Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Twelve12/Teeter/Yards
See JDLand's Twelve12/Teeter/Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


70 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

I wandered around on Thursday, it was sunny, I had my camera in hand, etc., etc., yadda yadda yadda.
Some items of note (click photos to embiggen):
On your left, hard-to-get evidence of the ongoing work at Bluejacket at the Boilermaker Shops. They've covered up all the eye-level windows, but peeking through the (dirty!) glass above the large door on 4th shows the fermenters now installed on the mezzanine level.
At right, my first viewing of the renovated Team Store at Nationals Park's Center Field Gate.
Below, the Lumber Shed in the sun.
Agua 301's space is to the left, and Osteria Morini's is to the right. (On the ground floor.)
And, everyone's dream come true, a parking garage being born:
Of course, it's actually the parking garage that will be underneath the Harris Teeter in the Twelve12 apartment building at 4th and M, so it's probably allowed. If you want even more photos of rebar and concrete, my Twelve12 page has them.
 

Some quick shots from today of the other projects underway at the Yards, in case a new dry cleaners just isn't exciting enough for you.
The new exterior glass is now almost completely on the Lumber Shed at the Yards Park, where Osteria Morini and Agua 301 are slated to be tenants when it opens later this year (along with Forest City Washington on the second floor):
A before-and-after that can't possibly be resisted:
Facing the Anacostia:
Meanwhile, over at the Twelve12 apartment building project on 4th Street (more popularly known as the Harris Teeter/Vida Fitness building), the progress isn't quite as showy, unless you're a construction nerd and you know what the arrival of a tower crane means:
Yes, it means that vertical construction is not far off. The building is expected to be completed in 2014. And in case you want one more shot of the hole in the ground:
See the project pages for the Lumber Shed and Twelve12 for renderings and additional details.
Comments (16)
More posts: Restaurants/Nightlife, Lumber Shed/Yards, photos, Retail, The Yards, Twelve12/Teeter/Yards
 

It took a loooong time to get past the unconfirmed stage (and even included an oopsie cat-out-of-the-bag last year by some PR folks), but today Forest City Washington is finally officially announcing that Vida Fitness is coming to the south end of the Twelve12 apartment building, now under construction on 4th Street SE between M and Tingey in the Yards.
Also in the 28,000-square-foot facility will be Vida's "affiliated concepts" Bang Salon and Aura Spa, and will also feature Vida's Penthouse Pool Club and Lounge, shown in the above-right drawing and described as a "membership-only urban resort featuring a rooftop pool deck with city and riverfront views and a variety of poolside lounging options and amenities."
Twelve12, when completed in mid-2014, will also be home to the neighborhood's first grocery store, a 50,000-square-foot Harris Teeter located on the north end of the block at 4th and M, in addition to the building's 218 apartments. There is also still 10,000 square feet of as-yet-unleased retail space. It is across the street from the Boilermaker Shops retail pavilion, set to open in early 2013, and kitty corner from both the Foundry Lofts and what will be a new 325ish-unit apartment building on the southwest corner of 4th and Tingey, expected to start construction in 2013.
Comments (9)
More posts: Retail, The Yards, Twelve12/Teeter/Yards
 

Isn't it great that the icky humid cloudy weather of the past few weeks finally broke? Aren't the skies glorious and blue? Does that mean I finally got to get out to take some photos? Why, yes!
First up are new photos from ground level at Canal Park, including the new L Street streetscape and the sculptures:
If you're big on Canal Park, you may also be interested in the many before-and-afters in the Canal Park Expanded Photo Archive, which leads off with the first decent bunch of photos from 2nd Place and L Street since construction started on the park many moons ago and then takes you on a before-and-after walk around the park's perimeter.
And then there's the progress on L Street between 3rd and 4th as the Capitol Quarter townhouse construction continues to wrap up:
I also added a few sunny-day Boilermaker Shop exterior photos and a shot of the hole in the ground at the Twelve12 apartment/Teeter project, because the ones I took on back Gloomy Thursday, when I got to go inside the Boilermaker building, drove me nuts:
External construction has pretty much wrapped up at 200 I/225 Virginia/Old Post Plant/Old Star Plant, especially on the south side of the building, facing Canal Park. There was a ribbon-cutting on Friday for the DC Commission on the Arts and Humanities gallery in the building's new lobby on I Street, but unfortunately I wasn't able to make the event. Hope to get photos inside before too long. In the meantime, you'll just have to look at the outside, and compare it to the White Monolith that it used to be:
If these all aren't enough for you, you can spend some time in the Photo Archive, where you pick the intersection you want to see and then you can see the entire range of photos I've taken for all angles or just the ones of your choice. You may even end up in the Photo Archive without realizing it, if you click on the Click to see all available photos of this location. icon on any of the pages above, which also will give you the full range of photos for that angle. It's pretty much the Near Southeast equivalent of heading down the rabbit hole.
 

When a "suspicious package" alert went out on Twitter this morning about the 1200 block of 4th St. SE and 400 block of Tingey being closed, my Spidey sense tingled a bit, given the recent speculation in comment threads that the halt in digging at the planned 1212 4th St. apartment building/Teeter project at the Yards was because of an "UXO" (unexploded ordnance).
One reader sent me both videos and a series of iPhone photos showing the activity, but it was DCIst that got the money shot: a photo clearly showing a big ole' UXO (oh, heck, let's have fun and call it a bomb). This site is of course part of the old Navy Yard footprint, where all manner of exploding items were manufactured for many years.
Since no one's reported any big BOOMs in the intervening time, the clean-up must have proceeded according to plan. The question is, will there be any more surprises once digging resumes?
UPDATE: Here's WJLA's report on the day's festivities, and then DCist unearthed these two videos of the gun factory from 1952.
UPDATE II: While we're all enjoying being a bit flip about all of this, it is of course a serious business to be doing this excavation with such items laying around. Forest City tells me that the work is being done in accordance with guidelines from the Army's Explosive Ordnance Division, and that indeed over the past several weeks sitework has needed to be stopped temporarily because of the unearthing of "munitions debris." Each time, the police department's bomb squad is called in, who then determine whether the EOD folks from Ft. Belvoir should be called in, as they were today.
Forest City also says that it's anticipated that most buried artifacts and debris are found within the first 10 to 15 feet of soil when excavation, so once they get past that level, they expect the finds will trail off. And, it's not just munitions being found--foundations of several homes that were on site prior to the lot being used by the Navy have been found, as well as a Civil War-era cannon.
But the company does want to emphasize that "public safety and the safety of the site workers are paramount for Forest City, so we will continue to strictly abide by the established practices and involve the qualified technicians whenever and as soon as necessary." This includes having a former Navy munitions expert on site at all times as a "spotter," and using a two-part method when excavating, scooping the dirt from the hole in small quantities and spreading it out to be looked at and cleared before it's then scooped into a truck for removal from the site.
Whether this will impact the timeline for 1212 4th's construction depends on how many stoppages there end up being.
Comments (8)
More posts: The Yards, Twelve12/Teeter/Yards
 

I'm a bit under the weather these days, so I'll go with a minimalist approach of mostly Tweeted items:
* Lost in the digital piles on my digital desktop was the CapBiz tidbit about a Bang Salon being housed in the new Vida Fitness gym that is supposed to be coming to the neighborhood as part of the Yards' Teeter/Residential project on 4th Street. (As for the "at the Navy Yard" description, I'm pretty sure that this project isn't happening inside the walls of the Washington Navy Yard.) Note that Forest City has yet to officially announce Vida as a tenant for the project, though they sure came close a few weeks back.
* If the neighborhood seems locked down on Wednesday, it's probably because of this little get-together at Nats Park.
* Speaking of the stadium, the Nats have launched "Take Back the Park" to try to head off the Philly Fan Invasion for the May 4-6 games.
* The agenda for ANC 6D's next meeting is out, with the only Near Southeast item being "Half Street Shipping Container Fairgrounds Concept," which according to David Garber will be on the Das Bullpen site at Half and M and is something along the lines of this. Looks hipster-riffic! The meeting is Feb. 13 at 7 pm.
* Outside the boundaries updates from SWill: Z-Burger is supposed to be opening over yonder today, and a juvenile facility will be moving into that long low gray building on the west side of South Capitol between M and N.
* DDOT tweeted that the 11th Street Local Bridge "is expected to open in late spring." This is the bridge with the pedestrian/cycling path that will run from 11th Street south of N by the Navy Yard into downtown Anacostia.
 

When last I visited the Foundry Lofts, it was about a month before the first residents moved in. I took a pile of photos, but while model units were furnished, a lot of the shared spaces were still being worked on. So I finally made a return visit this week to see all the finishing touches on the interior courtyard, lobby, community room, etc. And I took one or two photographs, of course.
The leasing office tells me that the 170-unit building is now about 65 percent leased and 40 percent occupied, and construction on the non-retail spaces is not far from 100 percent completion. The four priciest units--the corner penthouses, which were announced with rents in the $4,500 range--are all taken. And the two eateries in the ground floor--Potbelly and Kruba Thai and Sushi--have their building permits and are working toward opening within 90 days.
Also, because I can't walk past the Boilermaker Shops without taking pictures, I added a few new shots to that page, including the panorama at right that I got from one of the Foundry Loft patios.
As if this all isn't exciting enough, here's a first terribly not exciting photo of the excavation underway at the 1212 4th/Teeter site a block east of the Foundry Lofts and across the street from Boilermaker.
Plus, since I had to walk down 4th Street to get to all of this, I snapped some shots of the continuing Capitol Quarter progress at K and L.
Comments (1)
More posts: Boilermaker Shops/Yards, Foundry Lofts/Yards, photos, The Yards, Twelve12/Teeter/Yards
 

There's always a lot of interest in what retail establishments will be coming to the many spaces at The Yards, but developer Forest City Washington is usually pretty good at keeping its cards close to its vest on potential tenants until lease agreements are signed.
But sometimes the PR arms of companies can't help themselves--especially in the Twitterverse--and get a little ahead of the game. At which point (as the Post's Jonathan O'Connell then commented) it's pretty hard to put the toothpaste back in the tube.
So, if you're wanting to know what fitness company will be coming to the retail space at 4th and Tingey (in the same residential/retail development as the Harris Teeter), it's not confirmed to be Vida Fitness. Yet.
Comments (2)
More posts: Retail, The Yards, Twelve12/Teeter/Yards
 

You know how I always like to say that something is expected to happen Any Minute Now? In the case of construction getting started on the southeast corner of 4th and M on the new residential/Teeter/retail building in The Yards, that's now actually a pretty true statement. On Thursday Forest City received the shoring/sheeting permit approval that the project has been waiting for, which will allow the start of digging at the site as soon as some other i's are dotted and t's are crossed.
Also, on Monday night, with almost no discussion, the Zoning Commission approved 5-0 the project's itsy bitsy teeny weeny design modifications discussed recently.
Getting construction started Any Minute Now should allow the Harris Teeter to open in late 2013 or early 2014, if all goes according to plan, though hopefully once the shovels hit the ground, we can get a more detailed timeline as to when the entire project will be finished.
LATE UPDATE: And, just like that, i's have been dotted and t's have been crossed, and Forest City tells me that this project is now considered "commenced."
Comments (3)
More posts: Development News, Harris Teeter, Retail, The Yards, Twelve12/Teeter/Yards
 

On Monday night, ANC 6D gave its support to a series of minor modifications (very minor--did I mention they were minor?) to the previously approved design of the new residential/retail/grocery development planned for the southeast corner of 4th and M, SE.
Because the lease with Harris Teeter has been executed since the project's zoning approvals were received, Forest City needs an okay for the company's signage, which you can see in the updated rendering. An outdoor seating area on 4th Street has also been added, and the design of the residential building's vestibule on 4th has been altered in order to use "structural glass." There were also slight changes to the roof structure, the sunscreens on the residential windows, the design of the trellises shielding the parking deck, and other items that should probably just be read about in the Office of Planning report that supports the proposed changes. (If you want the real nitty gritty of the updated design for this block, you can look through the full submittal to the Office of Zoning.)
Alex Nyhan of Forest City told 6D that he expects excavation on the site to start in about a month, with superstructure work beginning in the spring. This would bring the opening date to late 2013 or early 2014. (The entire block, consisting of the 55,000-square-foot Teeter, 218 apartments, and the as-yet-unnamed health club and other retail spaces at the south end of the site, is being built at the same time.)
There weren't many questions from commissioners. David Garber, who said that this was the first project reviewed by his new 11-member Near Southeast Citizen Development Advisory Committee, did question the project's representatives about the plans for bike parking. (Shocker!) Nyhan said there would be racks on 4th Street, and that they would be working with Harris Teeter to allow bikers to bring their bikes into the store and take them down to the parking level via elevator, but that no biking would be allowed into the parking garage. There was also discussion of whether the entrance to the garage could be expanded to allow for bike racks at street level, but Nyhan said there is not enough room in the design to widen the entrance.
The ANC then voted unanimously to support the project. It will be taken up by the Zoning Commission at its Nov. 28 meeting, having been removed from the Monday night agenda so that the ANC could be allowed to weigh in before the ZC voted.
You can see my Yards Parcel D project page for more details and photos.
 
70 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7