Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: zoning
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


302 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 31
Search JDLand Blog Posts by Date or Category

The agenda is now posted for Monday's ANC 6D meeting, and it does have a few Near Southeast-related items on it. So it follows logically that I'm not going to be able to be there.
Items include: A report from the housing authority on a request for a zoning time extension for the planned (and long-delayed) community center at Fifth and K streets, SE; an update on the upcoming second phase of Capitol Quarter (which EYA tells me resulted in 11 reservations in the first 15 days); an update on the stadium Traffic Operations and Parking Plan, presumably coming out of the two recent public meetings; and reports/possible votes on Justin's Cafe's proposed sidewalk cafe and the proposed "Harry's" liquor store at New Jersey and I, both of which you can get more detail on from my report on last week's ABC subcommittee meeting.
The meeting is at 7 pm at St. Augustine's church at Sixth and M streets, SW--they're trying to get moved to their space in the new Waterfront buildings, but it still hasn't happened.
I'm going to try to find out more about the community center request, though I imagine there isn't much more to it other than DCHA says it doesn't still have the money to build it yet and so can't meet the deadline that was set in the zoning PUD (planned unit development) for Capper. The time frame for the community center has already been extended once, and in fact DCHA told the Zoning Commission last year that they fully expected that new deadline of filing building permits by Jan. 1, 2011, would be too short and that they'd be back to request another extension. Which appears to be what's transpiring.
 

I've been chroncling over the past few months the Marine Corps' search for a spot for a new barracks, which has focused on a number of sites in Near Southeast, including the block bounded by Fifth, Seventh, L and M just south of their newest barracks that used to be home to the old Capper Seniors apartment building. It's been clear in public meetings and various other rumblings that both city planning officials and the DC Housing Authority are very much against the Marines using this site, with plans having been in place for a number of years for this now-empty/parking-lot block to become home to both a 600,000-square-foot office building and a 189-unit mixed-income apartment building (shown above) as part of the Capper/Carrollsburg redevelopment.
Clearly feeling that the Marines haven't given up on the site as an option despite these plans, DCHA has now sent the Marines a letter officially requesting that the Corps "not continue to propose redevelopment options on the DCHA-owned Square 882 as a future site for its facility needs." The letter explains that DCHA has already secured funds to improve the infrastructure around the square, has spent "substantial predevelopment funds" on design and engineering drawings, and is anticipating beginning work on the residential portion of the site in October. (There's currently no timetable for the office portion.) Further, DCHA says it "recently received an invitation from HUD to submit an application for a FHA loan guarantee to support the planned residential construction on the site," and that this construction is expected to start "this winter."
Nothing in the letter is necessarily a surprise--I've written fairly extensively about DCHA's plans and about the zoning travails they went through before getting a second-stage PUD approval for Square 882 last year, which even included many discussions and agreements with both the Marines and the Navy about security requirements for the new buildings on this block. But clearly DCHA is hoping to be completely removed from the Marines' list of potential sites in the same way that the DC Public Schools (and parents) got Tyler Elementary removed from consideration. But it's also clear from the public workshops that the Marines very much like what Square 882 has to offer them in terms of space and proximity to the other USMC operations in the area.
The Marines are hoping to make a decision on a site by September. You can see all the sites under consideration and the various options on the "Community Integrated Master Plan" web site.
 

Thanks to one of the National Capital Planning Commission's fabulous documents, we're starting to get first hints of plans by the Cohen Companies for what they are describing as a three-building, 815,000-square-foot office, hotel, retail project on the very eastern end of M Street, nestled between Boathouse Row and the CSX tracks east of Maritime Plaza. It's so early in the process that it's not even on Cohen's New Projects page, but City Paper's Housing Complex blog has learned that the company will be putting together a planned unit development application to the Zoning Commission "over the next six to nine months." (No financing is lined up, though, so don't look for digging to start anytime soon.) See the NCPC document for some early drawings and some basic information on how they envision the offerings of the three buildings.
(Cohen Companies, by the way, is the developer of Velocity.)
Back in 2003-ish, there were plans for this site to be a townhouse development (see page 15), but those never got off the ground partly because of zoning issues, which then begat an attempted rezoning of the area in 2004 that failed. But rezoning of the site will have to be back in the forefront when this project's PUD application hits the zoning committee, since the space is still zoned "M" (industrial).
The project is in front of NCPC because of Cohen's request to close "paper street" segments of Virginia Avenue, M, and 14th streets. This is a part of a settlement between 1333 M Street, SE, LLC and the city from a lawsuit over waterfront development in South*west*, where the Cohen Companies are agreeing to release their claims in exchange for three small pieces of government land at 1333 M SE as well as the city's support in requesting the street closures. (The street closures themselves have been approved by the city council as bill B18-0572, and are expected to become law later this month.)
The NCPC is objecting to the street closures; and thankfully Greater Greater Washington has been writing in detail on the case, so I'm just going to throw it over to them for all the nitty gritty, because it's way out of my league. (Read also this GGW entry about connecting this area to the neighborhoods to its north if/when the remnants of the freeway to Barney Circle are removed.) But, again, the NCPC staff recommendation report is also a great read for not only the NCPC's concerns but also for the history of the area under review and other details. The NCPC board is meeting this afternoon, and we'll see what comes out of the session (I assume GGW will be hot on the trail).
If you've never ventured down that way, my East M page has a few not-particularly-current photos of the location (I don't get there very often myself), along with more images of Boathouse Row. When the project begins to wind its way through the zoning process, I'll get more on the ball. The city's 2009 Boathouse Row Planning Study is also a good spot to learn more about the area.
UPDATE: Thanks to commenter Evan, I'm reminded that I should have included the additional information that, because this is part of the old Washington Gas (and I think Steuart Petroleum) site, there are some serious remediation issues to be addressed, which are mentioned both by Ron Cohen on page 25 of this 2003 ZC transcript and on page 19 of this 2004 ZC transcript (saying that the contaminated soil is 11 feet down). Remediation is also mentioned in the 2009 Boathouse Row Planning Study and in this EPA document (under "Washington Gas and Light"). Oh, and the EPA's 1999 record of decision on what cleanup remedies would be needed. It should be noted that both Maritime Plaza buildings were completed after this document. (This is all before my time, so I'm researching on the fly.)
UPDATE II: Here's a WBJ article (subscribers only for 7 days) on the NCPC angle; it also reminds that, outside the monumental core of the city, NCPC's rulings are purely advisory.
 

This morning Mayor Fenty officially opened Diamond Teague Park, cutting the ribbon alongside the parents of the park's namesake, the Earth Conservation Corps volunteer who was murdered in October 2003. The piers at the park, located just across the street from the baseball stadium, have been operating sporadically since last September, and now host both a water taxi service to and from Alexandria for baseball games and a river cruise company that began service earlier this month. Another outfit is hoping to launch a separate water taxi service this summer.
The park includes two piers, a 250-foot commercial pier and a 200-foot pier for non-motorized vessels, like kayaks and canoes, as well as sustainable elements like floating wetlands and shoreline plantings. A portion of the $8 million cost of the park ($800,000) was paid by Florida Rock next door as part of its zoning agreements for its new development, and funding has also come from the USDOT HQ Payment-in-Lieu-of-Taxes (PILOT) fund. (Someday the area next to Teague on the Florida Rock site will be a large public plaza that will in effect expand the size of the park considerably. And eventually there is supposed to be a floating bridge connecting Teague's boardwalk with the Park at the Yards, though there's no timeline on that.)
Alas, I was unable to be at the event today, so no photos. But here's the press release from the mayor's office. And you can check out my Teague page to see before-and-after photos, like the ones above.
Comments (0)
More posts: Teague Park, zoning
 

The long-vacant apartment building on the northwest corner of Third and L that was resurrected earlier this year as "Casa degli Angeli," a nautical-themed short-term rental operation, lost its bid last week to become a bed and breakfast, when the Board of Zoning Adjustment was forced to deny the operator's request for a variance. As spelled out in the Office of Planning's report on the case, the Casa would not be meeting the standards for an "accessory use" because the building's owner would not be living there, plus the plan to rent out seven bedrooms (making it more of an inn than a B&B), would run counter to the intent of the zoning regulations that allow only limited non-residential uses in residential zones.
The four BZA board members were apologetic, clearly feeling that the idea to run the building as a B&B was at heart a good one, but that the city's regulations clearly precluded them from approving the request. (Here's the video of the hearing; I used the nifty "TinyClip" option to link to just this portion of what was otherwise a very long hearing.)
Casa's propietor, "Captain Apollo," tells me that he intends to continue to run the building as a short-term 30-day rental building, and will still be attempting to turn it into a B&B at some point down the road.
Comments (0)
More posts: Casa Degli Angeli, meetings, zoning
 

Catching up from last week.... On Monday (Nov. 9), the Zoning Commission voted 5-0 to approve Florida Rock Properties' request for a two-year time extension on the 2008 zoning order for its RiverFront project at First and Potomac, across from Nationals Park. Citing the current Economic Difficulties, the developers requested the extension so that their deadline for securing building permits for the project's first phase (an office building on the east side of the site, near Diamond Teague Park) is now mid-2012, with a construction start date deadline of mid-2013. My RiverFront page gives all sorts of additional details on the project, if you need a refresher.
The Office of Planning supported the extension request (you can read their report for details), and zoning commissioners Hood and Turnbull both called the project a "good effort," mentioning how much work by the developers, the architect (Davis Buckley) and the commission had gone into the zoning order. (Those of you who haven't been around quite so long may not be aware that Florida Rock first began its long and winding road through the DC zoning process in the late 1990s.) This extension was supported by ANC 6D at its October meeting.
If you want to see the zoning hearing, you can go to the Office of Zoning's wonderful fabulous incredible Video on Demand section, where not only can you pick the meeting you wish to see but can then use their index to skip to the portion of the meeting you're interested in. I may never watch an entire public meeting live ever again!
Comments (0)
More posts: Florida Rock, meetings, zoning
 

While my dinner is in the oven, here's the speediest of reports from tonight's ANC 6D meeting:
* The ANC voted 7-0 on a resolution supporting the city council's proposed marriage equality act.
* They voted 5-2 to support Florida Rock Properties' pending request in front of the Zoning Commission to extend the deadline for the first building permit application at RiverFront two years, to June, 2012, which would push the deadline for the start of first-phase construction to 2013. (Read this entry for more details, and see my project page for specifics on the development itself.) It's expected that this will be taken up at the November 9th ZC public meeting.
David Briggs of Holland and Knight, representing FRP, said that while the developer has worked "assiduously and tenaciously" since last year to find either equity or construction funding, the notion of starting the first-phase office building within the current zoning timeline is "just not viable." FRP does say, though, that they will be continuing to search for funding if they receive the extension. In the meantime, FRP made its required $800,000 payment to the city last fall to help defray the costs of Diamond Teague Park next door; I asked if there were any possibility that perhaps the land on the very east end of the Florida Rock site, which will eventually be a public plaza that abuts Teague Park, might be cleared and opened as public space before the construction begins on the office building--they're "looking at options."
* The commissioners also voted 7-0 to support the zoning special exception request by the operator of the six-unit "Casa degli Angeli" at Third and L, which is currently operating as a month-to-month room rental and which is looking for a zoning change to become a full-fledged bed and breakfast. The Board of Zoning Adjustment hearing is scheduled for Nov. 17.
 

The agenda for Monday's ANC 6D meeting has been posted, with two Near Southeast items listed. The first is that the developers of the RiverFront (aka Florida Rock) site between the Anacostia and the ballpark are apparently filing for a time extension on their zoning PUD ("planned unit development," for those of you mercifully unaware). When the zoning approval for this project finally came through in 2008 (after years of slogging through the process), the developers were given until May of 2010 to apply for building permits for the first phase of the project (an office building on the east end of the site, near Diamond Teague Park), with construction then required to start by May 2011. So, although it was recently reported that Florida Rock Properties is looking for an equity partner to help finance the development of the site, they clearly believe that it will be tough for them to meet the zoning order timeline.
Timeline extensions are increasingly common cases being heard by the Zoning Commission these days, as financing for commercial real estate development continues to be extremely difficult to procure; the Capper redevelopment received one earlier this year. I don't yet see a hearing date for FRP's extension request on the zoning calendar.
In other tidbits:
* Also on the 6D agenda is the "Casa degli Angeli" at Third and L, which has a Board of Zoning Adjustment hearing scheduled for Nov. 17. The six-unit building, which is currently operating as a month-to-month room rental, is looking for a zoning change to become a full-fledged bed and breakfast.
* The latest issue of Voice of the Hill has more detail on the CSX plans to expand the Virginia Avenue tunnel; you can read the documents that CSX submitted to the National Capital Regional Transportation Planning Board for some additional details. Quoting the Voice: "CSX spokesperson Bob Sullivan said the project would take between two-and-a-half and three years, while a District Department of Transportation Department official made a slightly lower estimate. 'We anticipate that there would be some traffic impacts during the course of this project, which is probably going to last a couple of years,' said agency spokesperson John Lisle.'" Neighbors in the area are concerned: ANC 6B will be getting a briefing about the plans at its Nov. 10 meeting.
* On Oct. 27, there's a public meeting about the CapitalSpace plan, "the first comprehensive analysis of Washington's parks and open space in almost 40 years," which is attempting to get the various federal and local agencies that run the many parks in the city more closely coordinated, along with other plans to improve the parks themselves. The meeting is at the MLK Library from 5:30 to 7:30 pm.
 

In a blissfully short 26-minute hearing, the city's Zoning Commission approved tonight the series of amendment requests to allow the Trapeze School New York to set up shop on Parcel O at the Yards, on the southeast corner of Fourth and Tingey.
The commissioners seemed satisfied with the information they had in the Office of Planning report and the submissions from Forest City and the Trapeze School, and asked few questions (Chairman Hood was clearly trying to move things along). This is a temporary approval, allowing the Trapeze School to be at the Yards for five years, or longer if a Special Exception is later granted. The text amendments also waved the on-site parking requirement for the school, with new commissioner Konrad Schlater saying he was "comfortable" with it because parking "is definitely overbuilt" in the area around the ballpark. ANC 6D had voted 7-0 in support of the case as well. It's now expected that the National Capital Planning Commission will address the Trapeze School at its Oct. 1 meeting.
No date for the opening of the school in its new home was mentioned, though it was explained that Forest City was trying to expedite the process since the school is having to vacate its home at the old convention center site. There will still be building permits to be filed for and approved before the tent can be lifted.
Toward the end of the hearing, Ramsey Meiser of Forest City gave a bit of an update on the other projects in the first phase of the Yards. Here's the latest:
* They are continuing to work with the city's Housing Finance Agency to get the money together to (re)start on the Foundry Lofts, with a hoped-for completion date of late 2010 or early 2011.
* The Boilermaker Shop could open in 2011; this dovetails with what a commenter in this thread reported hearing over the weekend, although earlier today Forest City would not officially confirm for me any scheduled start date for the project, only that some retail tenants have been signed, but that Forest City can't name them publicly just yet. (Maybe in October.)
* The first retail in the Park at the Yards (in the old Lumber Shed building) could open in 2012; the park itself is expected to open next summer.
* "Parcel D", on the southeast corner of Fourth and M, is the site of the expected Harris Teeter (though Meiser didn't name them, saying only "a grocery store," since neither Forest City nor Harris Teeter have confirmed this rumor yet), and is now apparently going to be a residential building instead of office, which had been hinted at recently. It's expected delivery date is currently 2013.
* The Factory 202 lofts building at Fifth and M is not expected before 2014.
And all that's just the first phase! Meiser also said that Parcel N, the site of a surface parking lot on the southwest corner of Fourth and Tingey, would probably be the first project of Phase 2. But no date on that yet.
If you want to watch the hearing, visit DCOZ's On Demand Video page.
 

A reminder that on Monday (Sept. 21) the Zoning Commission will be hearing a request from Forest City for a text amendment to the Southeast Federal Center Overlay that would "authorize a Trapeze School and Aerial Performing Arts Center in the SEFC/R-5-E Zone District at the Yards." This is the Trapeze School New York, which left Baltimore's Inner Harbor earlier this year and is currently flying through the air on the old DC Convention Center site at Ninth and H, NW. The school would take up residence on the lot on the southeast corner of Fourth and Tingey ("Parcel O"), which someday will be a residential building but is not expected to be developed anytime soon. It's also just north of the site of the Park at the Yards, which is scheduled to open next year.
Here's the report prepared by the Office of Planning in advance of Monday's hearing, in which they recommend approval of the four text amendments being sought. They're asking for the trapeze school to be allowed for five years (or longer, via a special expection), and to dispense with the off-street parking requirement, since there's already so much surface parking at the Yards. There's also some technical needs to actually create tax parcel lots on the site to allow for the issuance of building permits.
The hearing is at 6:30 pm at 441 4th St., NW (Suite 220 South), or you can watch the live feed or wait for the video on demand (it gives me a smile just to type that--I've waited for video on demand for zoning hearings for so long!)
 
302 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 31
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.