Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Twelve12/Teeter/Yards
See JDLand's Twelve12/Teeter/Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


70 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

With many thanks to Forest City Washington, I've posted a bunch of renderings of the four projects that are on the boards at The Yards in its first phase of development. These came from the submission on the first phase that FC made in advance of its July 12 presentation in front of the National Capital Planning Commission, and while they have some nice drawings of the plans that I've written about in the past for renovating three of the historic buildings at the old Southeast Federal Center, the big news is the first hints of what's planned for "Parcel D", currently a parking lot on the east side of 4th Street south of M: it's to be a residential building the south end of the site and an office building on the north end that would have a grocery store on the ground floor at 4th and M. The drawings also show the additional floors to be added to the brown-and-white Building 160 and imposing red-brick Building 202, both of which have interior atrium/courtyards I never knew about. And there's a few cool renderings of the plans for transforming the very industrial Building 167 that sits right behind the new DOT HQ into retail space. (Plans for the five-acre waterfront park and other areas in the Yards were not part of this submission.)
I didn't get the entire submission, so I'm not knee-deep in details, but everyone should definitely look at these drawings to see what's coming at The Yards. We should be seeing the beginnings of the streetscape improvements Any Minute Now (which include landscaping that barren area on the west side of New Jersey Ave. south of M), but the completion of the Building 167 retail and Building 160 residential won't happen before 2009, and the Parcel D/grocery store project *could* finish in 2010. So don't pack your bags or write your shopping list just yet.
 
70 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7