Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: zoning
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


302 Blog Posts Since 2003
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 31
Search JDLand Blog Posts by Date or Category

Tonight ANC 6D had a special "presentation" meeting, to lighten the load of next Monday's business meeting so that everyone could go home before 2 am. On the agenda were three items, all of which are JDLand perennials. I'll post on Tuesday about the Capper zoning stuff and the South Capitol Street EIS, which didn't really contain much that I haven't previously covered; the third item was the designs for the second phase of the waterfront park at the Yards.
The first phase, which is expected to begin construction in the next three months and be completed by mid-2010, is the basic layout of the park and the boardwalks. The second phase comprises 55,000 square feet of retail in the to-be-rehabbed Lumber Storage Shed and two new buildings, as well as a 60-foot-tall "visual marker" (seen at left) just to the southwest of the shed. (The third phase will be the piers and marina.) I was dreading coming home to describe these latest plans with no renderings to accompany my ramblings, but then I found the National Capital Planning Commission has done all my work for me, thanks to these phase 2 designs being in front of the commission at their meeting this Thursday (and for which the NCPC staff has recommended approval). You can see all of the drawings presented to the ANC in this NCPC document, along with a lot of description of the designs, but I'll hit some highlights.
The "light tower," designed by James Carpenter Design Associates, is made up of stainless steel prisms that reflect light during the day and will be subtly illuminated at night. The top is actually 70 feet from the top of the water, but 10 feet of that is the boardwalk; the structure itself is only 60 feet high.
The storage shed, as I've mentioned in the past, will lose its faaaahbulous salmon-colored corregated skin and will be enclosed with non-reflective glass. The other two buildings (currently given the wonderfully descriptive monikers of P2A and P2B) will also be mainly glass structures. There will be a restaurant court in front of the center building, overlooking the area of the park that steps down toward the waterfront. (A drawing of the three buildings' southern facades is here; a larger version of the rendering at right showing how the buildings are not at all dominant when viewed from the waterfront is here. See the NCPC document for additional views.)
The questions from the ANC commissioners included whether this public park financed by public dollars and owned by the city would be open to the public, whether there would be preferences for ANC 6D-based businesses for the retail spaces and the six kiosks planned near the light tower, and if there would be any city-controlled vending spaces in the park.
The designs will be presented to the Zoning Commission on March 2 (there are also some exceptions and/or variances being requested). The ANC will presumably be voting on whether or not to support the project at its Feb. 9 meeting.
 

Some little items to head into the weekend:
* The Capitol Riverfront BID is going with a Best of the 80s theme for its Riverfront Reel summer outdoor movie series, and has a survey up to determine the most popular flicks. (Though let me just say that the omission of Die Hard has me white with rage....)
* DDOT is holding an "Anacostia Waterfront Forum" on Feb. 17 at the MLK Library at 6:30 pm, "on the role that replacing the 11th Street Bridges will have in creating a more inclusive and sustainable Distrct."
* Also from the BID, news that the Earth Conservation Corps has scheduled a dedication ceremony for Diamond Teague Park on April 28. I've been told that if all goes "as planned," the construction of the in-water structures (the docks and the piers) should be completed by Opening Day, though the plantings and other work on the dry-land portion of the park would be completed by the beginning of July.
* Greater Greater Washington is not happy that the US DOT is having a "sale" on its parking spaces.
* City Paper's Housing Complex blog is bewildered about where this Capitol Quarter "neighborhood" might possibly be. (Teh Google probably could have answered that.)
* The US Department of Justice and some Shell Oil entities are nearing a $2.1 million settlement for damages and cleanup costs at the Southeast Federal Center (now the Yards) after what the feds allege was benzene, toluene, ethylbenzene and xylene contamination of soil and groundwater "from leaking underground storage tanks located at a former filling station adjacent to the contamination."
* I did attend last night's zoning hearing on Akridge's Half Street project, and will post a summary when I recover from the nearly four-hour session. But I did hear that the bus garage on the site will be demolished pretty soon, to make way for temporary parking. Both Akridge and Monument are talking with the Nationals about providing their spaces for gameday parking. (Monument has told me that their underground garage at 55 M--and the little addition to the south--will be complete by Opening Day.) That's a lot of spaces that weren't around last year....
* DCRA has restarted the Building Permits feed. And there was much rejoicing.
 

Thursday (Jan. 29) at 6:30 pm is the Zoning Commission Capitol Gateway Overlay Review for Akridge's planned 700,000-sq-ft mixed-use project along Half Street. You can read my summary of the project plans as presented to the ANC a few months back for details; the ANC voted to support this plan at their January meeting. (I still don't have any renderings--I hope to soon!)
There's also the Office of Planning's hearing report for the project, which was prepared a few weeks ago; it says that OP is "very supportive of the project" but was unable to make a recommendation at the time of the report because it required additional information. I believe there's been some back-and-forth between Akridge and the planning office since then, but details will have to come at the hearing. The OP report is a good offering if you want a pretty detailed analysis of how the project stands up against the CG Overlay requirements as well as explaining the various exceptions and variances being requested.
If you don't feel like schlepping down to the Zoning Commission offices at 441 4th St., NW at 6:30 pm (and there's no one who understands that more than me), you can watch the proceedings on live webcast (no archived offerings, though). I imagine I might send a Tweet or two, if there's something worthwhile.
Comments (0)
More posts: West Half St., Development News, meetings, zoning
 

With developers of three large projects needing to make presentations, ANC 6D has decided to have a separate presentation meeting on Feb. 2 in advance of its Feb. 9 monthly business meeting. And all three are Near Southeast spectaculars:
* The Housing Authority will be there to talk about the various modifications it's seeking to the Capper PUD, in advance of its March 19 Zoning Commission hearing;
* DDOT will be making a presentation on the final South Capitol Street Environmental Impact Statement (this includes the plans for the new Douglass Bridge), which I wrote about a few weeks back; and
* Forest City will be making a presentation about the park at the Yards (I believe these are the designs for Phase II, which include the various pavilions and the docks and marinas). The National Capital Planning Commission will be taking a look at Yards designs at their Feb. 5 meeting, and the Zoning Commission hearing on the park's second phase is scheduled for March 2.
The meeting is at the ANC 6D offices on the second floor of 1501 Half Street, SW, at 7 pm.
 

Some items from the past few days. Big ones first:
* It's probably been true for weeks, but I've just now been by Diamond Teague Park for the first time in a while and can confirm that construction is definitely underway there. Fences are up, cranes (three of them?) are in place, and workers were there. Pictures tomorrow. (Probably *lots* of pictures tomorrow from all over, as long as the weather stays reasonably clear.)
* City Paper got its hands on the letter Mayor Fenty sent to DC Delegate Norton about the city's priorities should the Feds decide to toss some stimulus package dollars in this direction. As I predicted, the two Near Southeast bridge projects were mentioned: "In particular, aspects of the Eleventh Street and South Capitol Street Bridge replacement projects could be undertaken immediately." He also mentions the city's backlog of maintenance projects, along with investments in Metro and the implentation of the streetcar project. And school modernization. And public safety issues.And environmental initiatives. And housing affordability. And health care. (And now here's the stimulus bill itself, though it doesn't get down into specific projects. On the other hand, considering these two bridges ease the commutes to and from the district of the House Majority Leader....)
* Back in mid-November, the transfer of the plot of land known as Reservation 17A from the Feds to the city finally took place; it runs between New Jersey Avenue and Second Street, and is straddled by the trash transfer station building. With this now under District control, various wheels can start turning in that area, including allowing the establishment of I Street between Second and New Jersey that will form the southern boundary of WC Smith's 800 New Jersey Avenue project. There's hopes that the trash transfer station could be demolished in 2010.
* Reader T. reported yesterday that a small bought-at-the-hardware-store For Sale sign went up at 10th and M yesterday, in front of the fence of the Exxon station. I'm not sure what the deal is, since the land is actually owned by the Exxon Corporation, and you'd think they'd have better methods of marketing the land.
* The public notice for the March 19 Zoning Commission hearing on various Capper PUD alteration requests is now available.
* WBJ reports that the Nationals have parted ways with Centerplate, last year's concessionare at the ballpark. This year it will be Levy Restaurants for the food and Facility Merchandising Inc. for the retail.
* More of the fences are coming down at 55 M, as you can see on the web cam. (Though it took me more than a month to notice that the plywood "tunnel" at the Metro exit had disappeared.)
* The Douglass Bridge will be closed at 5 am Sunday until 10am-ish to test the swing span.
 

The agenda is out (though not net yet online) for Monday's ANC 6D meeting, and if you've liked the past few meetings, you'll love this one, because it's pretty much a rehash of recent agendas: the Capper PUD modifications (described here), the Capitol Quarter trash enclosures (perhaps the fourth time's the charm), and Akridge's Half Street project, which is going to the Zoning Commission at the end of this month. (For Southwest folks, the Hogate's liquor license discussion is back, too.) And, although it's not on the agenda now, I'm guessing there might be some inauguration-related discussions. The ANC meets at St. Augustine's church, Sixth and M streets, SW, at 7 pm.
 

It's been more than a year since WMATA first awarded the Southeastern Bus Garage property at Half and M to Akridge (and almost six months since the suit brought by Monument Realty over the bidding process was settled), and at Monday night's ANC 6D meeting there was a first public peek at the designs for this central site being called 25 M Street, on the block just north of Nationals Park bounded by Half, M, N, and Van. And clearly Akridge is taking this project very seriously, as they arrived at the meeting with an army of people, including heavy-hitter architects Bill Hellmuth of HOK (who designed the office portion), Philip Esocoff of Esocoff and Associates (designers of the residential portion), and Jon Eisen of StreetSense (the group working on the retail).
I don't have any renderings yet (hope to within a month or so), but the ones displayed showed buildings with what Hellmuth described as "much more active facades" that "are not like a K Street monolith." There will be three buildings: two office buildings totaling 363,000 square feet, and a 276-unit residential building at N Street with roof terraces from which residents can look into the ballpark and watch the games. The facades step "out" and "in" (far enough in some places to require a zoning special exception), including some spots in the M Street office building that will allow tenants to look south into the ballpark, too. The general feel is not unlike the Monument designs for the other side of Half. (And, with a raze permit already requested, none of this incorporates the existing bus garage building.)
There will also be 56,000 square feet of retail, with a mix of one-, two-, and 2 1/2-story spaces occupying 69 percent of the ground floor, which will require a special exception from the Capitol Gateway Zoning Overlay's requirement of 75 percent. They are expecting to have national retailers for the spaces along Half Street, but are planning to look for smaller local "service" retailers for the additional space along Van Street.
They are also creating what they call the "Via," a pedestrian-only "street" that runs from Half to Van between the two office buildings at the same spot in their block as "Monument Street" will be across the way (just south of 55 M). They are envisioning a "one-of-a-kind" DC destination: a marketplace with stalls and local vendors, where you could get fresh food, "quick-bite" carry-out, etc. (They mentioned Pittsburgh as an example, and I'm assuming they're referencing the Strip District.) The renderings also showed two glass-enclosed suspended walkways above the Via to connect the two office buildings.
The entire project will be LEED certified (as is now required in DC), though they aren't sure yet what level they'll be shooting for ("the goal is to get as high as we can"). Hellmuth said that HOK is not doing a single building in DC right now that isn't at least LEED Silver, and that all major tenants want to be in LEED buildings.
I didn't get the total number of underground parking spaces, but the residential will have three spaces for every four units. (Monument's project across the street, of similar size, would eventually have about 700 spaces.)
Akridge indicated that their "ideal start date" is January 2010, with construction of the entire 700,000-sq-ft project estimated at 22 months. But there is no firm commitment that it will start at that time (thanks to the Current Economic Situation), plus it could end up being built in phases.
The ANC commissioners seemed receptive to the plans (Bob Siegel said that it gave him a "nice, warm feeling"), though with the usual questions about employment for local residents and LSDBE considerations, and concerns about residents and tenants having to work around ballpark traffic.
Akridge was officially at the ANC to request its support for both the zoning overlay review and the special exceptions being requested. While some commissioners were ready to vote to give support immediately, others weren't, and so after a number of differing motions that all failed it was decided that representatives of both sides would work together to discuss "issues" so that the ANC can vote on the project at its Jan. 12 meeting. The Zoning Overlay Review hearing is on Jan. 29.
And, not that there's much to see yet, but I do know have an Akridge/25 M project page, mainly with views of the bus garage from various angles.
 

Just got back from ANC 6D's meeting, and I'll leave you waiting until Tuesday for the first details on Akridge's Half Street plans (I don't want to give it short shrift) but here's the other Near Southeast items of the evening:
* Commissioner David Sobelsohn said an announcement is likely coming next week that the city's 2009 Artomatic festival will be held in ANC 6D, "most likely ANC 6D07" (which is Near Southeast). I know nothing more than that.
* Sobelsohn also introduced a resolution to send a letter to Tommy Wells, DDOT, and other officials expressing the ANC's support for the continuation of free parking at RFK and the Nats Express shuttle buses "to reduce the incidence of illegal on-street parking in ANC 6D by people attending events at Nationals Park." The resolution passed 6-0. A few weeks ago it was reported that Wells wants to discontinue the service.
* The DC Housing Authority came requesting the ANC's support for a series of zoning items having to do with the Capper PUD, including extending some deadlines and also expanding the number of residential units offered. (You can read all about them here; I'm too worn out to go into them all again tonight.) There wasn't much discussion of the request itself, because the commissioners were, shall we say, displeased that a huge packet of supporting materials arrived on their doorsteps just last Friday (6D07's Bob Siegel didn't receive his at all, and were unmoved when told it was basically the same information they had received in July.
There was also displeasure expressed about the request to delay the start date for the Community Center at 5th and K to 2012, with the commissioners wondering what level the DCHA would consider a "critical mass" of residents that would make the center viable. (Only 300 of the planned 1500 units have been built so far, so it would seem that the threshold might perhaps be a bit higher.) But the Housing Authority made clear that obtaining financing for the project is the larger hurdle. The support request will be brought up again at the ANC's January 12 meeting.
* I admit that I didn't stick around for the late-in-the-agenda item on the Capper trash enclosures. But DCHA mentioned that they had met with the city's Public Space Committee in advance of their monthly meeting, and were making progress on modifications to the design. ANC chair Moffatt asked if the enclosures still exist at all in the new design, and when he got the "yes" answer, that ended the discussion.
 

The agenda for Monday's ANC 6D monthly meeting is out, and the most enticing item is Akridge looking for the commission's support in advance of its Jan. 29 Capitol Gateway zoning overlay review for its new 700,000-sq-ft mixed-use development at 25 M, on the site of the old WMATA Southeastern Bus Garage, in the block directly north of Nationals Park. At this point, little has been put forth publicly about the project other than it'll be a office/residential/retail mix, and is expected to get underway in early 2010.
Also on the agenda is a third go-round with the DC Housing Authority over the designs for some external trash enclosures for some of the units at Capitol Quarter. I wrote about the first discussion here, and the Hill Rag has the report on the second one. Will the third time be the charm, or will bad things come in threes? There will also be a status report about the Capper redevelopment in general.
There's also apparently a letter being brought by Commissioner Sobelsohn to express the ANC's support for retaining the Nats Express shuttle bus that brings stadium-goers to the neighborhood from the parking lots at RFK. I imagine that the ANC will be expressing some level of concern about increased traffic and parking problems if that shuttle service goes away (it was reported last month that Tommy Wells is in favor of ending it).
The ANC meeting is at 7 pm at St. Augustine's Church at Sixth and M streets, SW.
 

The group of urban planning students at the University of Maryland who have been studying the lower part of Eighth Street will be presenting their "Connect Barracks Row" findings at a public meeting on Dec. 18 from 7:30 pm to 9 pm at the Navy Yard Car Barn, better known as the Blue Castle, at 770 M Street, SE. You can see the presentation from their Oct. 29 community meeting and read a little more about the project on their web site.
The students' work also got a write-up in today's Washington Business Journal (subscribers only), which says: "Their findings so far come as no surprise: Walking beneath the noisy highway is undesirable, parking isn't easy to find and there is little reason to go to the site in the first place."
In describing lower Eighth Street, WBJ also says: "A developer had plans to turn one block into housing and residential space, but that plan apparently went nowhere." Sounds like a reference to the original plans for the Admiral at 801 Virginia, which as I've been writing over the past few weeks has been redesigned as an office building and received its Board of Zoning Adjustment approvals on Tuesday.
There's also mention of the hopes by Madison Marquette to turn the Blue Castle into a 99,000-sq-ft retail destination, but no progress has been announced.
Comments (0)
More posts: 8th Street, meetings, Retail, zoning
 
302 Posts:
Go to Page: 1 | ... 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 ... 31
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.