Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Yards Park
See JDLand's Yards Park Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


136 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 14
Search JDLand Blog Posts by Date or Category

It's more than six months away, but the second phase of the Waterfront Park at the Yards is now scheduled for a Zoning Commission SEFC Overlay District Review on March 2, 2009 (after having briefly been scheduled for Nov. 17, 2008). It's in this review that we'll see the plans for the renovation of the Lumber Shed into a glass-walled retail building, plus the designs for two new two-story retail pavilions connected to the shed's east side. There will also be the first look at the proposed "public art tower" that Forest City is wanting to build right on the waterfront at Third Street.
You can see early designs for the three retail buildings (and the position of the art tower, if not the design itself) in the rendering on my Yards Park page, right at the center, and of course plenty of photos of what the area currently looks like.
One other project at the Yards park that is just starting to pop up on the radar is a new "main campus building" for Living Classrooms of the National Capital Region, to be located on the far eastern edge of the park (just off the right edge of the rendering), along the waterfront just before the park meets the Navy Yard. Living Classrooms is a non-profit group that "uses maritime settings, community revitalization projects and other challenging learning environments" to provide hands-on education and job skills training for students (especially at-risk youth). They will be handling the design and management of the new environmental center at Kingman Island further up the Anacostia, and currently operate out of Building 74 at the Yards (the little brick building--to be townhouses someday--just west of Hull Street at M, seen here). And, according to their web site, Living Classrooms has been "asked to oversee and manage marina and some waterside activities" at the new Yards park.
There is no timeline for when Living Classrooms' new building will get underway. It's currently in the design phase (see an early rendering here), and when that's completed, there will be a fundraising drive to finance the project.
Comments (0)
More posts: Retail, The Yards, Yards Park, zoning
 

The skies were threatening during my visit, so these aren't the most shimmering photos, but I do now have a big batch of new photos from the areas along the Anacostia River that by the end of next year should be transformed into the nearly six-acre Waterfront Park at the Yards. Right now it's mainly a lot of dirt, so I suggest spending some time looking closely at the rendering at the top of the page to orient yourself to the locations of the various photos and what the vistas should eventually look like. (The map at the top of my main Yards overview page is helpful, too.) I also got some photos inside the Lumber Storage Shed, that oddly terra cotta-colored building near the water's edge which will be having its corregated tin exterior stripped and replaced with glass as it's turned into a retail pavilion.
I've also posted some additional photos in the archive at spots where intersections will exist later this year when River and Water streets are created and when Fourth and Fifth are extended down toward the water. (Again, look at the map.) Really, these photos are nothing more than placeholders, but I just had to have the "befores" in order to be able to enjoy the "afters" someday....
(And don't miss my photos posted a few days ago of the interior of the Boilermaker Shop and of the latest progress on the Pattern Shop Lofts building.)
 

Not that there's probably anybody left in town (*tap* *tap* -- is this thing on?), but just in case, here's a few items before I downshift into low-posting holiday mode over the weekend and into next week:
* My Ballpark and Beyond column in today's Post covers some of the latest news on retail (i.e., banks) I've posted here over the past few weeks (Wachovia at 20 M, SunTrust at 100 M, plans for 900 M). There's also a blurb on the month-old news of the zoning approvals for the Waterfront Park at the Yards. The column normally appears in just the District Extra, but If you live in Prince George's County, you got a crack at it this week as they snuck it in on page 11 of the P.G. Extra, too. But note that we're scaling way back on how often the column will appear (probably just monthly from now on) since the news isn't flowing as fast and furious-ly as it was last year.
* No one's invited me to the roof of any of the sparkly new Near Southeast buildings to watch the fireworks. I'll say it: I'm miffed. I do and I do and I do for you people, and this is the thanks I get.... [/sarcastic martyr mode off]
* I've tinkered again with the big homepage map, trying to have it make a little more sense. I've added checkmarks for the completed projects, and turned the list of projects down the left side (marked on the map with boxes) into only ones that are under construction or ones which the developers have done an especially good job of making me believe they'll start soon. The rest of the map is a whole lot of stars marking proposed projects. And they're all color-coded to differentiate between office, residential, and recreational/retail.
My real desire is to completely redesign the homepage, but I haven't had any inspirations come to me yet. Although, in the meantime, I've added another three random before-and-after photo pairings down on the bottom right of the homepage (after you do a lot of scrolling), just to fill some space. I also expanded my Neighborhood Blogs list of links.
Happy 4th, everyone!
Comments (0)
More posts: 900m, Retail, The Yards, Yards Park, zoning
 

I've been coveting electronic versions of the newer twilight-styled renderings of upcoming Yards projects, which have been taunting me from the fence drapings along Tingey and Fourth streets; and now I've gotten my mitts on them. Above is an overhead shot of the Waterfront Park, showing not only the various landmarks planned for this stretch along the Anacostia, but also perhaps a first peek or two at designs for some of the later-phase buildings to the north of the 5.8-acre park. I've also now got dusk-time renderings for the brown-and-white Pattern Shop Lofts apartment building and the retail-to-be Boilermaker Shop. All three of these projects should open in 2009 (though the park's piers and retail pavilions will be happening in future phases).
 

There was a big pile of news this past week from Near Southeast, so I'll boil it down to bullet points and links in case you couldn't keep up:
* Construction is really about to begin on the first townhouses at Capitol Quarter, now that financing has been closed for the public housing units;
* The first phase of the waterfront park at The Yards got the thumbs up from the Zoning Commission, and is expected to be completed by summer 2009;
* Onyx on First will be opening its first five floors of apartments in late July or early August, and initial rents have been announced;
* 100 M will be substantially completed in November, and tenants should start moving into the office building early in 2009. SunTrust Bank is the first retail tenant, and the developer is looking for restaurants for the other spaces;
* The planned office building at 250 M got Zoning Commission approval for a modification to its design; and
* Street vendors will start popping up for ballgames north of M Street on Tuesday (June 3). You can see the map of where they'll be.
 

In what chair Anthony Hood remarked might have been the Zoning Commission's first-ever landscape architecture-only case, the Zoning Commission on Thursday night approved the design for the first phase of the waterfront park at The Yards, the nearly 6-acre green space along the Anacostia River on the site of the once walled-off Southeast Federal Center. My project page has a number of the renderings that were displayed during the presentation, and additional descriptions of what's planned for the site can be found in these two blog entries.
Representatives of Forest City said that they are committed to opening the first phase of the park in the summer of 2009. The second phase, which will include the renovation of the Lumber Storage Shed and the construction of other retail pavilions and buildings, is expected to come before the Zoning Commission this fall. Phase 3 will be the piers and marinas. Somewhat surprising was the news that the floating boardwalk connecting the Great Lawn on the western side of the park to Diamond Teague Park and the ballpark is now going to be built by the city as part of the construction of Teague rather than by Forest City as part of this park.
Much of the discussion by the zoning commissioners (that I saw--I watched from home in my fuzzy slippers and the webcast went wonky a few times in the middle) centered around the pedestrian bridge that runs across the bulkhead and the new freshwater canal. Its very "forward" design---described by Commissioner Etherly as an "aggressive architectural play" and by vice chair Jeffries as a "Slinky," a moniker that I'm sure the developers would probably prefer to not catch on--was not met with universal acclaim. The commissioners did seem recognize its intended role as a piece of art and one of the iconic elements of the park. Jeffries emphasized--and others agreed--that because the designs for the buildings and for the "art tower" are coming at a later date, the bridge is setting the stage for the rest of the architecture at the park, and that the future designs must play off what the bridge has started.
Peter May did not like the bridge (though I missed a lot of his comments because of the webcast problems). He expressed a worry that the bridge, along with the not-yet-designed art tower and whatever's planned for Poplar Point, could create a series of "Look at Me" moments along the Anacostia, all trying to compete for attention. "The 'Look at Me' moment for a waterfront park should be the river itself," he said.
There were also discussions of the lighting plans, and concerns as to whether or not the bridge has a railing (it does). Jeffries asked a lot about the vegetation planned for the different sections of the park, and expressed a wish for some landscaping that is a bit more "wild" in nature, to which Forest City seemed receptive.
There were letters of support from ANC 6D, which voted 7-0 on May 12 to approve the plans, as well as from the Deputy Mayor for Planning and Economic Development and the National Capital Planning Commission, which approved the park's design back in February. So, in the end, the commission decided to go ahead and vote for approval of the plans immediately, although the issuance of the final order is subject to the commission receiving some new renderings showing more clearly the railing on the bridge. The vote was 4-0-1, with commissioner Turnbull not present.
Comments (0)
More posts: ANC News, Retail, The Yards, Yards Park, zoning
 

There's two Near Southeast projects with hearings in front of the Zoning Commission this week:
* On Wednesday (5/28) the ZC will hear the request to extend the height of the office building planned for 250 M Street. I've written about this here, and you can read the Office of Planning's final report for much more detail on the request (and see the latest design). OP recommends approval of what is technically a modification to the Capper/Carrollsburg second-stage PUD (yes, this office building is part of the Capper redevelopment). After initially refusing to vote on the plan because of a lack of community benefits, ANC 6D voted 3-3 on it at its May meeting, which means there will be no support from the ANC. (I wasn't at this meeting, so I can't give you the specifics of what the developer offered to the ANC, or why the resolution didn't pass.) It's possible that 250 M will begin construction this year, but there's no confirmation of that.
* The next night (Thursday 5/29) the ZC will undertake a Southeast Federal Center Zoning Overlay District Review for the first-phase plans of the 5.5-acre waterfront park at The Yards. This design was approved by the National Capital Planning Commission back in February (with some suggestions for refining the pedestrian bridge that is one of the focal points of the design). The Office of Planning report for Thursday's hearing gives a lot of good detail on the plans for the park, as does my original entry from when the design was unveiled. OP supports the design for the park, while also hoping for refinements to the bridge and noting that there should be additional bike racks. You can all sorts of cool renderings of the plans on my Yards Park project page. The first phase of the park is expected to be finished by the end of 2009; subsequent phases, which will include piers and retail pavilions, will come later.
Comments (0)
More posts: 250 M/New DDOT HQ, The Yards, Yards Park, zoning
 

The agenda for Monday's ANC 6D meeting has been sent around (although not posted on their web site, sigh), and it has a couple of Near Southeast items. There will be a presentation on the plans for the Waterfront Park at The Yards, in advance of a May 29 Southeast Federal Center Overlay District Review covering new structures that will be built to house retail pavilions at the park. There's also apparently a public space permit application from the Onyx folks at 1100 First Street for a fence along L Street, plus garden masonry piers and light fixtures. And the developers of the 250 M Street office building are back again, after having not gotten very far at last month's meeting with their request for support for a second-stage PUD modification at a May 28 zoning hearing to increase the building's height (but not its square footage) from what was originally approved, since the commissioners wanted a new round of community benefits in return for their support, which W.C. Smith balked at given that the project isn't requesting to take any new amount of public space. We'll see if there were any negotiations since then. The meeting will be at 7 pm at St. Augustine's church at 6th and M streets, SW.
Comments (0)
More posts: 250 M/New DDOT HQ, ANC News, M Street, The Yards, Yards Park, zoning
 

With the ballpark now humming along like it's been here forever (Tom Boswell has a litany of good things to say in today's Post) , interest is starting to turn toward what sort of retail/restaurant options are going to come to the neighborhood, and when. For your Friday time-killing pleasure, I've tossed together a quick a survey of what's either available now or will be coming within the next two years. (I'm not including already existing retail; I'm just looking at where new stuff could arrive.) As of now, I've seen no announcements of tenants for any of these spaces, but maybe if residents, workers, and ballpark fans clap their hands and wish real hard....
* 20 M - Completed in March of 2007, its 11,000 sq-ft of ground-floor retail space would seem to be an enticing location (just across the street from the Navy Yard subway station's ballpark exit), but so far there's been no takers. "Coming soon" signs that were in the windows last year for Wachovia and Kinko's are now gone.
* Capitol Hill Tower - A 7,000-sq-ft restaurant space in the ground floor of this co-op building has been advertised ever since the building opened in 2006, but no takers so far.
* 100 M - The 240,000-square-foot office building at First and M is scheduled to be completed later this year, and they're offering 8,500 sq ft of "corner restaurant/retail space" with "great ceiling heights, storefront and outdoor seating." (There's no ground-floor retail planned for Onyx on First in the same block.)
* 55 M - The first part of Monument's Half Street project is this 275,000-sq-ft office building now under construction at Half and M (it's the building on top of the subway station entrance). It has over 10,000 sq ft of retail spaces on Half, M, and Cushing, and should be completed by mid-2009. (See retail spaces 1 through 4 on this page at the official web site.)
* 909 New Jersey - For the folks who choose to walk from the Capitol South Metro station, the under-construction residential building at New Jersey and K is going to have 6,000 sq ft of ground-floor retail space when it's completed in summer 2009.
* Velocity - The ground floor of this 200-unit condo building at First and L will have retail (I can't find how much), and will be finished by late 2009.
* The Yards - By the end of 2009, the renovation of the old Boilermaker Shop at Third and Tingey into a 46,000-sq-ft retail space should be completed, and there is also 10,000 square feet of ground-floor retail space planned for the Pattern Shop Lofts building on the south side of Tingey, which should have its conversion into a rental building completed by the end of next year as well. Both of these are situated on the route that most Nats Express users walk along to get from the shuttle stop at 300 M to the ballpark. (But will the Nats Express run after this year?)
* Half Street Part 2 - The southern part of the east side of Half Street north of the ballpark is going to be a combination of a 200-room hotel and two residential buildings totaling 340 units, with about 40,000-sq-ft of ground floor retail to entice the throngs that walk along Half Street before and after games. (See retail spaces 5 through 8 on this page at the official web site.)
* 1015 Half - Opus East hasn't yet committed to whether there will be ground-floor retail in this 410,000-sq-ft office building at Half and L, though about 10,000 sq ft of space will be there.
* 23 I - If this 420-unit apartment building does indeed begin construction in September of this year, there could be 15,000 sq ft of retail available at Half and I by the end of 2010.
That's about 200,000 square feet of space to be filled within the next few years--and this doesn't include the retail spaces in the ground floor of the baseball stadium along First Street (who knows when those will be occupied). It's possible other buildings slated to have ground-floor retail could pop up between now and the end of 2010--1111 New Jersey and 250 M are the main candidates.
And there will also could be more offerings at the Yards by 2011 (including that grocery store planned for 401 M as well as the Lumber Storage Shed and other to-be-built pavilions at the Waterfront Park). And maybe the first building at Florida Rock, across from the ballpark's grand staircase, could be done by the end of 2011. But this is getting a little too far down the road....
 

A few days ago I promised to post some updated photos I'd taken in The Yards, which I'm finally getting to. (Been sick as a dog for more than week now, which I blame squarely on Mother Nature's poor performance during the first games at the ballpark.) They're not exactly barnburner photos, since they're mostly shots of either newly paved parking lots or scads of dirt waiting to be turned into something. But, follow the icon for new images of the Boilermaker Shop (above), the Waterfront Park, and the Pattern Shop Lofts, all of which are scheduled to open in 2009.
I've also added additional photos to the archive, at "intersections" that don't actually exist just yet, but provide additional views of what's happened so far: 1 1/2 Half at N (where the old GPO building was--seriously, it's going to be called "1 1/2 Street"); Second at Tingey and Second at Water (which will become real intersections when Second is eventually built south of Tingey and Water Street becomes a new road north of the park); and Third and Tingey (which will become more of an intersection when Third Street is extended one block south, to the new Water Street). See the map to get a clearer idea of what I'm babbling about. And eventually I'll take some new photos from the Fourth Street side, too.
 
136 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 14
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.