Near Southeast DC: Past News Items
Yards Park
See
JDLand's
Yards Park
Project Page

for Photos, History,
and Details

Go to Full Blog Archive

 

129 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

Yards Park Phase 2 Plans Approved
Mar 3, 2009 9:20 AM
Last night the Zoning Commission unanimously approved Forest City's Phase 2 plans for the waterfront park at The Yards, which include three glass-enclosed pavilions offering 50,000-sq-ft of retail and a 60-foot "visual marker" at the edge of the water on the boardwalk. You can see more renderings and designs on my Yards Park page (scroll down a bit for Phase 2), and this National Capital Planning Commission report has a lot of information as well, with many of the same drawings that were presented last night. I described it all thusly a few months ago:
The "light tower," designed by James Carpenter Design Associates, is made up of stainless steel prisms that reflect light during the day and will be subtly illuminated at night. The top is actually 70 feet from the top of the water, but 10 feet of that is the boardwalk; the structure itself is only 60 feet high.
The storage shed, as I've mentioned in the past, will lose its faaaahbulous salmon-colored corregated skin and will be enclosed with non-reflective glass. The other two buildings (currently given the wonderfully descriptive monikers of P2A and P2B) will also be mainly glass structures. There will be a restaurant court in front of the center building, overlooking the area of the park that steps down toward the waterfront.
The commissioners were very complimentary of the designs, with only a bit of concern expressed about whether the tower (made of stainless steel prisms) was either a bit too small for its surroundings (commissioners Jeffries and Keating) or if perhaps its base was a little too plain (May and Turnbull). Turnbull was also concerned about sustainable design features of the pavilions, and, more succinctly, that the walls made all of glass would just make the buildings into "a very hot box." May also said that Forest City needs to come up with better names for the vertical marker and the retail pavilions, though he also dryly added he was "not advocating selling the naming rights."
The Office of the Deputy Mayor for Planning and Economic Development testified in support of the project, and the Office of Planning recommended approval--their staff report is worth reading for more details on the project and on the various zoning exceptions and speical requests Forest City was seeking. ANC 6D voted last month 6-0-1 to support the project, and there were no other witnesses either for or against the plans.
In the end, with the commissioners having made no requests for additional materials or clarifications, it was decided to take their vote immediately, and approval was given 5-0. Because this was a Southeast Federal Center Overlay Review, this was the only vote that will be taken.
The first phase, which is expected to begin construction in the next three months and be completed by mid-2010, is the basic layout of the park and the boardwalks. The third phase will be the piers and marina, which Forest City said last night is targeted for completion in 2012 or 2013.
Comments (6)
More posts: meetings, Retail, The Yards, Yards Park, zoning

Capitol Power Plant Going Green?; Yards Park Phase 2 Zoning Hearing Monday; Lawsuit to Stop 11th Street Bridges
Mar 1, 2009 9:56 AM
* (h/t reader F) The AP takes a look at the Capitol Power Plant just north of the SE Freeway, the neighborhood's second most "favorite" landmark (after the school buses) with its smokestacks obscuring the view of the Capitol dome from many locations. On Thursday, Harry Reid and Nancy Pelosi wrote a letter to the Architect of the Capitol asking that the power plant switch from burning coal to using natural gas for its operations, saying "The switch to natural gas will allow the CPP to dramatically reduce carbon and criteria pollutant emissions, eliminating more than 95 percent of sulfur oxides and at least 50 percent of carbon monoxide...We strongly encourage you to move forward aggressively with us on a comprehensive set of policies for the entire Capitol complex and the entire Legislative Branch to quickly reduce emissions and petroleum consumption through energy efficiency, renewable energy, and clean alternative fuels." The AP's story tells how Congress has been trying to clean up the plant and make it more "green," and the potholes in the road to making it run completely on natural gas. I'm guessing it wouldn't be wise to start counting the minutes until the smokestacks are gone.
* On Monday at 6:30 pm the Zoning Commission is scheduled to have its hearing on the Phase 2 plans for the park at The Yards, though we'll see if the weather wreaks havoc with the schedule. Here's my notes on the presentation of the designs to ANC 6D, and my Yards Park page has renderings.
* (UPDATE) Missed this--the Examiner reported on Friday that the Capitol Hill Restoration Society has filed suit to stop construction of the new 11th Street Bridges, citing its "significant, irreversible, adverse effects" on the surrounding area. The CHRS web site has a bit more detail as well.
* Tickets still available for Elton and Billy. Apparently there was a bit of a glitch yesterday when they went on sale.

ANC Supports Yards Park Phase 2; Tidbits on 11th Street Bridges; Nothing Else
Feb 11, 2009 1:29 PM
* With thanks to SWill for passing the word (since I couldn't attend the meeting), I can report that ANC 6D on Monday night voted to support the plans for phase 2 of the Yards Park, which will be going in front of the Zoning Commission on March 2. (You can read my summary of last week's presentation to the ANC on the plans for more information.)
* If you're looking for analysis of what exactly the plans for the new 11th Street Bridges configuration might mean, Greater Greater Washington is taking a look at them (part one here; part two not yet posted). For what might perhaps be called an opposing viewpoint, DDOT's chief engineer Kathleen Penney contributed this article in the February Hill Rag about what DDOT sees as the benefits of the project. And, if you want some 11th Street Bridges material to use as a sleeping aid, I pass along this link (via Tommy Wells's blog) to the RFP for the design/build contract. (The "amendment" link is the *slightly* more comprehensible one.) There was a hearing last week on a bill about the contracting procedures for the bridge, but I'm not *so* desperate for content to wade into that.
(UPDATE) I already posted about this, but it's a good time to mention again that there's a public forum on the 11th Street Bridges on Feb. 17: "Sustainable Development, Infrastructure, and the Future of the District of Columbia," at the MLK Library at 6:30 pm. (DDOT just sent around its own announcement, now posted online.)
* And hey, check it out, the council has finally updated the user interface for its legislation database!
* Other than that, all is very quiet these days. Though those following my Twittering were apprised yesterday of this breaking news item: "[I] Dreamt last night that 3rd and K Market was reopening both as a bodega and a swank Indian food joint. With a new noodle place next door."

Lazy Weekend Tidbits: Capitol Quarter, ANC 6D
Feb 8, 2009 11:10 AM
Been kind of a nice few days here without much news, so now I'm having to force myself back into the routine. I'll start small:
* An update to the post about the new houses released at Capitol Quarter: EYA tells me that the houses released are spread throughout the development: 421 L Street, under construction and expected to be ready in April (listed for $720,340 on the EYA "Move In Now" list), two houses in the block just to the north (expected to be ready in the fall), and four houses in the block bounded by I/Virginia, Fifth, Fourth, and K that could be ready by the end of the year. On all of these blocks the reservations placed by homeowners over the past few years have now been converted to contracts; that is expected to happen for the final Phase 1 block (between Third and Fourth and Virginia and I) later this year.
* The agenda for Monday night's ANC 6D meeting is posted, and it includes a vote on the Phase 2 designs of the Yards Park that were discussed at last week's special meeting. I've also now added a bunch of those Phase 2 renderings to my Yards Park page. Other items on the ANC 6D agenda are about Southwest subjects, though I should note that the National Marathon on March 21 (which they'll be discussing) will be coming across the Douglass Bridge, briefly using South Capitol Street until it turns west on P Street.
There's also an agenda item about a BZA application for 1101 South Capitol St., SW, which was the old KFC. This is a good opportunity for me to mention that, with two blogs about Southwest now in full flight, I'm going back to my original boundaries, which old-timers will remember stopped in the median of South Capitol Street, which is where Southeast ends and Southwest begins. I'm lucky enough to be watching a neighborhood that has probably the firmest boundaries of any in the city, so I'm going to respect them!
* City budget season is nearly upon us. I've added to my calendar a partial list of dates for FY08-09 oversight and FY10 budget hearings, for agencies that have the most bearing on Near Southeast. Check the DC Council web site for the full list.

First Look at Phase 2 of the Yards Park
Feb 2, 2009 11:00 PM
Tonight ANC 6D had a special "presentation" meeting, to lighten the load of next Monday's business meeting so that everyone could go home before 2 am. On the agenda were three items, all of which are JDLand perennials. I'll post on Tuesday about the Capper zoning stuff and the South Capitol Street EIS, which didn't really contain much that I haven't previously covered; the third item was the designs for the second phase of the waterfront park at the Yards.
The first phase, which is expected to begin construction in the next three months and be completed by mid-2010, is the basic layout of the park and the boardwalks. The second phase comprises 55,000 square feet of retail in the to-be-rehabbed Lumber Storage Shed and two new buildings, as well as a 60-foot-tall "visual marker" (seen at left) just to the southwest of the shed. (The third phase will be the piers and marina.) I was dreading coming home to describe these latest plans with no renderings to accompany my ramblings, but then I found the National Capital Planning Commission has done all my work for me, thanks to these phase 2 designs being in front of the commission at their meeting this Thursday (and for which the NCPC staff has recommended approval). You can see all of the drawings presented to the ANC in this NCPC document, along with a lot of description of the designs, but I'll hit some highlights.
The "light tower," designed by James Carpenter Design Associates, is made up of stainless steel prisms that reflect light during the day and will be subtly illuminated at night. The top is actually 70 feet from the top of the water, but 10 feet of that is the boardwalk; the structure itself is only 60 feet high.
The storage shed, as I've mentioned in the past, will lose its faaaahbulous salmon-colored corregated skin and will be enclosed with non-reflective glass. The other two buildings (currently given the wonderfully descriptive monikers of P2A and P2B) will also be mainly glass structures. There will be a restaurant court in front of the center building, overlooking the area of the park that steps down toward the waterfront. (A drawing of the three buildings' southern facades is here; a larger version of the rendering at right showing how the buildings are not at all dominant when viewed from the waterfront is here. See the NCPC document for additional views.)
The questions from the ANC commissioners included whether this public park financed by public dollars and owned by the city would be open to the public, whether there would be preferences for ANC 6D-based businesses for the retail spaces and the six kiosks planned near the light tower, and if there would be any city-controlled vending spaces in the park.
The designs will be presented to the Zoning Commission on March 2 (there are also some exceptions and/or variances being requested). The ANC will presumably be voting on whether or not to support the project at its Feb. 9 meeting.
Comments (0)
More posts: ANC News, lumbershed, meetings, The Yards, Yards Park, zoning

Special ANC 6D Presentation Meeting on Feb. 2
Jan 27, 2009 7:45 PM
With developers of three large projects needing to make presentations, ANC 6D has decided to have a separate presentation meeting on Feb. 2 in advance of its Feb. 9 monthly business meeting. And all three are Near Southeast spectaculars:
* The Housing Authority will be there to talk about the various modifications it's seeking to the Capper PUD, in advance of its March 19 Zoning Commission hearing;
* DDOT will be making a presentation on the final South Capitol Street Environmental Impact Statement (this includes the plans for the new Douglass Bridge), which I wrote about a few weeks back; and
* Forest City will be making a presentation about the park at the Yards (I believe these are the designs for Phase II, which include the various pavilions and the docks and marinas). The National Capital Planning Commission will be taking a look at Yards designs at their Feb. 5 meeting, and the Zoning Commission hearing on the park's second phase is scheduled for March 2.
The meeting is at the ANC 6D offices on the second floor of 1501 Half Street, SW, at 7 pm.

Roundup: NatsFest, Wendy's, Yards Park, Teague Park, Lower Barracks Row
Jan 22, 2009 1:53 PM
Pulling together some reminders and other recent Twittered tidbits:
* This Sunday is NatsFest at the ballpark, from 1 pm to 5 pm. It's being held indoors in the various club areas, so if you've never gotten to see some of the lounges, or the conference center, or the clubhouse, this might be a good opportunity. Season-ticket holders get four free tickets; for the rest of the world it's $10 for adults and $5 for children under 12.
* Last week a raze permit was issued for the defunct Wendy's on I Street. No word on when demolition will actually occur. This is where JPI is planning its fourth Capitol Yards apartment building, 23 I Street, but there's been no recent intelligence on when they might decide to get underway.
* Construction hasn't yet begun on the Park at the Yards, but some additional information and more detailed renderings should be coming to light over the next month. Forest City is scheduled to make presentations to the National Capital Planning Commission on Feb. 5, and the Commission on Fine Arts on Feb. 16, and possibly ANC 6D on Feb. 9.
* A reader is reporting this morning that a derrick crane is going up at Diamond Teague Park--perhaps that's to begin work on the water taxi piers. (Though note that there was already a crane of some sort there back in December when I took these photos.)
* Apparently the various property owners surrounding the section of Eighth Street south of the freeway have gotten together along with the Capitol Riverfront BID to start working on plans to perk up the area, using the Connect Barracks Row report by University of Maryland Urban Studies and Planning students as a jumping-off point. Look for public meetings in February-ish.

New Streets Arriving at The Yards
Dec 10, 2008 11:07 PM
Work is continuing on the infrastructure at The Yards, and there's now a lot of new pavement recently laid down. Fourth and Tingey is starting to look like a real four-cornered intersection, with Fourth now extended southward one block to the new Water Street that will be the northern boundary of the Park at the Yards. The paving of what will be a new section of Third Street south of Tingey (next to the Foundry Lofts) was completed last month (though it's hard to see in the photos I last took in November--the hassles I get from the USDOT security people lessen my enthusiasm for trudging to Third and Tingey very often). Plus, Tingey itself now has all of its lanes reopened as well. It's all still a construction zone, but it looks like traffic is now (or will be soon) routed into the surface parking lots at Third and Fourth via the new streets.
In many of these photos you can also see the progress on the two new floors on top of the Foundry Lofts building. It's scheduled to open in mid-2010.
Comments (0)
More posts: Foundry Lofts/Yards, The Yards, Yards Park

Mayor Talks About Progress Along the Anacostia; Status Updates on Parks, Bridges, and the River
Nov 14, 2008 2:56 PM
This morning Mayor Fenty held a press conference at Nationals Park with various city officials to highlight tomorrow's Anacostia Waterfront Information Fair, and also talk up the recent progress and near-term next steps for the more than $8 billion worth of economic development, transportation, and infrastructure projects in the pipeline along the Anacostia River (not only in Near Southeast, but from the Southwest Waterfront all the way up past RFK).
Having sworn off taking any more photos of The Mayor at the Microphone (unless he shows up in a Hawaiian shirt and swimtrunks or something), I decided to record the 20-minute event instead, so that the five or six of you interested in hearing the remarks can do so. (It's a 2.6-mb MP3 file; the first few seconds are rough, but then it settles in.)
If you listen, you'll hear how the mayor managed to cajole the notoriously camera-shy Stan Kasten into saying a few words about what's happening along the river and in the neighborhood from the point of view of the area's largest tenant. Deputy Mayor Neil Albert, DDOT Director Frank Seales, Office of Planning head Harriet Tregoning, and the director of the city's Office of the Environment George Hawkins spoke as well. There was some discussion throughout (and especially at the end) about how the slowing economy might be impacting both the city's plans and developers' projects, but the mayor remains optimistic.
The press release from the mayor's office sums up the main points of today's event, but here's the Near Southeast-specific highlights from both the remarks and some other chatter of the day. First up, news of the three big parks:
The city "will break ground at Diamond Teague Park by the end of 2008." (And the guide for tomorrow's fair says that the park will be completed in spring 2009, which is the same date we've been hearing for a while.) The mayor also touted the operating agreement with Forest City Washington to build and maintain the $42 million, 5-acre Park at the Yards (but you knew about this already), as well as the the agreement with the Canal Park Development Corp. to build the $13.1 million, three-block-long park. (No mention of school buses.)
Then there's the bridges: Reconstruction of the 11th Street Bridges is scheduled to begin in mid-2009. (The shortlist of firms vying for the design-build contract was announced a few weeks ago.) Whether we actually see heavy equipment moving in mid-2009, or whether this just marks the first part of the design-build project is not quite clear. I was also told that the contract to demolish the flyover ramps to and from RFK could be completed soon, and that demolition would happen not long after the contract is signed.
Plus, the final Environmental Impact Statement for South Capitol Street and the Douglass Bridge is expected in spring 2009; that's when we'll hear which of the four bridge designs has been chosen.
As for the river itself, the city has started real-time water quality monitoring, updated automatically online 24 hours a day. There's also now the Anacostia 2032 Plan "to make the Anacostia River boatable, swimmable, and fishable in 25 years." And a Green Summer Jobs Corps was created earlier this year to "engage youth in the cleaning and greening of District neighborhoods and parks and to introduce them to green-collar job opportunities."
Finally, a planning process is underway to revamp Boathouse Row, the stretch of boat clubs along the Anacostia between 11th Street and Pennsylvania Avenue. (I took a bunch of photos near the boathouses a few months back, and have been lazy about ever getting them posted, though you can see a few boathouse-free shots of the environs here and here.)
There's more about projects elsewhere along the Anacostia, but other bloggers get to cover those. Will update this post if there's any media coverage from today's event, and will have a fresh post on Saturday after the fair. I imagine I'll Twitter a bit from those festivities (like I did from today's); remember that if you aren't a Twitter-er, you can read my tweets on the JDLand homepage--check 'em out frequently, because I do sometimes post news there first, before I write full blog entries.
SATURDAY FAIR UPDATE: They're now going to be providing free shuttle bus service from the New Jersey & M Metro entrance to/from the ballpark, from 12:30 pm to 5:15 pm. (After they heard somewhere that the Half and M subway entrance is going to be closed on Saturday.)

Dogfish Head Alehouse, Jazz Club May Come to the Yards (Teeter, Too); Whole Foods and Square 737
Nov 14, 2008 9:27 AM
Today's print edition of the WashBizJournal has some big retail-related Near Southeast items of interest:
* "The developer of The Yards, the 42-acre Anacostia riverfront project near the Nationals ballpark, is close to landing a jazz club and Dogfish Head Alehouse and may move its local headquarters to the former Navy Yard. The two retail tenants would be the first in the Boilermaker Shops, a three-story industrial building with walls of red brick and plate glass on Tingey Street between Third and Fourth streets SE." (The Boilermaker Shops are scheduled to open in mid-2010, along with the Park at the Yards and the Foundry Lofts.)
* The planned office building at 401 M could become home to Forest City Washington's headquarters; it's the one with the grocery store space in the ground floor. WBJ says Forest City "is 'nearing a deal' with a grocer for 50,000 square feet and an announcement could come in 60 days. He would not reveal the chain, but sources say it is Harris Teeter Inc. which has two D.C. stores and plans a third in Northeast." 401 M is not expected to be constructed before 2011, however.
* Also on the grocery store front, confirmation of the rumor that's been hashed around here lately: "William C. Smith & Co., meanwhile, has been in discussions with Whole Foods Market Inc. about a store in its planned 4-acre development between New Jersey Avenue, H and Second streets, known as Square 737." (See, I tried to tell you folks it wasn't going to be at New Jersey and K; and Jonathan, you're welcome for this tip.)
UPDATE: Finally getting *some* piece of news about 800 New Jersey finally spurred me, after all this time, to create a project page for it. There's no renderings, just a bunch of "before" pictures, but at least it's something. And, since talk of grocery store on this site back in *1999* was one of the first tidbits that led me to start paying attention to the neighborhood, I guess it finally deserves its own page.

Lots of New Photos From Around The Yards
Oct 31, 2008 1:15 PM
As I mentioned a few days ago, I was able to snag some time behind the fences at The Yards this week (with permission!!) and took a bunch of pictures. I also took this opportunity to do a bit of cleanup on the many Yards pages on this site, so if you haven't wandered through all of them in a while, I suggest taking the time to do so, keeping an eye out for the ubiquitous icon. Some highlights (click through to the pages for more details on each project):
* I posted a fair number of photos (plus some new renderings) of the Foundry Lofts at Third and Tingey, where the new top two floors are starting to be framed. You can also see how the a portion of the new Water Street just south of the Foundry has been paved, and curbs have been installed; ditto with the new portion of Third Street that will run alongside the building down to the park.
* There aren't really many exciting new photos of the Yards Park yet, but I added in new renderings and also spruced up the page some. The park and the Foundry Lofts apartments (along with the Boilermaker Shop retail pavilion) are expected to deliver in mid-2010.
* I made my first close-up visit to the Factory 202 building at Fifth and M (the old Gun Assembly Building), and got a few new images like the one at right. (Look for the "Pistol Range" photo for added entertainment.) This building is expected to be condos, delivering in 2011.
* I added a lot of new images to the Later Phases page, where you can see a good close-up of the little Building 74 next to Factory 202, which will eventually be townhouses. You'll also see more of the infrastructure work going on, including curb cuts already in place at Fourth and Tingey (even though the southern part of Fourth doesn't exist there yet). There's also a new red brick wall going in along the boundary with the Navy Yard, where a new block of Fifth Street will be built.
* You should also check out my Yards Overview page for the hard-to-read map, to help orient yourself to all the locations.
* Or, if you just want a pile of pictures without the "guided tour," here's all the new photos on one page (which includes images not posted on any of the above pages.) Click the icon to see other photos from the past few years from the same location.
Hopefully that's enough to keep everyone entertained for a while.

Yards Park Public-Private Partnership Announced
Oct 29, 2008 2:17 PM
This morning inside the Boilermaker Shop at Fourth and Tingey Mayor Fenty announced the completion of a $42 million public-private partnership to fund and maintain the 5.5-acre Waterfront Park at The Yards. He was joined by Forest City's Deborah Ratner Salzberg, Ward 6 Councilmember Tommy Wells, and Capitol Riverfront BID executive director Michael Stevens, all of whom extolled the potential not only of the park (the neighborhood's "front yard", Stevens said) but of all of what is coming to Near Southeast. In the press release, Fenty is quoted as saying, "This is a great example of the kind of great urban spaces we can create when we think creatively and work together with partners who share our vision for transforming the banks of the Anacostia River into a world class waterfront."
Construction will begin on the park in January, and is being funded by the PILOT (payment in lieu of taxes) that the city created last year. Once the park is built, the BID will be in charge of maintaining and "programming" it. One caveat for those who have been looking forward to seeing the park completed--it is now scheduled for a mid-2010 opening, along with the Boilermaker Shop and the Pattern Shop Foundry Lofts (they renamed the dang building; I can't wait to change it everywhere on the site).
I took a few photos at the event (seems like it's been forever since there was one of these, especially after the avalanche of them back in 2007 and early 2008). You'll also see on that page the latest renderings of the park, the Foundry Lofts building, and some views along Water Street. The park images aren't new, but the others are, and it may be a few days before I get them integrated into the site, so I figured I'd toss them up here for now.
I also got to take a tour behind the fences across much of the 44 acres of The Yards, and of course snapped a bunch of photos. However, since there are hardly any *streets* in most of these locations just yet, it makes my cataloging and posting of pictures much more time-consuming than with other projects. So I hope to post them in the next few days. At least the sun was out, unlike last time!
There was a fair amount of media at this event, so check back for links to stories (and the press releases, once they're posted).
UPDATE: A video report from NBC4, and a few paragraphs from the Post. The AP gave it a little write-up, too. And the Yards has now posted its own press release.

Development Slows in Ballpark District; Yards Park Funding Announcement on Wednesday
Oct 28, 2008 11:30 PM
Nothing in this WashTimes piece will be news for people who wander by here on a regular basis, but "Economy halts developers' ballpark plans" is a good survey that's probably still worth a read in case you've missed something. The crux is that the current economy has put an end to building on spec--"'Until you're getting your office building 70 percent leased up, you're not moving forward,' said Michael Stevens, executive director of the Capitol Riverfront Business Improvement District." And with things as they are, companies aren't moving to new office space, either. There's also this: "Monument Vice President Russell Hines said the financing difficulty is not because of pre-leasing requirements but rather demands for larger amounts of collateral on loans. Lenders once were willing to finance 75 percent of a project with only the project itself as collateral. Now, however, companies ask developers to put up additional assets to back the loan, even for just 50 percent financing."
One thing that is moving forward: Wednesday morning the mayor will be announcing a $42 million public/private deal between Forest City, the city, and the BID to build and maintain the 5.5-acre waterfront park at The Yards. The target date for the park has been mid-2009; we'll see at tomorrow's event whether that's still in the cards.
UPDATE: On his blog, Tim Lemke of the Times addresses a few issues that Forest City had with his article. And my entry on the park announcement is here.
Comments (1)
More posts: The Yards, Yards Park

Upcoming Events: Living Classrooms Fundraiser, Navy Yard Special Events
Oct 22, 2008 3:13 PM
* A reminder that Friday night (Oct. 24) is the "Night at the Yards" fundraiser for Living Classrooms of the National Capital Region. Individual tickets are $125 in advance, $135 at the door for the event to be held in a big tent at Fourth and Tingey, with music by the English Beat and Rita Rocks. Living Classrooms is planning to eventually build its new main campus building on the eastern end of the waterfront park at the Yards, near the Navy Yard.
* Also on Friday night is the annual "Ghost Ship Barry" event, where kids can take a haunted tour of the display ship Barry at the Navy Yard. "The Ghost Ship Barry is suitable for children ages 4-9 from 5 to 7pm. After 7pm, Ghost Ship Barry will become much scarier and is only appropriate for children over the age of 9. This event is free and open to the public, but a 24-hour RSVP to 202-433-6897 is required for entry to the Washington Navy Yard. Please do not wear Halloween costumes for safety reasons."
* On Saturday night (Oct. 25) the Navy Yard is offering a candlelight tour, starting at the Navy Museum at 7 pm. This is also free and open to the public, but also requires a 24-hour RSVP for entry. Free parking is available.
Comments (0)
More posts: Navy Yard, The Yards, Yards Park

More Upcoming Events: Wachovia Branch Grand Opening, 'Night at the Yards' Benefit
Oct 2, 2008 8:40 AM
Two upcoming events, mentioned in the Capitol Riverfront BID's e-mail-only newsletter:
* On Friday (Oct. 3), the new Wachovia Branch at 20 M Street is having its official Grand Opening celebration, from noon to 4 pm. Stop by "for some food, music, and prizes!"
* On Oct. 24, the nonprofit group Living Classrooms is holding an event dubbed "A Night at The Yards," to raise money for their operations, including the Discovery Creek Children's Museum, and the City Kids Wildreness Project. It's at at Fourth and Tingey streets, from 7 pm to 12:30 am. Tickets are $125 each. There will be food and drinks, and a performance by the English Beat. (No, seriously.) Living Classrooms, a non-profit group that "uses maritime settings, community revitalization projects and other challenging learning environments" to provide hands-on education and job skills training for students (especially at-risk youth), has plans to eventually build its new "main campus building" on the far eastern edge of the Waterfront Park at the Yards
Comments (0)
More posts: 20 M, Retail, The Yards, Yards Park

NCPC to Give Approval to Diamond Teague Park Plans
Sep 3, 2008 5:04 PM
On the consent agenda of Thursday's National Capital Planning Commission meeting is a request for "approval of preliminary and final site development plans" for Diamond Teague Park, the new public park to be built by the city on the Anacostia River at the foot of First Street, SE, just across Potomac Avenue from Nationals Park.
As I've written about in the past, plans call for piers to be built around the red brick Capitol Pumphouse that is home to the Earth Conservation Corps, and there will also be floating docks that will allow visitors to see the wetlands along the water's edge (one of the last waterfront segments in the area not to have been bulkheaded, apparently). Benches, granite paths, and a garden will be installed, along with a memorial to Diamond Teague, the ECC volunteer who was murdered in 2003. Eventually this park will be connected via a floating boardwalk to the Waterfront Park at the Yards.
In the Executive Director's recommendation, the NCPC commends the city "for linking this project to planned open space along the waterfront to provide a continuous public open space system along the Anacostia River; for developing a portion of the Anacostia River as a high-quality urban park with a mix of recreational opportunities that emphasizes the river's ecological and scenic qualities and character; and for providing accommodations for a water taxi system to serve the neighborhood and the Washington Nationals' baseball stadium."
Statements over the summer from the Office of the Deputy Mayor for Planning and Economic Development (which is stewarding the park) indicated that work will begin on the park this fall, with this first phase completed by spring 2009. (And yes, that includes the water taxi piers. Though there's been no word yet of any deals with taxi companies.)
Comments (0)
More posts: Teague Park, Water Taxis/Riverboats, The Yards, Yards Park

Yards Park Phase II Zoning Hearing in March; Living Classrooms Plans Main Campus Building
Aug 19, 2008 9:05 AM
It's more than six months away, but the second phase of the Waterfront Park at the Yards is now scheduled for a Zoning Commission SEFC Overlay District Review on March 2, 2009 (after having briefly been scheduled for Nov. 17, 2008). It's in this review that we'll see the plans for the renovation of the Lumber Shed into a glass-walled retail building, plus the designs for two new two-story retail pavilions connected to the shed's east side. There will also be the first look at the proposed "public art tower" that Forest City is wanting to build right on the waterfront at Third Street.
You can see early designs for the three retail buildings (and the position of the art tower, if not the design itself) in the rendering on my Yards Park page, right at the center, and of course plenty of photos of what the area currently looks like.
One other project at the Yards park that is just starting to pop up on the radar is a new "main campus building" for Living Classrooms of the National Capital Region, to be located on the far eastern edge of the park (just off the right edge of the rendering), along the waterfront just before the park meets the Navy Yard. Living Classrooms is a non-profit group that "uses maritime settings, community revitalization projects and other challenging learning environments" to provide hands-on education and job skills training for students (especially at-risk youth). They will be handling the design and management of the new environmental center at Kingman Island further up the Anacostia, and currently operate out of Building 74 at the Yards (the little brick building--to be townhouses someday--just west of Hull Street at M, seen here). And, according to their web site, Living Classrooms has been "asked to oversee and manage marina and some waterside activities" at the new Yards park.
There is no timeline for when Living Classrooms' new building will get underway. It's currently in the design phase (see an early rendering here), and when that's completed, there will be a fundraising drive to finance the project.
Comments (2)
More posts: Retail, The Yards, Yards Park, zoning

More Photos from Inside the Yards (Park, Shed)
Jul 25, 2008 1:50 PM
The skies were threatening during my visit, so these aren't the most shimmering photos, but I do now have a big batch of new photos from the areas along the Anacostia River that by the end of next year should be transformed into the nearly six-acre Waterfront Park at the Yards. Right now it's mainly a lot of dirt, so I suggest spending some time looking closely at the rendering at the top of the page to orient yourself to the locations of the various photos and what the vistas should eventually look like. (The map at the top of my main Yards overview page is helpful, too.) I also got some photos inside the Lumber Storage Shed, that oddly terra cotta-colored building near the water's edge which will be having its corregated tin exterior stripped and replaced with glass as it's turned into a retail pavilion.
I've also posted some additional photos in the archive at spots where intersections will exist later this year when River and Water streets are created and when Fourth and Fifth are extended down toward the water. (Again, look at the map.) Really, these photos are nothing more than placeholders, but I just had to have the "befores" in order to be able to enjoy the "afters" someday....
(And don't miss my photos posted a few days ago of the interior of the Boilermaker Shop and of the latest progress on the Pattern Shop Lofts building.)

Pre-Holiday Wrap Up
Jul 3, 2008 9:40 PM
Not that there's probably anybody left in town (*tap* *tap* -- is this thing on?), but just in case, here's a few items before I downshift into low-posting holiday mode over the weekend and into next week:
* My Ballpark and Beyond column in today's Post covers some of the latest news on retail (i.e., banks) I've posted here over the past few weeks (Wachovia at 20 M, SunTrust at 100 M, plans for 900 M). There's also a blurb on the month-old news of the zoning approvals for the Waterfront Park at the Yards. The column normally appears in just the District Extra, but If you live in Prince George's County, you got a crack at it this week as they snuck it in on page 11 of the P.G. Extra, too. But note that we're scaling way back on how often the column will appear (probably just monthly from now on) since the news isn't flowing as fast and furious-ly as it was last year.
* No one's invited me to the roof of any of the sparkly new Near Southeast buildings to watch the fireworks. I'll say it: I'm miffed. I do and I do and I do for you people, and this is the thanks I get.... [/sarcastic martyr mode off]
* I've tinkered again with the big homepage map, trying to have it make a little more sense. I've added checkmarks for the completed projects, and turned the list of projects down the left side (marked on the map with boxes) into only ones that are under construction or ones which the developers have done an especially good job of making me believe they'll start soon. The rest of the map is a whole lot of stars marking proposed projects. And they're all color-coded to differentiate between office, residential, and recreational/retail.
My real desire is to completely redesign the homepage, but I haven't had any inspirations come to me yet. Although, in the meantime, I've added another three random before-and-after photo pairings down on the bottom right of the homepage (after you do a lot of scrolling), just to fill some space. I also expanded my Neighborhood Blogs list of links.
Happy 4th, everyone!
Comments (1)
More posts: 900m, Retail, The Yards, Yards Park, zoning

Speaking of the Yards - Twilight Renderings
Jun 27, 2008 2:50 PM
I've been coveting electronic versions of the newer twilight-styled renderings of upcoming Yards projects, which have been taunting me from the fence drapings along Tingey and Fourth streets; and now I've gotten my mitts on them. Above is an overhead shot of the Waterfront Park, showing not only the various landmarks planned for this stretch along the Anacostia, but also perhaps a first peek or two at designs for some of the later-phase buildings to the north of the 5.8-acre park. I've also now got dusk-time renderings for the brown-and-white Pattern Shop Lofts apartment building and the retail-to-be Boilermaker Shop. All three of these projects should open in 2009 (though the park's piers and retail pavilions will be happening in future phases).
129 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7



Near Southeast DC Home Page
Top of Page | RSS Feed | Contact JD
Advertise on JDLand.com

© Copyright 2014 JD.
All photos © Copyright JD unless otherwise marked - See information on photo uses, licensing and purchasing.

  
More JDLand.com/Near SE DC:
JDLand Home Page
Contact JD | About
Advertise on JDLand
E-Mail Updates
Near SE Development Map
Live Transit Info
Upcoming Events
Knight-Batten Award
Photo and Blog Archives
Browse/Search Photos
Photo Galleries
Demolished Buildings
Photos from Rooftops
JD's Favorite Photos
Blog Archive, '03 - Present
Tag Cloud
Underway
  
Nationals Park
Food Options Map
Parking Lots Map
Other Transportation Info
In the Pipeline
 
Completed
Lumber Shed ('13)
Boilermaker Shops ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 NJ Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Dem. ('07)
400 M ('07)
SoCap Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Rearview Mirror
Rearview Blog Posts
Demolished Buildings
Historic Photos & Maps
Past Events Timeline
On the Hill, '59-'69
From Above, '49-'08
Gas Prices Gallery
Posts on Food/Fun
Retail News
Restaurants/Nightlife
Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Ave.
M Street
South Capitol St.
North of M
The Yards
Lower 8th Street
East M Street
Boathouse Row
Guides/Maps
Project Directory
Stadium Corridor
M Street
New Jersey Ave.
Near Southeast Datasets
Recent Data
Crime Incidents
Public Space Permits
Building Permits