Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: The Yards
See JDLand's The Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


504 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 51
Search JDLand Blog Posts by Date or Category

(Sorry for short and sweet. My Own Private JDLand, etc. etc.)
* The BID reports that Forest City has announced (I never hear about Forest City things directly anymore) that all-organic, vegan, and gluten-free juice bar and raw-food kitchen The Juice Laundry will be coming to Arris in the spring, its first location outside of its home base in Charlottesville. If you want a sneak preview, there's a pop-up version of the Juice Laundry this weekend at the corner of 4th and Tingey, from 10 am to 6 pm today (Friday, Dec. 2) and tomorrow (Saturday, Dec. 3).
* Barred in DC says that "the long saga for the Bardo River Brewery appears to be over," with Bardo and ABRA having entering into a consent order this week that will finally pave the way for a liquor license. Barred says that the order means that Bardo can be open until midnight, but is "required to create a security plan and maintain a comprehensive security camera system and cannot seek permission to have entertainment, such as live music or DJs." However, an "anonymous" comment on Barred's post disputes these items, and says that Bardo "is still pursuing legal measures due to the delays ABRA's illegal actions caused." Gosh, I wonder who wrote that!
I kind of gave up on following the many twists and turns after last year's liquor license veto, but Barred has posts to catch you up on this new brewery plan.
UPDATE, DEC. 7: The owner of Bardo has been busy on Twitter yesterday and today, making clear his vast displeasure with ABRA and ANC 6D.
 

At 4th and Water Streets, SE, the steel has started popping up for District Winery, the winery/restaurant/events space coming in late 2017 to the Yards.
The official web site is online, along with Facebook, Twitter, and Instagram accounts, though right now the site's links are mainly for how to reserve the events space for your wedding or how to work for the winery.
Here's a few more images, along with recognition that I need to get my act together and create a project page, though in the meantime you can read my previous posts for more info.
Just to the winery's northeast, digging is well underway at Parcel O, where a joint project is underway that will beget a 138-unit condo building by PN Hoffman and a 190-unit rental building by Forest City. There are hints that the condo building will be called The Bower, though PN Hoffman's web site hasn't quite gotten there yet. Completion is expected in 2018.
 

The output of the current official JDLand camera (an eight-year-old Canon 50D with a Sigma 18-200 lens) has been a bit less sharp of late (like me!), and given that the shutter has fired more than 110,000 times since 2008, I have been figuring it's probably time for a new camera. But since I knew I'd also want a new lens as well, I decided to buy that first and see if maybe the far cheaper component was the problem. I finally got the chance to take the new lens for a workout on Sunday, and the ruling after looking at the 730 photos I took is: I need a new camera. (Will probably be the 80D.)
All of that is just a time-wasting intro to a roundup of the progress photos I took.
Dock 79 is getting pretty close to the finish line, with the sidewalk along Potomac Avenue now open and work proceeding on the open plaza to its east. (Yes, those are sculptures.) There's also emerging placeholding signage for The Salt Line in advance of its 2017 opening.
ORE 82 now has some completed balconies overlooking New Jersey Avenue and I Street, but mainly I just wanted the excuse to post my rather striking shot (below left). And speaking of red buildings, the Homewood Suites at 50 M is making steady progress as well.
The walls of windows at 909 Half Street are making for some interesting reflections, not only from the reflected bright blue sky but from the patterns of recesses and bump-outs, as well as the windows that are left open to presumably give the poor workers a little air.
If you stand at New Jersey and M, you can get good views of Insignia on M to your north and the F1rst apartment/Residence Inn hotel project to your west.
Then we have the even newer neighbors, the ones who we can't quite see just yet, although the 1244 South Capitol apartment building now has one floor above ground level. (I admit, this is one I am looking forward to watching rise up.) Then there's the office building at 99 M, which seems to be slooooowly getting ready for vertical construction, though a peek down in the hole indicates that a skeleton is still some weeks away.
I also took photos of the Bixby, but nothing much is changing on the outside there. And I only took morning-light photos, which means I don't have any good ones of Agora, unless you like looking at its backside. (So to speak.)
Then there's Parcel O at the Yards, where one condo and one apartment building are to be built. Fences are up, and there is some infrastructure work going on along with breaking up the concrete pad that the trapeze school stood on until last year. I believe the shoring, sheeting, and excavation permit is approved, but whether the true Digging of the Dirt is underway, well, We Shall See.
There are more new photos than just the ones above--follow the links for additional shots, plus I've also updated a bunch of before-and-after sliders. And maybe soon I'll get out in the afternoon light to get photos of the western side of all of these projects--with a new camera!
(If you're thinking that these photos don't look that blurry, it's really more on the edges of the shots where the problem lies, plus I do some sharpening of all photos after I size them down for posting.)
 

I wrote two posts back in June giving the first details of the plans for "Parcel L" at the Yards, the block west of 3rd and south of Tingey where Forest City is in the early stages of plans for a 270ish-unit apartment building.
Last week the Zoning Commission received the filings for the project, so now there are some additional details about not only Parcel L's residential building, but a few other items percolating nearby.
First, the basics on Parcel L, some of which may or may not be new (what, you think I'm actually going to go back and read what I wrote?):
The plans are for a 110-foot-high building with somewhere between 270 and 285 units, 54ish of which will be set aside for households making up to 50 percent of the Area Median Income.
There will be a little more than 17,000 square feet of ground-floor retail, on the building's southern and eastern sides, facing 3rd Street and the Yards Park.
Two levels of below-grade parking will provide 270 vehicle parking spaces for both the residential building and a planned future hotel on the north end of the block. There will also be 109 long-term bicycling parking spaces in the garage.
Originally the plan was to open to vehicles 2nd Street south of Tingey down to an extension of Water Street, but that has been replaced with the idea of a 2nd Street "mews," helping to create a much more pedestrian friendly approach to the Yards Park from points north and west.
In the rendering below, you can see the apartment building's position on the block with the planned hotel site to its north. What you also see, in the foreground, is Tingey Square, the planned reconfiguration of the intersection of New Jersey, N, and Tingey. The site plan at right shows the Parcel L layout, the 2nd Street position, and Tingey Square. You can also see how then the residential entrance is keyed to the road on the southern side of Tingey Square while the hotel sits on the square's eastern edge.
In honor of all of this additional info, I have now created a Parcel L page, my 10th Yards-related project page. I also added to the main Yards page a spiffy updated Yards development map that was included in the Parcel L zoning filing, with all the parcel markings and whatnot.
Forest City representatives told me in June that the company is looking to get started on the Parcel L apartment building in 2018.
 

The spiffy new Yards Marina, now ready for business, is having its grand opening celebration from 2 to 5 pm this Sunday, June 26.
There will be a slew of activities, including tours of the new space, short boat trips on the Anacostia, live music, games (yes, including corn hole), face painting, circus performers, children's crafts, "Mermaid Story Time," and much more. It is free and open to the public.
The marina has 50 boat slips, a water taxi dock (though no announcement yet as to any new services), and a paddler dock for kayaks and smaller personal boats. Half of the slips are for "long-term, seasonal use" while the others are for stays of 10 days or less. If you want more information on slips (including free "parking" for the grand opening), contact Living Classrooms at 202-488-0627.
Comments (13)
More posts: Events, marina, The Yards, Yards Park
 

I wrote last week that Forest City was making its first steps into the public processes for a new 270-unit residential building on the block along 3rd Street south of Tingey known as Parcel L.
On Monday night, there was an initial presentation to ANC 6D about the project, and some renderings were shown to the assembled masses, shots of which have arrived in JDLand's inbox.
I think there is still some tweaking going on--6D was not asked to approve these specifically and there is as yet no zoning filing--but the general idea of a terraced building that would be a large focal point from the Yards Park just to the south probably won't change.
The top image, obviously, is that Yards Park view. These others are the view looking west on Water Street and then looking southeastward from Tingey Street.
Note that this building would not front Tingey Street--there are eventual plans for a hotel to be built along Tingey to the north of the residential project.
Forest City told me last week that a 2019 completion date is the target for this Parcel L project.
As for what used to stand on this site, the old Southeast Federal Center Building 159 was in residence until about 2000, long enough for me to remember it but not long enough to have photographed it with the JDLand camera. (Waaaaaaah!) However, a few years back I did uncover this photo, taken in about 1992, as part of the Library of Congress's Carol M. Highsmith archive. Building 159 is the white building directly between the DC Water Main Pumping Station and what's now the Foundry Lofts building. (You can also see two low red brick buildings fronting M Street next to Spooky Building 213 that I also didn't get to photograph, along with a little red brick annex on the north side of the still-empty Building 170 at 3rd and Tingey.) If you want to see more photos of the neighborhood taken from above in the early 1990s, check them out.
 

The grapevine informs me that Forest City is moving forward with plans for a new residential building on "Parcel L," the site at the Yards along 3rd Street south of Tingey between DC Water and the Foundry Lofts where a parking lot currently sits.
It would have 270 rental units and two levels of underground parking, and currently has a targeted completion date of 2019 (which just isn't as far away as it used to be).
No renderings are available for public (or blogger) consumption, but my understanding is that it has a "terraced" design, and will be a U-shaped building with a courtyard that opens southward toward the Yards Park and the river. There will be retail along 3rd Street, but I don't know the exact amount.
Also, it should be noted that for the very north end of this parcel, along Tingey, there are also plans to have a "boutique" hotel, but there's no time frame for that.
Forest City is on the agenda for next Monday's ANC 6D meeting to give an initial presentation on the residential plans, in advance of heading off to Zoning Land later in the year.
This is not the only Yards residential project in the near-term pipeline, as the condo and apartment projects two blocks east on "Parcel O" at 4th Street are expected to begin construction in coming months. These projects would join the lineup of already completed Yards residential buildings Foundry Lofts, Twelve12, and Arris. It's also expected that there will be additional residential buildings along 1st Street SE near the planned movie theater.
 

In the wake of what is clearly a very successful venture at the Lumber Shed, there are apparently now early-stage plans for "Due South Dockside," to be housed in two of the "bays" along the Anacostia Riverwalk near the pedestrian bridge in Yards Park.
Due South owner Bo Blair tells me that there will be a "streamlined menu of Due South's best items," along with frozen drinks, beers, and wines and a kids menu (presumably not including beers and wines).
An April 2017 opening date is being targeted. But I will note that there is apparently not yet a completed agreement with Forest City, as an inquiry to them about the plans was greeted with the standard statement about the company not commenting on any potential deals until a lease is signed.
The early plans were presented to ANC 6D's ABC committee earlier this week, and my understanding is that the committee voted to support a liquor license for the project.
 

It's been rainy for so long that I forgot that I should actually go out and take photos when the sun is shining. So this morning I went for a quick visit to the Yards to finally get photos of the latest arrivals and soon-to-be-arrivals.
First, there's Philz Coffee on Tingey Street, which already looks to be a popular addition to the neighborhood. (I'll leave it to folks who actually partake of this particular beverage to speak to the coffee itself.) The Conte's Bike Shop pop-up is next door through this weekend, though its permanent space will be around the corner on 4th Street when it opens in 2017.
Next I pressed my camera up against the windows at Whaley's, in advance of what I hope is a visit that involves actual eating before too much longer. (There's also this shot that better shows the high ceiling of the space.)
The Yards Park Marina is said to be opening in June, and the entrance to the slips is looking pretty close to ready. These three shots are a pseudo-panorama, showing the view from the entrance to the east (with a big hole in the horizon where the Barry should be), straight ahead down the ramp where vessels such as water taxis will be able to dock, and to the west. (The large gates will lock.) There will be 50 slips all told.
I did not take any photos of the other "news" in the Yards today, of some initial site work underway at the Parcel O site on the southeast corner of 4th and Tingey. Don't look for a big hole to open up just yet, though.
I also took what might be a final "before" shot of the lot at 4th and Water where construction is expected to start in coming weeks on the District Winery building.
But, dang it! I forgot to wander over to Spooky Park to check out the final landscaping touches! This mission was a failure!
 

Conte's Bike Shop, a bicycling retailer with nine Virginia locations, will be opening a full-service operation at Arris at the Yards in early 2017, it's being announced today.
But if you can't wait that long, Conte's will be running a 10-day pop-up version in one of Arri's open retail spaces on Tingey Street starting Thursday, May 19 through May 29th, opening on Thursday through Sunday during each of those two weeks. This means that the store will be open during both Bike to Work Day on Friday, May 20 and Tour de Fat at the Yards on Saturday, May 21.
This pop-up version will have bikes for sale or rent, repair services, clothing, gear, and "expert advice."
The permanent Conte's location will be 2,200 square feet in size, located in the 4th Street portion of Arris's ground floor.
Conte's was founded in 1957 in Newport News, and is apparently still a family-owned operation, with locations in Arlington and Falls Church in addition to elsewhere in Virginia.
The press release from Forest City also says:
"Their shops carry a full line of bikes and accessories including hybrids, mountains, cruisers and road bikes by leading brands including Giant/Liv, Eddy Merckx, BMC, Scott and more, as well as offering gear, accessories clothing and lots of expert advice. They also offer a trade-in policy and used equipment for sale. What’s more, Conte’s Bike Shop prides itself on being a community center and resource for the cycling community, offering events, clinics, structured rides and online resources."
 
504 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 51
Search JDLand Blog Posts by Date or Category