ground-floor spaces designed along Van Street.
There would be 176 parking spaces on three levels below ground for vehicles and and 100 spaces for bikes. Residential units would range from studios to 2 BR/den. The courtyard and 6th-floor open space would have plantings and seating areas, while the roof would have a pool, lounge areas, and a bocce court (!). These plans also show "rooftop dining" at the far northwestern corner. (And will residents be able to sneak a peek at games while hanging out poolside? The image up top seems to show an angle for that to work, but it's hard to tell if the entire field would be visible.)
The design will get its Capitol Gateway Overlay District Review hearing on November 13, and it will be interesting to see how the Zoning Commission members react to the design.
Comments (5)
More posts: 1221 Van, Development News, zoning
 

On Monday night, the Zoning Commission voted to approve the design for the proposed Homewood Suites hotel on the northeast corner of Half and M, just across from the Navy Yard-Ballpark Metro station.
According to the Washington Business Journal, "Commissioners were not thrilled with the hotel design, specifically the rooftop trellis, but it wasn't a 'show stopper' for any member of the panel."
The commission also okayed the 175-room hotel's plan to only have 40 parking spaces (instead of the mandated 53), but to get that approval, developer Englewood LLC agreed to various transit-related requirements, including offering full-day Circulator passes to guests, designating a "transportation coordinator," partnering with Bikeshare, and installing an information screen in the lobby showing transit status.
Earlier reporting said that it was hoped that construction could begin later this year or early in 2015, though building permits still need to be secured.
While the Courtyard by Marriott at New Jersey and L has had the Near Southeast hotel market to itself since 2006, this Homewood Suites is not the only new entrant--a168-room Hampton Inn at 1st and N is already under construction, and an additional 170-room hotel is expected in that same block once "Ballpark Square" gets underway.
Comments (12)
More posts: Homewood Suites, Development News, zoning
 

With its Capitol Gateway Overlay Review hearing now less than two weeks away, the developers of the Homewood Suites hotel planned at 50 M Street SE have submitted to the Zoning Commission new drawings of the building. Click to embiggen.
The angles are from Half Street (left) and Cushing Street (right). The site is directly across M from the west entrance to the Navy Yard-Ballpark Metro station.
The building is planned to be an 11-story, 140,000-sq-ft structure with one level of underground parking with a requested 40 vehicle parking spaces instead of the mandated 53, and 12 spaces for bicycles. I wrote more about the plans a few weeks back, or you can check out the project page for more details and photos of the current location.
 

Last week developers submitted to the Zoning Commission plans and drawings for the Homewood Suites Hotel being developed at 50 M Street, on the northeast corner of Half and M SE, one block north of Nationals Park.
This is part of the Capitol Gateway Overlay Review that projects in many parts of the neighborhood are required to go through, to make sure that new buildings meet the many goals for design that were set when the area was just a gleam in the Office of Planning's eye.
The filing mentions the basics: the hotel will be 11 stories/40,000 square feet, of which about 4,800 square feet will be reserved for ground-floor retail. There will be a pool and fitness center, a rooftop terrace, and a green roof. And if the current design becomes the final design, the project would most likely meet LEED Silver requirements.
Also included were some early elevations, such as the one at right and a few others that I snagged and have put on a newly thrown-together 50 M Street project page. (And yes, it's in the new JDLand design format--I can't be bothered to build a separate one in the old layout. If it's not displaying right for you, drop me a line and tell me what browser you're using.)
The only special exception to the CG Overlay being sought is that the developers are asking to include only 40 parking spaces, when 53 would be the normal base requirement, because of the hotel's "urban location" directly across from the west entrance of the Navy Yard-Ballpark Metro station. Judging from the drawings, the underground parking entrance will be on Cushing Street; and the developers stated in the filings that they would be building a new sidewalk along the property's frontage on that street.
ANC 6D will be reviewing the project at its next meeting, on Monday, May 12 at 7 pm at 200 I St. SE., in advance of the Zoning Commission's as-yet unscheduled hearing.
 

The title of this post says it all (in other words, I am not in full blogging mode this week).
* PUMP IT UP: City Paper reports that DC Water is soliciting bids for the design of a new headquarters, which would move from Blue Plains to a new building atop the existing O Street Pumping Station. (NOT the beautiful Main Pumping Station just to the north!)
And, if one looks at the renderings that Forest City released during its quest for zoning approval to develop three blocks around the station, you can deduce that this idea did not crop up in the last few days. The rendering above shows the O Street station in the right foreground, and you can see how it does look similar to the description reported by City Paper: "[It] will have five stories of offices perched above the pumping station. The offices will be supported by columns; there may or may not be a small gap between them and the pumping station."
(Note that this is a separate issue from the stalled drive to move some of DC Water's operations before Forest City can start work on the proposed movie theater there.)
* THUMBS UP: The Zoning Commission has issued the final orders to allow veterinary hospitals in the Southeast Federal Center Overlay and for the Trapeze School to move to New Jersey and Tingey.
* BOTTOMS UP (OR NOT): An application for a Class C liquor license is now in the pipeline for the The Big Stick, the new restaurant coming later this year to 20 M Street, The application describes the venture thusly: "A sports bar featuring an alpine lodge theme and décor serving casual foods such as bratwursts, sausages and kielbasas, salads, sandwiches, wraps and crispy oven-baked macaroni and cheese. Occasional DJ. No nude performances."
That's all that's up with me. What's up with you?
 

Forest City Washington, desiring to begin development on the western portion of the Yards, is requesting a change to the Southeast Federal Center Overlay that would "align the height and density of any residential development in the Yards West with similar residential density to the west in the CG/CR Overlay and the south in the DC Water Sites PUD."
(And yes, this "Yards West" thing is new, but it does make some sense, given how the properties along 1st Street are mostly separated from the heart of the Yards between 3rd and 4th.)
As shown on the graphic Forest City provided to the Zoning Commission, the four parcels along N Street just east of 1st dubbed F, G, H, and I currently have a maximum allowed height of 110 feet, while to the north, south, and west there's a 130-foot maximum. (There's also a density difference that caps Yards residential development at 6.0 FAR versus 7.0-8.2 in the Capitol Gateway (CG) Overlay.)
This means that the SEFC Overlay permits less height and density than on the surrounding properties because, Forest City says, "no one fully anticipated the success of the tremendous public and private investment that is transforming the area."
Further proposed text amendments would "require Zoning Commission design review for any property utilizing bonus height and density for residential use" and would "authorize deviations from the ground-floor preferred use requirements, only after approval from the Zoning Commission."
During the zoning hearings a few weeks back to allow some changes to the NGA building site (known as Parcels A, F, and G, but which for now I just call Parcel A because I'm lazy), it was mentioned that Forest City was in the process of hiring an architect to design a residential building on Parcel H, which is on the southeast corner of 1st and N, with hopes of beginning development in 2015. Though I'm guessing they'll want to find out whether they can build to 130 feet instead of 110 before finalizing that design.
More as it develops.
 

Goodness, these piled up all of a sudden. Let's start with the food and drink-related items:
* Strolling by the long-in-the-works Willie's Brew and 'Que at the Boilermaker Shops over the weekend, I saw that flat screen TVs are now up on the walls. I imagine they are dreaming of being open by Opening Day.
* Ice Cream Jubilee at the Lumber Shed now has its tenant layout permit approved, so work should be underway there.
* PoPville reports that Hill Country's attempts to open a temporary location on Tingey Plaza behind USDOT haven't worked out.
And, on the non-digestible front:
* SWill reports on ANC 6D's newest commissioner, Stacy Cloyd, who is filling the 6D02 vacancy left by Ed Kaminski. A resident of Southwest, Stacy will also be representing areas east of South Capitol, including Velocity, Capitol Hill Tower, and Nats Park (and River Parc, before long).
* DDOT has released its draft Request for Proposals to the short-list finalists for the first two phases of the South Capitol Street project, which include building the new bridge and also rebuilding the interchange of I-295 and the Suitland Parkway.
* The new owners of the lot at South Capitol and N just north of Nats Park have withdrawn the pending zoning case for the site, which predated the property's recent sale. The previous ownership group had long been working on an office project, but in its withdrawal letter 1244 South Capitol Residential LLC says it is "studying development of the property for residential uses," and that it plans "to submit a new application for Capitol Gateway review in the near future."
* Outside the boundaries, but Near Southeast residents may still be interested in the looming start of the huge Wharf project on the Southwest Waterfront, with a ceremonial groundbreaking scheduled for March 19. Here's the Post's story on the new development, along with a photo gallery (which might seem to have a somewhat familiar style) of the current waterfront, before it's gone.
 

Now that I've come out of my snow bunker (being a weather geek is a terrible disease), I'll pass along these notes from the past week or so in Zoning Land:
* VET: The commission on Feb. 6 approved 5-0-0 Forest City's request for a wording change to allow a veterinary hospital to operate in the Southeast Federal Center Overlay area (basically, the Yards).
As I wrote a week or so ago, a vet is a potential tenant in Twelve12's retail space on Tingey Street, but before a lease can be signed, "veterinary boarding hospital and veterinary hospital uses" needed to be added to the SFC overlay's allowed uses, subject to a number of conditions (no more than 50 percent of the tenant space can be for boarding, that any animal legally sold in the District can be boarded, incidental boarding of animals for convalesence is allowed, order and waste handling requirements, and that grooming and supplies can only be "accessory" uses). There was some back-and-forth about the word "incidental," and it was agreed that that wording be better phrased before the final vote.
Forest City does not announce tenants until a lease is executed, so the name of the potential vet has not been released.
* CAPPER: On Feb. 10, the commission voted to "set down" for a full hearing the Housing Authority's request to modify the Capper PUD to allow 30 of the affordable housing units planned for squares 739, 767 and 768 to be transferred outside the Capper boundaries to the block where the Park Chelsea is currently under construction. (See the this map culled from the Office of Planning Report to help you visualize.)
The planning folks have a number of issues they want DCHA to address before the hearing on this modification, but not among them is the biggest issue that ANC 6D has with Square 767: that the Housing Authority is thinking about a plan that would change the original plans for a single 147-unit mixed-income building to two buildings, one a market rate-only condo building and the other an affordable housing-only building. (This plan is not mentioned in the housing authority's filings with the zoning commission.)
During the discussion, commission chair Anthony Hood noted that ANC 6D is "one of the ANCs that this commission knows is very engaged," which was in reference to the strongly worded letter the commission received with 6D's concerns that they and the community still need to be "appropriately briefed" about DCHA's plans, and that the commission be able to "fully vet our concerns with them regarding the request for modification." Hood also said, "Let's make sure the next vote we see shows that everyone is working together."
Concurrently, the commission's vote also deferred action on DCHA's parallel request for a five-year extension to the PUD covering these same three squares, saying that the extension request decision hinges on the modification case's decision. The Office of Planning is recommending just a two-year extension, and zoning commissioner Marcie Cohen said that DCHA needs to provide much more detailed information on the steps taken up to this point to secure financing, since it is her opinion that the initial filing doesn't seem show a "compelling need" for an exemption.
The hearing date isn't yet set, and DCHA will have to go to ANC 6D (and probably 6B as well) in order to request support before its zoning commission appearance. The Housing Authority and 6D have had a pretty contentious relationship over the years in regards to the Capper redevelopment, and it's unlikely that the deliberations over this zoning request will change that.
 

During Monday night's Zoning Commission hearing on allowing the move of the trapeze school from "Parcel O" at 4th and Tingey in the Yards to another space at New Jersey Avenue, Forest City's Ramsey Meiser revealed that the company is planning to sell a portion of Parcel O to allow for the development of a condo project there.
Meiser explained that while Forest City doesn't do condo development, "we want to have for-sale product at the Yards," hence the potential deal. The zoning filings say that "Parcel O will be developed in 2014/2015 and construction on Parcel O is expected to be completed by 2016/2017."
I've asked for further detail on this, which I may or may not get anytime soon, and I will update when I receive more.
Other tidbits that came out of the hearing:
* Forest City is in the process of hiring an architect to design a residential building for Parcel H, which is the western half of the parking lot on the southeast corner of 1st and N, directly across from Nationals Park and north of DC Water. There appears to be a desire to develop that site within the next couple of years.
* The company expects the demolition of the NGA building at 1st and M to take approximately six months, and that the reconfiguration of the block to include the trapeze school, a new park on the north end, and a slightly shrunken parking lot would be completed by the end of 2014.
* The new park, which with the rest of the block would be a temporary use until office buildings are constructed, has enough open green space that Forest City expects to work with the BID to activate it for some sorts of smaller sports activities (bocce and kickball yes, softball probably not).
Oh, and the commission voted 5-0 to approve the special exceptions to allow trapeze school and parking lot on the south end of the 1st and M block, on the sites technically known as Parcels F and G. (The park would be on Parcel A.) There was some back-and-forth about the need for trees on the site--they weren't included in the plans because Forest City expects buildings to eventually replace the temporary uses, but Forest City has agreed to work with DDOT and the Office of Planning on the issue, and the zoning commissioners did not feel it warranted delaying their vote.
UPDATE: In my haste to get this posted, I should have mentioned that the original Yards plans did include a condo project--a plan to have PN Hoffman convert Building 202, the red brick building at 5th and M east of what's now Twelve12. But that project has seemed to stall.
 
302 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 31
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.