Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: The Yards
See JDLand's The Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


504 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 51
Search JDLand Blog Posts by Date or Category

I have not laid eyes myself, but multiple sources in my inbox and elsewhere are breathlessly reporting a new sign on the sidewalk at 4th and M SE saying simply "Harris Teeter Opening November 5." (This post now UPDATED with a photo of the sign, retrieved by my own personal stringer.)
To say this is a long time coming is an understatement -- it was five years ago, in Sept. 2009, when the first official reports of Teeter coming to The Yards surfaced, and even then, I referred to it as "long-rumored." In 2010 the building at 4th and M with the planned grocery store space changed from office to residential.
It was in June 2011 that developer Forest City finally confirmed that the grocery store space in what was now called Twelve12 would in fact be a Harris Teeter. Work on the site began in early 2012, and now, with a little bit of 2014 left, here we are.
Almost.
Comments (7)
More posts: teeter, The Yards, Twelve12/Teeter/Yards
 

A tweet late this morning from Richie Poe, general manager of the VIDA Fitness complex at the Yards:
"It is with pride, accomplishment and tears of joy that I can finally announce @VidaFitnessDC Yards opens today at 12noon. "
And now the press release has arrived, saying that VIDA and its Aura Spa and Penthouse Pool Club have indeed officially opened today, with Bang Salon following tomorrow, Oct. 2. (And don't forget Bang's Cut-a-Thon on Sunday for Ovarian Cancer.)
I got my tour before all the equipment was placed, but I'm sure you can poke your head in the front door on Tingey Street and sneak a peek. The Post got a tour as well.
This leaves the Harris Teeter and the not-yet-officially-announced-but-totally-Banfield Pet Hospital as the Twelve12 tenants yet to open. Last word was that Teeter is shooting for an opening in early November.
Comments (2)
More posts: vida, The Yards, Twelve12/Teeter/Yards
 

The Capitol Riverfront BID is announcing plans to host a "Washington Nationals Celebration" in Yards Park for the Nats' first two playoff games, on Friday Oct. 3 and Saturday, Oct. 4. These events will feature "favorite local bands, broadcasting from CBS Radio, and family-friendly activities to celebrate the Washington Nationals' home stand during the first round of the National League Division Series postseason playoffs."
On Friday, the festivities will be held post-game, where a not-yet-named local band will play on the boardwalk while food trucks and the nearby restaurants will offer eats for your picnicking pleasure. (The start time for Friday's game will not be known until after Wednesday's NL Wild Card game, but it is expected to be either 12:07 pm or 3:07 pm.)
On Saturday, the Natitude will start in Yards Park at 3 pm, "with a pre-game concert by fan favorite Hand Painted Swinger, family-friendly activities such as face painting, and broadcasting from CBS Radio personalities with Nationals-focused commentary and interviews." (And don't forget to walk the Riverwalk to the 1st Base Gate!)
All this is free and open to the public.
UPDATE: Since this just arrived in my inbox, I'll add that the Fairgrounds is offering "viewing parties" for all home playoff games on their 16x16 oudoor big screen, with full audio.
 

Having gotten out of the way the vertical construction going on behind neighborhood fences, we can now move on to the "clearing" portion of this fence survey.
The roof of Nats Parking Garage C gives a great view of Yards Parcel A, and how far the site clearing has come along since the final days of Spooky Building 213.
Next up will be the creation of a park on the far end of the site, a parking lot in the corner closest to this intersection, and the new home for Trapeze School New York at far right. (Here's a map if that's too many words.)

Meanwhile, along New Jersey Avenue....
(Left) This isn't my best work, but you can compare the rubble in this photo to the lush grass-covered hill that used to run along New Jersey Avenue between L and M. All this dirt is being moved to build the 324-unit Gallery at Capitol Riverfront residential building, aka 1111 New Jersey Avenue.
(Right) Up in Whole Foods land at 800 New Jersey Avenue, the hole is still being dug. But the new block of H Street between New Jersey and 2nd is looking like a real street, though no doubt it will continue to taunt us by remaining closed throughout the construction of 800 NJ, like its sibling I Street a block to the south has sat unopened, waiting for the Park Chelsea construction to finish.

Next, do you like construction trailers? How about construction trailers on sites where work isn't yet underway?
(Left) Here's the Capper Community Center site at 5th and K, where a ceremonial groundbreaking a few weeks back was not quite enough to jolt the project into action.
(Right) Looking down upon the vast Florida Rock footprint from the ballpark, and noting the new construction trailer visible at the far end. As I mentioned a few days ago, there's not as yet been an announcement of construction financing for the planned first-phase 350-unit apartment building, nor are the initial necessary building permits approved.
 

As a public service, I bring you the latest views behind some neighborhood fences. And on some neighborhood fences. And even behind some glass.
In fact, there's so many fence-related photos of note that I've broken up all this fence news into multiple posts, so that you don't miss a single fence-related factoid.
(All photos can be enlarged by clicking on them)
Let's begin along L Street west of 7th, where concrete is sprouting for the Lofts at Capitol Quarter, the 195-unit mixed-income building being built by the DC Housing Authority on the older Capper Seniors site.
The footprint is on a decent-sized hill, so what's two levels underground on the project's east end is more or less ground-level at the west end.

Over at Arris, the 325-unit residential building along 4th Street south of Tingey in the Yards, there's an awful lot of square footage to build up, but progress toward ground level is being made.

And the showiest construction these days is the Hampton Inn on the northwest corner of 1st and N. It's even visible now from certain spots inside the ballpark, and here takes up a good chunk of the view northward from Nats Parking Garage C.
(The "Go Nat's" signage has brought much mocking on Twitter from the Apostrophe Police, and hopefully that will be rectified before long.)
Next up: Site work that is (and isn't) happening behind neighborhood fences.
 

* VET HOSPITAL PERMITTED: An approved building permit made it through the pipeline on Thursday for the "construction of a new pet veterinary boarding hospital and vet uses" at Twelve12 in the Yards. There has as yet been no official announcement from Forest City as to the name of the operator, but this new retail offering was telegraphed thanks to some necessary zoning reworkings earlier this year. Look for a lot of pet traffic along Tingey Street between this store and the still-as-yet-not-officially-announced Unleashed by Petco that got its building permit for a space in the Boilermaker Shops earlier this month.
UPDATE: A reader reports that promotional signage on Half Street by Nats Park showing the neighborhood's offerings does let the cat out of the bag, that it's going to be a Banfield Pet Hospital.
* CLASSIC UNVEILED: The publicity machine for the NHL Winter Classic at Nats Park on Jan. 1 is beginning to ramp up, with the official announcement (finally) of the game, alongside the unveiling of the Capitals' throwback jerseys, which begat lots of photos of somewhat uncomfortable looking hockey players at the ballpark. There was also the cool outline of where the rink will be set up.
* RAMP REOPENED: This week saw the reopening of the new-ish ramp from 11th Street SE to the westbound SE Freeway/I-695. It had been closed down in June to allow for demolition of the old flyover exit ramp from the inbound freeway to I Street SE. And some day I will actually get over there again to check it all out.
* TRAILER PARKED: A few readers have passed along the news that a construction trailer has appeared within the past week or so on the Florida Rock site along the Anacostia River just south of the ballpark. While plans are to get underway Any Minute Now on the first-phase 350-unit apartment building at the site's eastern end, next to Diamond Teague Park and Piers, there's not yet been any news that the construction financing has been finalized, nor is there as yet an approved shoring/sheeting/excavation permit. But the time does appear to be drawing nigh that development of this 5.8-acre parcel will finally get underway, at which point people will shift from complaining about the empty lot right across from the ballpark to complaining about a tall building ruining the views of the river.
 

While Bang Salon in the VIDA Fitness spread at the Yards is still a few days away from its slated opening date of Sept. 30 (fingers crossed), the operators already have in the works a "Cut-a-Thon" on Sunday, Oct. 5, from 9 am to 9 pm in support of ovarian cancer education and awareness.
For 12 hours, 100 percent of the proceeds from every haircut will be donated to the National Ovarian Cancer Coalition. If going to a salon is stressful, the complimentary champagne and small appetizers may serve to soothe you.
More than 20,000 women in the United States are diagnosed with ovarian cancer each year, but because of the disease's somewhat vague symptoms and a lack of reliable detection tests, most cases do not get diagnosed until the cancer has reached later stages--approximately 15,000 women die annually from the disease.
So if you're getting a little shaggy, see if you can hang on for an extra week or so and contribute to the cause. It's easier than pouring an ice bucket over your head.
(Note that this is only for getting your hairs cut [as Mom used to say], not coloring or other chemical services.)
UPDATE: Following up on reader JES's question in the comments, Bang is taking taking walk-ins for this event on Oct. 5 but appointments are suggested--appointments can be made online at bangsalon.com or (202) 628-3222.
 

It's still a few weeks from opening, but today my camera was taken on a tour of the mammoth VIDA Fitness space on the northeast corner of 4th and Tingey, including the Bang Salon, Aura Spa, and Penthouse Pool Club offerings. (Does walking through four floors and 30,000 square feet of a fitness center count as a workout?)
I've put a pile of photos in this gallery as a narrated walking tour, so that you can see spots like the "experiential cycling studio" with a virtual reality wall, the "inner fitness" room (with its own HVAC system to allow for hot yoga and rapid cooling afterward), the locker rooms, the pool deck, and much more--you'll just need to pardon their dust as they race toward an opening probably in the first week in October.
The VIDA web site has much more information on all the offerings, which also will include a Kids Zone for babysitting while Mom and Dad sweat. I was told that VIDA expects to have about 900 memberships within the next few weeks--and pre-opening membership rates are still available. (There's also 50 on-site parking spaces, though be sure to appreciate the irony of driving to the gym.)
Here's a couple of shots, but check out the full gallery.
Meanwhile, just up the street, in the same Twelve12 complex, the Harris Teeter is looking very spiffy with its signage--but alas is seeing its own opening date slip, probably to early November.
Comments (2)
More posts: Retail, teeter, vida, The Yards, Twelve12/Teeter/Yards
 

A reader pointed me today to a new Facebook page for Willie's Brew and Que, the long-delayed sports bar that was first announced as coming to the Boilermaker Shops back in 2011.
It's been a busy day on the page, with a new logo posted ("Willie's, Est. 2014") as well as photos of the interior, including shots of the point of sale kiosks with the caption "Computers almost up and running!" There's no news there of an opening date, but the About page is well filled out with details. (The WilliesBBQ Twitter feed is silent so far, however.)
Certainly with October baseball looking staggeringly likely, it would behoove any restaurant or bar in the neighborhood to rush preparations to completion in order to capitalize on hordes of wild-eyed Nats fans converging on the area. However, the long delay in building out the space, followed by the bankruptcy and associated falderal surrounding owner Barracks Row Entertainment earlier this year, have made it easy to be skeptical that the restaurant would actually ever open.
So, keep an eye on the western end of the Boilermaker Shops (at the corner of 3rd and Tingey) to see if white smoke from barbeque equipment signals the arrival of a new restaurant.
 

These are all items I had hoped to write about more fully, but at this point I'd better just pass them along.
* FLORIDA ROCK: MRP Realty is now in control of the land at the Florida Rock site that will become the 350-unit apartment building that is the first phase of RiverFront on the Anacostia. A $65 million loan is expected to be finalized soon, and the developers say that the project will "commence construction by late summer 2014." (WBJ)
* BEVY OF PERMITS: If you browse the teeny type in the right margin of the JDLand home page, you'll already know that building permits have been approved in the past few weeks for the apartment projects at 1111 New Jersey and 1331 4th Street (aka Parcel N at the Yards, aka Arris). A tenant layout permit has also been approved for CBS Radio's first-floor performance studio at 1015 Half Street. Also, fresh off its zoning approvals, developers of the Homewood Suites at 50 M have filed for shoring/sheeting/excavation permits.
* LATEST ON 1333 M: Late last year plans were filed with the Zoning Commission for a three-building, 673-unit residential project on M Street east of the 11th Street Bridges. After some delay, a Dec. 1 hearing date has been set, and WBJ takes a look at recent filings, including some new renderings.
* THE YARDS, ONE PIECE AT A TIME: "Rather than purchase all 42 acres up front, Forest City buys each parcel from the General Services Administration as it is ready to build. The latest: The $28.37 million acquisition of 1331 Fourth St. SE, site of the 327-unit Arris apartment project." Total land costs so far across the Yards? $46 million. (WBJ)
* TUNNEL LATEST: With a council hearing about the project coming on Aug. 26, the Federal Highway Administration has postponed its final decision on the Virginia Avenue Tunnel until at least Sept. 15. But the delay is affecting residents and businesses. (WaPo)
* SCHOOL BOUNDARIES: The planned reopening of Van Ness Elementary next year passes another milestone, as its boundaries get included in the city's revamped map, released earlier this week. The final boundaries cross into Southwest south of M Street, shifting some students over to Van Ness from Amidon-Bowen, "to better align school building capacity with population and with boundary participation rates, and to support racial/ethnic and socioeconomic diversity, where possible." (WaPo)
 
504 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 51
Search JDLand Blog Posts by Date or Category