Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: zoning
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


302 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 31
Search JDLand Blog Posts by Date or Category

In what chair Anthony Hood remarked might have been the Zoning Commission's first-ever landscape architecture-only case, the Zoning Commission on Thursday night approved the design for the first phase of the waterfront park at The Yards, the nearly 6-acre green space along the Anacostia River on the site of the once walled-off Southeast Federal Center. My project page has a number of the renderings that were displayed during the presentation, and additional descriptions of what's planned for the site can be found in these two blog entries.
Representatives of Forest City said that they are committed to opening the first phase of the park in the summer of 2009. The second phase, which will include the renovation of the Lumber Storage Shed and the construction of other retail pavilions and buildings, is expected to come before the Zoning Commission this fall. Phase 3 will be the piers and marinas. Somewhat surprising was the news that the floating boardwalk connecting the Great Lawn on the western side of the park to Diamond Teague Park and the ballpark is now going to be built by the city as part of the construction of Teague rather than by Forest City as part of this park.
Much of the discussion by the zoning commissioners (that I saw--I watched from home in my fuzzy slippers and the webcast went wonky a few times in the middle) centered around the pedestrian bridge that runs across the bulkhead and the new freshwater canal. Its very "forward" design---described by Commissioner Etherly as an "aggressive architectural play" and by vice chair Jeffries as a "Slinky," a moniker that I'm sure the developers would probably prefer to not catch on--was not met with universal acclaim. The commissioners did seem recognize its intended role as a piece of art and one of the iconic elements of the park. Jeffries emphasized--and others agreed--that because the designs for the buildings and for the "art tower" are coming at a later date, the bridge is setting the stage for the rest of the architecture at the park, and that the future designs must play off what the bridge has started.
Peter May did not like the bridge (though I missed a lot of his comments because of the webcast problems). He expressed a worry that the bridge, along with the not-yet-designed art tower and whatever's planned for Poplar Point, could create a series of "Look at Me" moments along the Anacostia, all trying to compete for attention. "The 'Look at Me' moment for a waterfront park should be the river itself," he said.
There were also discussions of the lighting plans, and concerns as to whether or not the bridge has a railing (it does). Jeffries asked a lot about the vegetation planned for the different sections of the park, and expressed a wish for some landscaping that is a bit more "wild" in nature, to which Forest City seemed receptive.
There were letters of support from ANC 6D, which voted 7-0 on May 12 to approve the plans, as well as from the Deputy Mayor for Planning and Economic Development and the National Capital Planning Commission, which approved the park's design back in February. So, in the end, the commission decided to go ahead and vote for approval of the plans immediately, although the issuance of the final order is subject to the commission receiving some new renderings showing more clearly the railing on the bridge. The vote was 4-0-1, with commissioner Turnbull not present.
Comments (0)
More posts: ANC News, Retail, The Yards, Yards Park, zoning
 

Last night the Zoning Commission voted 5-0 to extend the allowed building height and expand the total square footage of the proposed office building at 250 M Street in what is technically a modification to the Capper/Carrollsburg second-stage PUD that this office building is part of. The building, which will be going for LEED silver certification and which will have ground-floor retail, will now be 130 feet high and have 233,405 square feet of space. The discussions at the hearing centered mainly on the penthouse structure, the "next generation" elevator technology that allows for less overhead space, and how exactly the agreement with ANC 6D should be viewed.
William C. Smith's Brad Fennell testified that the developer has agreed to additional amenities beyond those in the original PUD (which included $325,000 toward the funding of Canal Park). He described the new amenities as "recruiting construction workers from ANC 6D by purchasing quarterly ads in the Southwester, creating an overall goal of 20% first-source employment for qualified ANC 6D residents, and providing contracting and new hiring opportunitiess for local residents and subcontractors by giving tiebreaking preferences to subcontractors headquartered in ANC 6D and for qualified construction workers living in that area." On May 12 the ANC tied 3-3 on the project, but apparently some subsequent tweaking of the proffer into this final form resulted in a letter from the ANC indicating that four commissioners would support the project with these additional amenities. The Zoning Commissioners felt that, since this was not an official vote of the ANC, it couldn't be given the required "great weight," but could be looked at the same as any feedback from a neighborhood association. The fact that no ANC members appeared at the hearing to testify in opposition also was noted.
You can read the Office of Planning report for all the specifics you could ever want about the changes in the design; if you're really interested, you can also read the original second-stage PUD approval of 250 M from last July, that last night's ruling is modifying. (The original Capper PUD is worth a look as well if you aren't familiar with what's been approved for the area's redevelopment.) Also, since I haven't mentioned it lately, it should be noted that this office building is technically a joint venture between WC Smith and the DC Housing Authority, with the monies from it helping to "financially leverage" the rest of the redevelopment of the Cappers.
This was the first vote; final action on this modification will be scheduled for a month or so from now. Earlier this year a WC Smith representative had told me that construction could begin in the middle of this year, but there was no mention of start dates at the hearing.
Comments (0)
More posts: 250 M/New DDOT HQ, M Street, zoning
 

* The Post's DC Wire blog is reporting that at 5 pm today DCRA will be having a lottery for the 28 street vending spots near Nationals Park. "Winners will enjoy their spots for one month, starting on June 1. Then the process starts all over again with a lottery on the last Tuesday of each month until the baseball season ends." (Vendors grumbling about neon-green On the Fly's vending on Half Street have found out that the eco-vendor is actually on private property.)
* From the Examiner: David Catania gets back into the baseball carping business, saying the city should get its money back from the consultants who predicted in 2005 that the Nats would average 39,000 fans in the first year at Nationals Park, since there's only been an average of 29,000 fans during the first third of the season. Catania says "that ERA may have seriously overestimated ticket sales, which represents a major portion of stadium-related revenues." However, DC CEO Natwar Gandhi has replied that "the ballpark bonds are structured in such a way "that a significant drop in attendance would not hinder our ability to pay debt service" and that "in a worst-case scenario, total attendance at the new stadium could drop to approximately 10,000 people per game without affecting debt-service payments." The Examiner also says: "Ticket prices at the new ballpark are 20 percent higher than the consultant predicted, Gandhi said, which will drastically reduce the effect of reduced attendance." I wonder if the consultants factored in cold and miserable April weather? The Post's DC Wire has more on this.
* The Nats announced earlier this year that tours of the ballpark are available on non-gamedays; yesterday they sent out word that proceeds from those tours will benefit the team's Dream Foundation, which currently has a number of initiatives underway, including the Neighborhood Initiative that's providing three years of funding to the Earth Conservation Corps. Info about the tours is available here.
* My Ballpark and Beyond column in today's District Extra is short and sweet, with blurbs on the RiverFront/Florida Rock zoning approval and the almost-arrival of 700 new residential units at 70 and 100 I Street.
* Also in the District Extra is a big piece on whether the diversity of the Nats' roster, "combined with their state-of-the-art stadium, will be enough to attract young blacks and Latinos to the game in the District."
* DC United wants the city to pay $225 million for its Poplar Point stadium, which the Post says is "far more than some city leaders say they would support" and that "even the amount officials have considered, $150 million, has raised some concern with D.C. Chief Financial Officer Natwar M. Gandhi, whose analysis has concluded such a deal could push the government above a Wall Street debt ceiling that he recommended last year." In the meantime, Marc Fisher thinks it's all a bad idea.
 

It's nowhere near as exciting as zoning hearings (then again, what is?), but I see that the City Council hearing on the bill to close a 2,400-sq-ft alley on Square 700 is happening tomorrow (May 29), after having been canceled back in February. The alley is just north of what used to be the BP Amoco station on South Capitol Street at N (which is now Nats Parking Lot N). Monument Realty is requesting this closure to allow for the combining of both the Amoco site and the parking lot to its north, with plans to build what was described in January as a residential building with 150-200 units and 14,000 sq ft of ground-floor retail space, as part of Monument's Half Street projects. Additional details are in my January report on Monument's request for ANC 6D's support (which they didn't get, thanks to a 2-2-1 vote). The bill is B017-0552, if you'd like some light afternoon reading. The hearing is scheduled be televised/streamed on DC Cable 13, starting at 10 am.
Comments (0)
More posts: 1221 Van, Monument/South Capitol St., zoning
 

There's two Near Southeast projects with hearings in front of the Zoning Commission this week:
* On Wednesday (5/28) the ZC will hear the request to extend the height of the office building planned for 250 M Street. I've written about this here, and you can read the Office of Planning's final report for much more detail on the request (and see the latest design). OP recommends approval of what is technically a modification to the Capper/Carrollsburg second-stage PUD (yes, this office building is part of the Capper redevelopment). After initially refusing to vote on the plan because of a lack of community benefits, ANC 6D voted 3-3 on it at its May meeting, which means there will be no support from the ANC. (I wasn't at this meeting, so I can't give you the specifics of what the developer offered to the ANC, or why the resolution didn't pass.) It's possible that 250 M will begin construction this year, but there's no confirmation of that.
* The next night (Thursday 5/29) the ZC will undertake a Southeast Federal Center Zoning Overlay District Review for the first-phase plans of the 5.5-acre waterfront park at The Yards. This design was approved by the National Capital Planning Commission back in February (with some suggestions for refining the pedestrian bridge that is one of the focal points of the design). The Office of Planning report for Thursday's hearing gives a lot of good detail on the plans for the park, as does my original entry from when the design was unveiled. OP supports the design for the park, while also hoping for refinements to the bridge and noting that there should be additional bike racks. You can all sorts of cool renderings of the plans on my Yards Park project page. The first phase of the park is expected to be finished by the end of 2009; subsequent phases, which will include piers and retail pavilions, will come later.
Comments (0)
More posts: 250 M/New DDOT HQ, The Yards, Yards Park, zoning
 

With a unanimous 5-0 vote after a brief discussion, the Zoning Commission approved last night the plans for "RiverFront," the 5.8-acre mixed-use project on the Anacostia River south of Nationals Park, ending the decade-long trip through the zoning process for the site long known as Florida Rock.
Before the final vote, chairman Anthony Hood quoted from the recent ruling by the National Capital Planning Commission that the RiverFront project "would not adversely effect" any federal interests. Remarking that the passage "says it all," Hood read: "This project is expected to bring activity and amenities to the Anacostia waterfront and is respecting the planning for the South Capitol Street corridor and the new Frederick Douglass Memorial Bridge. Furthermore, it is enhancing the connection of the Nationals Baseball Park and surrounding district to the Anacostia waterfront, goals supported by the Anacostia Waterfront Initiative[.]"
Now it's onto construction drawings and a trip through the city's permitting process. It's not expected that work will begin until sometime in 2009 on the first phase of the site, which includes an office building with ground-floor retail and a public plaza across Potomac Avenue from the ballpark's grand staircase. [see update below for caveat]
If you want to know more (dear heavens, I'm not going to go through all the details AGAIN), look at my project page for renderings and also scroll through five years' worth of news items on it all. UPDATE: The press release is out, and I'll note that it gives no indication of when the first phase could start. Given the Monument Realty news of financing troubles, Camden's pause at 1345 South Capitol, and the commercial real estate biz in general, it's probably best to now be pretty skeptical of start dates until permit approvals start popping up and shovels start digging into the ground.
Comments (0)
More posts: Florida Rock, zoning
 

The agenda for Monday's ANC 6D meeting has been sent around (although not posted on their web site, sigh), and it has a couple of Near Southeast items. There will be a presentation on the plans for the Waterfront Park at The Yards, in advance of a May 29 Southeast Federal Center Overlay District Review covering new structures that will be built to house retail pavilions at the park. There's also apparently a public space permit application from the Onyx folks at 1100 First Street for a fence along L Street, plus garden masonry piers and light fixtures. And the developers of the 250 M Street office building are back again, after having not gotten very far at last month's meeting with their request for support for a second-stage PUD modification at a May 28 zoning hearing to increase the building's height (but not its square footage) from what was originally approved, since the commissioners wanted a new round of community benefits in return for their support, which W.C. Smith balked at given that the project isn't requesting to take any new amount of public space. We'll see if there were any negotiations since then. The meeting will be at 7 pm at St. Augustine's church at 6th and M streets, SW.
 

Just a quick note that both the zoning review and special exception applications for the office/residential/grocery project planned at 401 M Street at The Yards and the Public Space Committee's consideration of an application for Five Guys to operate a sidewalk cafe appear to have been approved. (I didn't get to see either meeting, so I know nothing more than that.) See the entry below for additional links and details to find out what the heck I'm talking about. And normal posting here on the blog will resume very soon (I promise), since the JDLand batteries are now just about recharged.
 

Apr 23, 2008 10:36 AM
A somewhat busy Thursday (April 24) is on the boards:
* We might be getting some news on the state of Monument Realty's lawsuit against WMATA over the sale of the Southeastern Bus Garage to Akridge--the WMATA Board of Directors is meeting at 11 am, and the agenda for their executive session includes "Legal Issues - Monument vs. WMATA." I know nothing beyond that.
* Forest City's plans for the office/residential/retail project at 401 M Street will be getting a Southeast Federal Center Overlay District Review in front of the Zoning Commission at 6:30 pm at Suite 220 South, 441 4th St., NW; you can also catch it via live webcast, if it's working. Read more about this from my ANC 6D wrapup last week and an earlier entry on the project.
* And, if you want to make your voice heard about the public space application by Five Guys for a sidewalk seating area, the Public Space Committee will be bringing it up at its monthly meeting, at 941 North Capitol Street, NE, 7th Floor, starting at 10 am. This is the application that ANC6D refused to support last week because of the lack of a community benefits package for the "loss of public space."
 

Apr 17, 2008 8:56 AM
So, the faithful are streaming toward the ballpark as we speak. Although the 55 M cam showed the upper decks pretty empty with about 90 minutes to go, Channel 9 (already on the air with its coverage of the mass) gives a better view of the tens of thousands already inside. (48,000 people are expected.) How's everyone faring, either trying to get out of the neighborhood or into it for work? Or is everyone just staying home? And, for those reading this later today who went to the mass, how did your trip go?
In other news, my Ballpark and Beyond column this week is yet another one about stadium parking, taken mainly from my Monday night post about ANC 6D's muted reaction to parking and traffic issues (along with the Zoning Commission's approval of having additional lots built in Southwest if landowners want them). I also tossed in a quick roundup of the private cash lots springing up.
Comments (0)
More posts: ANC News, parking, Nationals Park, zoning
 
302 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 31
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.