Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: The Yards
See JDLand's The Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


504 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 51
Search JDLand Blog Posts by Date or Category

Just some things that didn't make it to the blog during the outage:
* MORE GROUND BROKEN: I had posted a photo last week of the new fence at not-Ballpark Square but wasn't quite ready to say that construction had started. However, the pile driver has arrived, and steel beams are already sticking out of the ground, so I think it's now safe to add the residential/hotel portion of the project to the ludicrous lineup of developments currently underway. (The office component at 99 M is expected to get started before long as well.) It's also the fourth to break ground just within the past month or so, joining residential projects 909 Half and 82 I and the Homewood Suites hotel at 50 M. And I think that's probably it for major projects getting started until the end of this year or early next year.
* BONCHON GETTING CLOSER: The paper is off the windows, so I was able to see where things stand at Bonchon--and it's looking well along. (Not pictured are the five or so boxes containing large flat-panel TVs.)
* DEMO PERMIT APPS: Applications have been submitted to demolish two buildings on the DC Water site--a 50,000-square-foot brick building and a 1,980-square-foot wood shed. Whether these are on the footprint of the planned movie theater/accompanying residential, I cannot tell you.
* SPRING! SPRING! There's now quite the inventory of outdoor tables at Willie's Brew & Que, and work is underway for a patio at the Big Stick (photo by Mr. JDLand):
* MORE ABOUT FOOD: I mentioned it in passing before, but there's been enough tweets sent my way to mention again that work has now started at the Scarlet Oak space at 909 New Jersey. And there's purty window ads now, to both get their name out there and to THWART my PEEKING. And closer to the river, at the Lumber Shed, both Due South and the Navy Yard Oyster Company have gotten their building permits.
With all that cleared out of the hopper, I now may be a bit scarce for the rest of the week. Hopefully the site will behave, though.
 

For those who missed out on my interim Facebook blogging on Monday....
The designs for two new buildings coming to the current Trapeze School site at the Yards (known in the parlance as Parcel O) are going before the National Capital Planning Commission in April for an early "35% design review."
One is the 140ish-unit condo building being planned by PN Hoffman. It will front Tingey Street between 4th and a newly (re-)built 5th Street. Its design echoes the brick+glass look that Arris will have when it is completed. It will be the first condo project within the Yards.
Immediately to its south will be a two-towered 190ish-unit rental building to be developed by Forest City. There will be 16,700 square feet of ground-floor retail across both buildings, along with 246 below-grade parking spaces, and in addition to the return of 5th Street there will also be a one-block extension of Water Street along the block's southern side.
Both developers are looking to begin construction late this year or early next year.
In honor of now having renderings, I created a Parcel O project page--and while putting it together, I found the photo at right, showing the corner of 5th and Tingey from May, 2004, back when there was a 5th Street (such as it was). This view matches the rendering at far right in the row of three.
As for the Trapeze School, it will be moving later this year to the southeastern portion of Spooky Park, at the corner of New Jersey and Tingey.
 

* MARATHON: The Rock n Roll Marathon is on Saturday (March 14). Near Southeast gets off easy compared to some neighborhoods, but watch for closures, runners, tie-ups, etc., along South Capitol Street and the Douglass Bridge (plus over into Buzzard Point and also in Anacostia Park) until early afternoon. Full map here. In short: get thee to the Southeast Freeway or the 11th Street Bridges if you wish to escape by vehicle.
* CLOVER FEST: If you're not navigating around distance runners on Saturday morning, you may be dodging wobbly attendees from this year's Clover Fest beer tasting festival at 1st and N SE during the afternoon and evening.
* MONTADITOS BANKRUPTCY: "The Florida operator of the Spanish mini-sandwich chain 100 Montaditos has filed for chapter 11 bankruptcy protection in U.S. Bankruptcy Court in Miami." Bankruptcy filings were also submitted for nine of the chain's restaurants in south Florida and the Arlington, Va., location. No word on whether it has any impact on the Tingey Street location. (Miami Herald)
* BLUEJACKET OPENING DAY FEST: Bluejacket is having an Opening Day Fest on Monday, April 6. Free to enter, but there's also a food/drink package option.
* TRUCKEROO: The 2015 Truckeroo schedule is out, starting April 24. (Yes, the Fairgrounds/Bullpen is going to remain open this year.)
* THREE BEDROOMS: I wrote back in October about the Yards West zoning hearing where this all first percolated, but GGW has taken a look at the notion of incentives for three-bedroom apartments. Then City Paper's Housing Complex blog tackled the subject as well.
 

Everybody enjoying their snow day? (Except for those of you who work for places that don't close, like, say, daily newspapers.) This was a nice little snow, but I remain spoiled by the ghost of 2009-10, the winter that this snow lover will always remember. (This Nats Park shot is from Feb. 7, 2010, in between the two mammoth snowstorms. It was a pretty different neighborhood that I traisped around in getting photos....)
On to the tidbits:
* SNOW CANCELLATIONS: The BID's Mardi Gras celebration planned for today has been cancelled (except for beads still being handed out), and the Van Ness Elementary fundraiser at Nando's has been rescheduled for March 24. (But the latter gives me an excuse to mention that I have finally built a Van Ness project page!)
* SNOW CANCELLATIONS/CSX: Today was supposed to be the hearing on the Committee of 100's move for an injunction to prevent CSX from moving forward on the Virginia Avenue Tunnel until the lawsuit itself is heard, but Mother Nature has forced a postponement, to a date to be determined. But you can still read the Post's preview piece on the hearing.
* TRAPEZE SCHOOL MOVE: It had started to seem like the Trapeze School's long-planned move to the southwest corner of Spooky Park at New Jersey and Tingey wasn't necessarily a given, but HillNow reports that the school has now confirmed the move, likely to happen this fall. In the meantime, there's a zoning case to be heared in March to allow them to stay in their current spot during this year, while their new home is prepped.
* SECURITY THEATER: The photo of construction outside the Nats Park centerfield gate at right that I posted a few weeks back brought much speculation, but it's now confirmed that the work was/is to install magnetometers (WaPo).
* CHANGE AT WILLIE'S: Eater DC reports that both chef Rock Harper and his brother/general manager Ed Howard have left Willie's Brew & Que. No hints on why.
* THE GLOBAL REACH OF SNARK: Technically off-topic, but I learned last week that tossing out snarky comments on Twitter can sometimes have a reach beyond just my followers. (See paragraph #5.) Thank heavens I spelled "artisanal" correctly.
 

If you spend much time on 4th Street in the Yards, you can be forgiven for looking at the concrete skeleton rising up next to the Foundry Lofts and assuming that Forest City's Arris is going to just be another boxy DC apartment building.
And that is more or less true--for the five floors that have been built.
But there's for the next six floors, there's going to be a shift, as the design--by Robert A.M. Stern Architects--turns into a very angled, wavy, and even slightly off-centered ultra-modern offering. It's going to look like a glass tower was plopped not-altogether-carefully on top of a rectangular brick low-rise offering.
Look closely at the renderings (click to enlarge), which both show the building from Water Street, and compare them to the above photo, counting the floors already constructed to confirm that along 4th Street the construction is about to look very un-rectangular:
On the building's west side, next to the Foundry Lofts, there will be no glass top, but instead three eight-story mini-towers, with two private courtyards. It's not quite so easy to get photos that clearly show the "reverse-E" outline of the west side, but I did at least try.
The from-above rendering also gives a good view of the rooftop "amenities deck" on the glass tower.
One thing not readily apparently in the drawings is how much taller this building is going to be than anything nearby. So, get ready for a veeeeeery different skyline in the coming weeks.
Arris has 20,000 square feet of retail on three sides of the building's ground floor, facing 4th, Tingey, and Water streets, and the building is scheduled to open late this year or early next year.
There's more drawings and photos on my project page, including some "before" shots of the building's footprint that emphasize how much this block has changed, even before work started on Arris.
Comments (8)
More posts: Development News, photos, The Yards, Arris/Parcel N/Yards
 

Thankfully my camera shutter does not seize up in cold weather, because I spent more than two hours on Saturday wandering the neighborhood* to catch up on all of the latest doings, of which there are so many these days.
I looked at The Brig.
I looked at a few other spots that you'll hear about soon.
Unsurprisingly, I also looked up.
And what a sky to look up at.
(Just ignore all those dust artifacts marring the magnificent blue. Time to buy my own sensor cleaning kit.)
I looked up at the Hampton Inn at 1st and N, which now has most of its windows and appears to be about to get its facing. Maybe it looks a smidge less like a grain elevator now.
Then I looked up at the VIDA Fitness complex at Twelve12, originally to document the new Bang Salon and Penthouse Pool Club signs, but how I could resist yet another shot of the VIDA sign when I saw this?
I've mentioned the Banfield Pet Hospital sign before, but seeing it there reminds me that a reader passed along a Banfield tweet from early January saying that Banfield would be opening Feb. 7. Keep an eye peeled for the removal of the window coverings....
And finally, we have the Park Chelsea, which remains thisclose to getting its masonry completed, with the second photo included mainly to give me an excuse to sneak in a shot of the scaffolded Capitol dome.
If you like photos of vertical construction against a deep blue sky, stay tuned.
* But, hey, 11,000 steps!
 

If you haven't yet ventured into the non-workout portions of the VIDA Fitness complex at Twelve12 at the Yards (or even if you have!), both Aura Spa and Bang Salon are hosting a grand opening celebration on Wednesday, January 21 from 6 to 8 pm.
Champagne, wine and light hors d’oeuvres will be served. Aura Spa will be offering complimentary lip or brow waxing (quantities limited) along with special pricing on massages and facials ($99 for 60 minute treatments). At Bang Salon, stylists will provide personal hair consultations, and guests will receive courtesy gift bags in addition to "fun swag" that will be raffled off.
They're asking that guests RSVP their attendance to ksimmons@vidafitness.com. The entrance to both spots is through the VIDA doors on Tingey Street east of 4th.
Comments (0)
More posts: auraspa, bangsalon, Events, vida, The Yards, Twelve12/Teeter/Yards
 

Cold enough for ya?
Looking to do something to pass the time while it's cold?
Want to be even colder?
Want to have fun while being cold?
Want to do stuff to warm up while being cold?
If you're 21 or older and answered "Why, yes!" to any of the above questions, head down to the Yards Park on Saturday, Jan. 17 for Ice Yards, billed as the "ice version" of the big Splash Yards party last summer.
With a "ski chalet vibe," the shindig will run from 2 to 6 pm and is slated to have ice bars, a "frosty beer garden," a DJ, live music, a "ski lounge," fire pits, hot tubs, "Absolut Snow Cones" (SOLD!), and interactive winter-themed video games.
The forecast for Saturday currently calls for a bit of a warm-up, to around 45 degrees, but if that temperature was cold enough to hold the NHL Winter Classic, I'm sure it'll be fine for a party.
It's free, but give them an RSVP at EventBrite or on Facebook if you think you're going (1,800 of your closest friends have already clicked "Yes").
Comments (10)
More posts: Events, The Yards, Yards Park
 

Cleaning out the tidbit hopper with some new and not-quite-so-new items of note. I imagine posting will be light in the next few days, but you never know.
And so a Happy Holidays to all, from the entire staff of JDLand.com! Including from George, pictured at right.
* MOVIE THEATER LATEST: I mentioned this on Twitter last week, and appended it to my post on the subject, but I've heard kvetching from certain quarters that I did not specifically post anew that last week the DC Council passed the emergency versions of bills that among other things declare portions of the DC Water site at 1st and O as "surplus." This will allow the process of Forest City developing its movie theater there to move forward another step.
* VAN NESS KINDERGARTEN: I have been embarrassingly slow to report that earlier this month DCPS made known its decision that Van Ness Elementary will open next year with two kindergarten classes (in addition to PK-3 and PK-4). There will be 15 out-of-bounds spaces in these classes. The school system also released this FAQ about Van Ness's opening if you are just catching up.
* 100 M STREET SOLD: GlobeSt.com reports that Lionstone Investments and Hermes Real Estate have purchased the 100 M Street SE office building, with a source "pinpointing the purchase price at $78.9 million, or $324 per square foot." The building originally went up for sale back in 2012. This is the Gordon Biersch building, for those of you who don't look at address signs.
* METRO BALLGAME USE: WMATA's "PlanItMetro" blog took a deep dive into ridership patterns on Nationals game days at the Navy Yard-Ballpark and Capitol South stations. "Carrying an average of 11,000 riders to every Nationals home game, Metrorail maintained a 34% mode share to Nationals park in the 2014 season." There's also a good discussion of what the numbers may mean in the comments of this Greater Greater Washington post (along with chit-chat about the new Southeast Blvd.).
 

I could blather on in some kind of forced introduction about how the weatherman sold my camera and me a bill of goods this weekend ("mostly sunny," eh?), and how the low sun and weak light and wispy clouds made for less-than-stellar images, but instead let's just jump in.
We'll start with the photo at right, which shockingly reveals that dirt is actually being moved on the northwest corner of 8th and L, where the beer garden now known as The Brig has been planned for such a long time. Clearly work is in the very early stages, but that's a nice change from no progress at all. It's supposed to open in the spring.
Continuing the tour....
Digging continues at the 1111 New Jersey apartment project (above left), with the shoring at far left helping to give a sense of how far down they've gotten so far. (Spoiler: they have a long ways left to go.) And at the Capper Community Center Building House (above right), the foundation on the south end of the site along L Street is now a pretty sizeable structure.
It's hard to get a decent shot of the Lofts at Capitol Quarter construction, because the building is so long, though the wide open space of Nats Lot W helps. Vertical construction continues at the far east end, at 7th Street, while the western end waits its turn. Here's a big version of the latest image, to make it easier to see. (But remember, you can click on all photos to pop up larger versions.)
From there I wandered to the Yards (after rejoicing that the Hull Street Gate to the Navy Yard was closed, so I was able to take photos of the Lofts construction without hassle). The Arris apartment building is now getting its second floor, from south to north, as seen in the below left shot from the corner of 4th and Water. And a different sort of progress is visible a few feet away, in the windows of the northwest corner of the Lumber Shed.
Not pictured is the lunch stop I made at 100 Montaditos, mainly to watch Mr. JDLand's continued march through the menu.
Meanwhile, the Hampton Inn at 1st and N (above left) continues to stand all but alone (I find myself thinking of it as Near Southeast's grain elevator). I also think I managed to capture a construction milestone when I spied its first installed windows. And, up at New Jersey and I, the Masonry Marathon continues at the Park Chelsea (above right), though it does look like that phase may not last too much longer.
There's one other batch of progress photos I took on Saturday, but you're just going to have to wait a bit longer for those.
 
504 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 51
Search JDLand Blog Posts by Date or Category