Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Arris/Parcel N/Yards
See JDLand's Arris/Parcel N/Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


33 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

The skyline is definitely going to be changing in the coming weeks at 4th and Tingey and at 7th and L, as the residential projects Arris and the Lofts at Capitol Quarter are now peeking up from behind the construction fences.
You can see the first floor along Water Street, which is the south end of Arris, Forest City's 327-unit apartment building at the Yards--and here's What It Shall Be from the same angle (albeit overhead):
In other words, get ready for that block to look and feel really different when the building is completed, probably in early 2016. And yes, there's ground-floor retail--about 20,000 square feet of it.
Meanwhile, the Lofts at Capitol Quarter, the 195-unit mixed-income apartment building at 7th and L is on quite a hill, so the west end (left) is starting at ground level while the east end (right) is just now coming out of the ground. And these two photos, which don't make it easy to discern exactly what's going on with the construction, do at least give an indication of the length of the building.
Both my Arris and Lofts at CQ project pages have more photos, renderings, etc.
Also, I hope everyone enjoys the Lofts photos taken from Nats Lot W, because when I left there and walked across M at Hull to take pictures TO THE NORTH of the construction TO THE NORTH, a Navy Yard guard approached me and asked to see my photos, to ensure that I was up to nothing nefarious. This even though I had never pointed my camera anywhere close to the direction of the Navy Yard gate--I had even very theatrically held up my camera with its lens clearly pointing in the opposite direction as I crossed M--and even if I had taken photos of the gate, I was on public property the entire time.
"We have to ask, ma'am," he said; "No, you don't," I replied, so really it's a wonder I didn't end up getting thrown into the back of a Suburban and detained. But there's always next time--I told him that they'd better get used to me being there. At least this time they didn't call the DC cops and have one chase me down a few blocks away like they did a few years back.
#PhotographyIsNotaCrime
Comments (3)
More posts: Development News, photos, Arris/Parcel N/Yards
 

As a public service, I bring you the latest views behind some neighborhood fences. And on some neighborhood fences. And even behind some glass.
In fact, there's so many fence-related photos of note that I've broken up all this fence news into multiple posts, so that you don't miss a single fence-related factoid.
(All photos can be enlarged by clicking on them)
Let's begin along L Street west of 7th, where concrete is sprouting for the Lofts at Capitol Quarter, the 195-unit mixed-income building being built by the DC Housing Authority on the older Capper Seniors site.
The footprint is on a decent-sized hill, so what's two levels underground on the project's east end is more or less ground-level at the west end.

Over at Arris, the 325-unit residential building along 4th Street south of Tingey in the Yards, there's an awful lot of square footage to build up, but progress toward ground level is being made.

And the showiest construction these days is the Hampton Inn on the northwest corner of 1st and N. It's even visible now from certain spots inside the ballpark, and here takes up a good chunk of the view northward from Nats Parking Garage C.
(The "Go Nat's" signage has brought much mocking on Twitter from the Apostrophe Police, and hopefully that will be rectified before long.)
Next up: Site work that is (and isn't) happening behind neighborhood fences.
Comments (0)
More posts: hamptoninn, The Bixby, photos, Arris/Parcel N/Yards
 

These are all items I had hoped to write about more fully, but at this point I'd better just pass them along.
* FLORIDA ROCK: MRP Realty is now in control of the land at the Florida Rock site that will become the 350-unit apartment building that is the first phase of RiverFront on the Anacostia. A $65 million loan is expected to be finalized soon, and the developers say that the project will "commence construction by late summer 2014." (WBJ)
* BEVY OF PERMITS: If you browse the teeny type in the right margin of the JDLand home page, you'll already know that building permits have been approved in the past few weeks for the apartment projects at 1111 New Jersey and 1331 4th Street (aka Parcel N at the Yards, aka Arris). A tenant layout permit has also been approved for CBS Radio's first-floor performance studio at 1015 Half Street. Also, fresh off its zoning approvals, developers of the Homewood Suites at 50 M have filed for shoring/sheeting/excavation permits.
* LATEST ON 1333 M: Late last year plans were filed with the Zoning Commission for a three-building, 673-unit residential project on M Street east of the 11th Street Bridges. After some delay, a Dec. 1 hearing date has been set, and WBJ takes a look at recent filings, including some new renderings.
* THE YARDS, ONE PIECE AT A TIME: "Rather than purchase all 42 acres up front, Forest City buys each parcel from the General Services Administration as it is ready to build. The latest: The $28.37 million acquisition of 1331 Fourth St. SE, site of the 327-unit Arris apartment project." Total land costs so far across the Yards? $46 million. (WBJ)
* TUNNEL LATEST: With a council hearing about the project coming on Aug. 26, the Federal Highway Administration has postponed its final decision on the Virginia Avenue Tunnel until at least Sept. 15. But the delay is affecting residents and businesses. (WaPo)
* SCHOOL BOUNDARIES: The planned reopening of Van Ness Elementary next year passes another milestone, as its boundaries get included in the city's revamped map, released earlier this week. The final boundaries cross into Southwest south of M Street, shifting some students over to Van Ness from Amidon-Bowen, "to better align school building capacity with population and with boundary participation rates, and to support racial/ethnic and socioeconomic diversity, where possible." (WaPo)
 

I mentioned this the other day in reporting on the new oyster bar coming to the Lumber Shed next year, but in case people didn't read to the end of that post (gasp!), I'll pass along that the 327-unit apartment building under construction at 4th and Tingey in the Yards finally has a name: Arris. And a new web site, though there isn't much there as of now.
The project is now beginning its vertical construction, and is expected to be completed in late 2015. It will also have 20,000 square feet of ground-floor retail.
The above rendering is the angle from 4th and Water, looking to the northwest. The shorter side of the building is the one that will face the Foundry Lofts, with the taller half facing 4th. Additional renderings are on my now-Arris project page.
Comments (10)
More posts: Development News, Arris/Parcel N/Yards
 

Today Forest City Washington is announcing another restaurant for the Lumber Shed at the Yards Park--the Navy Yard Oyster Company, a "wine-centric oyster bar," will be coming to the south side of the building, between Osteria Morini and Agua 301, with a target opening date of Spring 2015.
The venture is from August Paro and Elias Hengst, founders of Beuchert's Saloon and Sonoma Restaurant and Wine Bar on Capitol Hill.
The menu will feature oysters from Rappahannock and the Chesapeake Bay, along with other well-known oysteries. There will also be an "extensive by-the-glass wine list," and classic cocktails "featuring selections from the burgeoning local distiller movement." Ditto the beer menu. There will be lunch, dinner, and weekend brunch service.
The restaurant will occupy 1,887 square feet on the ground floor, but its two-story ceiling will be the exposed trusses of the Shed's roof. The announcement describes the expected ambiance as "low key, laid back elegance," but is also inspired by the building's ties to the Navy, the city, and the river.
The ownership group, in addition to Paro and Hengst, has members who have been involved in various ways in other local restaurants such as Tryst, The Diner, Mendocino Grill, and the upcoming Stanton.
There is now only one remaining restaurant unit available in the Shed, on the northwest corner, which may or may not have something in the works.
(Also snuck into the oyster bar announcement is the news that the Parcel N apartment building is going to be called Arris. Plus it gives "early August" as an expected opening date for TaKorean.)
Comments (16)
More posts: Restaurants/Nightlife, Lumber Shed/Yards, oysterbar, takorean, The Yards, Arris/Parcel N/Yards
 

First off, you may have noticed that Saturday was a lovely day. The neighborhood's waterfront was most definitely in use:
Not far away, at the Yards' Parcel N, concrete has appeared in the large hole in the ground (left), meaning that the digging down is almost over, and the rising up should start before too long (its tower crane permit application was approved not too long ago). And in a totally different illustration of progress (right), the sales-trailer-to-be for the River Parc apartment project appears to now be in its proper place.
(I wanted to get a photograph of the outdoor patio signage at the soon-to-arrive Ice Cream Jubilee at the Lumber Shed, but the hordes standing in line on Saturday to get into the Jazz Fest completely blocked the view.)
I recorded the current state of the Florida Rock site across from the ballpark {insert Logan's Run reference here}, because the developers have now filed applications for both sheeting and building permits for the site's first-phase apartment building. This doesn't necessarily mean the project is close to getting started, but it deprives me of my snarky "they haven't even applied for their permits yet" response whenever someone mentions that it might get underway soon.
Finally, I present to you official evidence of the new 11th Street SE exit from the freeway, which I'm doing mainly as a mea culpa for not having gotten over there to photograph the ramp and environs, and to hopefully shame myself into action.
I also deserve additional shaming, or at least parallel shaming, for not yet documenting that the Southeast Freeway signage I have griped about for years has been fixed.
Comments (3)
More posts: Florida Rock, photos, Parc Riverside Apts, Traffic Issues, Arris/Parcel N/Yards
 

Time to check in again on the conscious uncoupling of Building 213 from the rest of the neighborhood.
The 1st Street frontage now has quite a bite taken out of it (om nom nom), and some demolition is also now underway at the corner of New Jersey and Tingey.
A few closeups, from 1st Street on the left and New Jersey on the right:
Meanwhile, three blocks to the east, on the site of the still-as-yet-officially-named-apartment-project-we-are-forced-to-continue-calling Parcel N, there's a fair amount of downward action as well:
(Beta pages here and here, if you want the open-and-airy version of the details.)
And, for the heck of it, here's what the entrance to the Harris Teeter from M just east of 4th is looking like, with the new bite out of the historic brick wall finished:
Comments (1)
More posts: photos, teeter, The Yards, Parcel A/Yards, Arris/Parcel N/Yards
 

Finally, the weather and the calendar cooperated, and I spent Saturday taking a slew of photos around the neighborhood. To whit:
* HAMPTON INN: I can report that dirt is indeed being moved (if not necessary removed) from the site of the Hampton Inn on the northwest corner of 1st and N. This is the L-shaped hotel that will wrap around a planned two-story retail building right on the corner (which is not yet under construction). But, in case you weren't around pre-2008 and want to know what this hotel is "displacing," I give to you a peek at the hotel's N Street and 1st Street frontages in their previous lives:
* YARDS/PARCEL N: Men in hard hats operating heavy equipment are now found on most of the block where Forest City's next residential project is planned, south of Tingey and west of 4th. The new photos aren't really all that interesting other than as another tick on the historical timeline, so how about a shot of what the Parcel N lot looked like in 2004 (right), before any of the work on The Yards began.
* PARC/PARK: Toll Brothers's River Parc apartment building at 1st and K is almost topped out (below left). A couple blocks away, WC Smith's Park Chelsea has reached the halfway point of its vertical construction (below right).
* ST. MATTHEWS: While all sorts of newness is erupting around the neighborhood, there is one farewell worth noting, as St. Matthew's Baptist Church as New Jersey and L has left the neighborhood that had been its home since 1905 and the building that had been its home since 1972. Compare how it looked in 2006 (left) to today (right):
This site is part of the footprint for Donohoe's 1111 New Jersey apartment building, and with a raze permit application filed, this corner will probably be emptied before too many months go by. The church has found temporary quarters in Ft. Washington as it looks for a new permanent home.
 

Cleaning out the pending file:
* DIG IT: The shoring and sheeting permit has now been approved for the residential building currently known by the spiffy moniker of Parcel N at the Yards, which means that the parking lot on the southwest corner of 4th and Tingey should start being dug up any time now (beyond just the DC Water digging up that's been going on for a while). This building will have 327 residential units and 20,000 square feet of ground-floor retail when completed in either late 2015 or early 2016.
* MMMM, BEER: Bluejacket is going to start offering tours of its brewery, beginning Jan. 31. The offerings range from a free tour with one complimentary taste of a Bluejacket brew to a $22 "tasting tour" to the $75 "Beer and Food Experience Tour." See the web site for more details.
* A REVIEW: Alas, the Post's Tom Sietsema did not have particularly good things to say about the food at the Arsenal (but he did like Bluejacket's brewed offerings).
* ANC VACANCY: The Board of Elections has officially certified the vacancy in 6D02 after Ed Kaminski's resignation, and the wheels are now turning for a special election. Petitions may be picked up at the BOE and circulated until Feb. 3, with challenges to those petitions allowed through Feb. 12. If more than one person successfully makes it through the petition process, an election will be held, most likely at 6D's March business meeting. If only one candidate qualifies, that person automatically fills the vacancy. So, if you're itching to be an ANC commissioner and you live in Capitol Hill Tower, or Velocity, or 909 New Jersey, or across the way in the northeastern sections of Southwest, here's your chance.
* SOUTHEAST BLVD: ANC 6B's Brian Flahaven has posted the commission's draft comments on DDOT's initial plans for the rebuild of Barney Circle and Southeast Blvd. Spoiler: "The committee recommended a number of clarifying changes to the comments including the addition of an opening sentence that conveys the commission’s opposition to the design concepts presented to the community on Nov. 21, 2013. The committee also wanted to make it clear that other stakeholders besides DDOT need to be brought into the project discussion."
 

* WC Smith has lined up $87 million in financing for its planned apartment building at 800 New Jersey Ave., better known as the home-to-be of Whole Foods. Construction is expected to start next year, just north of the currently climbing Park Chelsea. (WBJ)
* The old trolley barn known as the Blue Castle at 770 M Street has been put on the market by owners Madison Marquette, who bought it for $25 million in 2007 from Preferred Real Estate Investments, who bought it for $20 million in 2005. (WBJ)
* Forest City held a little shindig at the Yards today to celebrate the official "topping out" of the Twelve12 apartment/Teeter project and also to officially receive the 2013 Urban Open Space Award from the Urban Land Institute for the Yards Park.
The party also celebrated the "groundbreaking" of the Yards's next project, the 325-unit residential building just east of the Foundry Lofts on Parcel N, but until the heavy equipment shows up and starts digging up the existing parking lot on the site, let's just note that the actual work should be getting underway sometime soon. But in the meantime, you can gaze upon the latest rendering of the project (this is looking toward the northwest, up 4th from Water Street).
UPDATE: I also should have mentioned that Forest City is now expecting an official mid-January move of its offices to the 2nd floor of the Lumber Shed (hence the visible work underway up there).
 
33 Posts:
Go to Page: 1 | 2 | 3 | 4