Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: DC Water (WASA)
See JDLand's DC Water (WASA) Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


68 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

On Nov. 6, the city council passed the final version of Bill 17-0159, which creates a new Southeast Water and Sewer Improvement Benefit District, where landowners will be subject to a special assessment to fund $12.45 million in upgrades already underway to the water and sewer infrastructure under streets near Nationals Park.
To be lazy, I'll quote my own description of the bill, from a post back in July: "It was decided to take care of these upgrades now because the streets that the pipes lie under--South Capitol, Potomac, First, N, and I--are scheduled to be reconstructed in the coming months as part of the streetscape improvement project before the Nationals ballpark opens, and it was thought best to take care of the sewer work now rather than having to dig up newly renovated streets. Landowners (including the city and the U.S. government) would be assessed based on total land area and the gross building area as allowed by zoning for each parcel of land that abuts or benefits from the improvements, and would be able to pay their assessment either in an up-front lump sum or over time."
The specifics are all laid out in the bill (which was passed with an amendment-in-the-nature-of-a-substitute that rewrote the bill's original language), but if you're one of the landowners in this assessment area, I'm guessing you have high-priced attorneys who you're paying to sort out exactly this kind of stuff for you, so I'll gleefully refrain from going into any greater detail.
The infrastructure work on these streets is expected to continue until February, in concert with the streetscape improvements being done at the same time (new curbs, sidewalks, streetlamps, etc.).
More posts: DC Water (WASA)
 

From the Post: "Raw sewage is flowing into the Anacostia River from a leak in a major sewer line that carries untreated waste from a pumping station in Southeast Washington, D.C. Water and Sewer Authority officials said last night. [...] The cause of the leak was not immediately known. It was discovered when workers repairing part of the riverbank spotted water churning nearby. Tests showed that sewage probably was flowing out of a buried line somewhere between the O Street pumping station and the riverbank." They'll first try to bypass the pipe (seven feet below water), which could be done today, and then work on repairing it. As for any health concerns: "Dunn said that the leak near the O Street station does not pose a threat to public health, noting that more untreated sewage flows into the river on rainy days, when runoff overwhelms the city's sewer system and treatment capacity." Lovely. City Paper has excerpts from the WASA media advisory on the leak. And yes, this is the WASA operation just across First Street from the ballpark.
UPDATE: I should note that in 2005 and 2006 there was extensive interior and exterior rehabilitation work done to the 1905 Beaux Arts Main Pumping Station building, plans for which went through the city and federal bureaucracy before I became the source material addict that I am today. So here's the February 2005 National Capital Planning Commission executive action on the rehabilitation plans. The repointing of the exterior masonry and the repair of damaged windows, doors, and building cornice was why the building was under a white tarp in early 2006.
UPDATE II: The Associated Press is reporting: "The sewage leak into the Anacostia River has been stopped. DC's Water and Sewer Authority set up a bypass pump system to stop the sewage from reaching the river."
More posts: DC Water (WASA)
 

With the area in the stadium corridor between South Capitol and First streets apparently in need of significant upgrades to its water and sewer infrastructure, the city council is working on a bill that would create a special assessment to fund the $15.45 million needed for the improvements. It was decided to take care of these upgrades now because the streets that the pipes lie under--South Capitol, Potomac, First, N, and I--are scheduled to be reconstructed in the coming months as part of the streetscape improvement project before the Nationals ballpark opens, and it was thought best to take care of the sewer work now rather than having to dig up newly renovated streets. Landowners (including the city and the U.S. government) would be assessed based on total land area and the gross building area as allowed by zoning for each parcel of land that abuts or benefits from the improvements, and would be able to pay their assessment either in an up-front lump sum or over time. With the city contributing $3 million toward the project up front and another $4.1 million to cover the assessments on public properties, the other landowners will end up funding $8.35 million of the project cost.
The bill was marked up on July 13, and apparently has changed somewhat, but you can read the original version of the legislation here. When the committee report is finalized and the revised bill is available, I'll post them as well.
It should be noted that the water and sewer improvements for the stadium itself have already been taken care of, and similar improvements for The Yards and Capper/Carrollsburg will be handled through their PILOT funding programs.
More posts: Capper, South Capitol St., Nationals Park, DC Water (WASA), The Yards
 

From an Anacostia Waterfront Corporation press release (not yet posted on their web site): "JBG Companies will present $4 million to help fund neighborhood improvements in the Near Southeast neighborhood, including Washington Canal Park and Diamond Teague Park, at a ceremonial event scheduled for Monday, April 30, 2007 at 11:00 am. The ceremony will take place at the planned site for Washington Canal Park, located at the corner of 2nd and M Streets, SE. Participants in the check presentation ceremony will include District Mayor Adrian Fenty, Deputy Mayor for Planning and Economic Development and AWC Interim President and CEO Neil O. Albert, Ward 6 Councilmember Tommy Wells, At-Large Councilmember Kwame Brown, Chair of the Committee on Economic Development, and Ben Jacobs, President of JBG Companies, who will present a ceremonial check to District officials and AWC. JBG Companies, developer of the new U.S. Department of Transportation headquarters building on M Street, SE, is contributing $2.5 million toward development of Washington Canal Park and $1.5 million toward the development of Diamond Teague Park." And, this additional bit of info about Diamond Teague Park: "The park is being completed in a partnership arrangement with surrounding land owners for area-wide benefit and use. The park's first phase will incorporate interim improvements to include a ferry landing [emphasis mine] and esplanade. Future improvements will include connecting the Ballpark District to The Yards (formerly Southeast Federal Center) with the construction of the Anacostia Riverwalk adjacent to the river bank site currently occupied by the DC Water and Sewer Authority (WASA)."

 

A nice pick-me-up on this dreary Monday morning--the Anacostia Waterfront Corporation has unveiled a redesigned web site, and it's certainly more pleasing to the eye. There's a page listing all of their projects, including pages on the South Capitol Waterfront & Ballpark District and Washington Canal Park in Near Southeast as well as the Southwest Waterfront, Poplar Point, Hill East, Kingman Island, and others. One new item from the South Capitol page, that the 40,000-sq-ft public plaza we've started hearing about planned for the foot of First Street at the waterfront will include a new ferry pier. Lots of people interested in the ballpark and Near Southeast in general have been wondering whether ferry/water taxi options would be incorporated, and I had always seen general discussions that they would, but this is the first specific description I've seen for a planned location of such a pier. Yay! (But I'm guessing we won't be seeing it by Opening Day 2008.) For more information (what little I have) on the First Street Plaza, see my Florida Rock page (whose developers have pledged $3.7 million toward the plaza's design and implementation costs, for what is expected to be a $15 million project); my Canal Park page has info and photos on that project as well.
 

The planned 1.1-million-sq-ft Florida Rock development at 1st and Potomac Avenues (across the street from the new Nationals ballpark) had another Zoning Commission hearing last night, to address some of the concerns expressed by the ZC at the first hearing in September, chief among them the design of the east end of the east office building (see map to orient yourself), which commissioners felt disrupted the line of sight to the Anacostia River from the stadium's grand staircase and viewing platforms. This section of the building--which will house a signficant portion of the project's retail offerings--has now been redesigned so that one will be able to see the Earth Conservation Corps pumphouse from the center of the staircase. This eastern end of the development also faces the new planned First Street Plaza, a 40,000-sq-ft public park to be placed at the terminus of First Street, to draw people to the riverfront. Florida Rock is proffering $3.7 million toward the design, construction and maintenance of this park that the Anacostia Waterfront Corporation will develop (total cost estimated to be $15 million). The record is being held open for two more weeks, so look for a vote on the project at the January 8 meeting; I hope to have updated renderings showing the redesigned east building by that point. As for a timeline, Florida Rock estimates that construction on the first phase--the east office building--would begin in early 2008; there has been no announcement from the AWC as to any sort of timeline on the First Street Plaza (which presumably also depends on the acquiring of the WASA land on that site).
 

GlobeSt.com has a brief on MacFarlane Partners, the San Francisco-based real estate investment firm that has fronted 25% of the capital for the development of the Southeast Federal Center (hey, buddy, that's "The Yards" to you!). The article says that "the company plans to make significant investments in the Baseball district" and that "MacFarlane says he expects to announce three mixed-use projects in the area by the end of the year. These will consist of residential, retail and office totaling some $300 million to $400 million. Right now these projects are in the early planning stage, but MacFarlane says that, depending on the density patterns, he expects the projects will cover between one million sf to two million sf." I've seen MacFarlane mentioned recently as part of the group working on Herb Miller's stadium garages plan, but I don't know whether this statement about the three soon-to-be-announced projects would include the garages, or if it includes any part of the SFC/Yards, or if it's partnering with Forest City and Western Development (Herb's company) on the AWC's drive to develop the WASA site, or if it's three completely new projects. I guess we shall see. (Read the GlobeSt brief quick, because they archive after seven days.)
More posts: Anacostia Waterfront Corp., staddis, DC Water (WASA), The Yards
 

I've been meaning to post this for weeks, during a "lull", but since there hasn't been a Near Southeast lull since about August 2004.... If you've noticed over the past months the construction activity around the WASA site (that's "Water and Sewer Authority"), it's because they're in the midst of a $45-million-plus rehab of the Main/O Street pumping stations located there. And, for those baseball fans who've been a bit concerned about having to spend your time sitting a little closer to a sewage plant than perhaps you'd like, I hope that it eases your mind to see that the two bid solicitations for the project both mention "odor control" as part of the projects....
More posts: Nationals Park, DC Water (WASA)
 

The Florida Rock mixed-use project had a second-stage PUD hearing at the DC Zoning Commission on Monday night; I missed the first 90 minutes, so I can't really give you a solid feel for how it all went; I did detect a fair amount of concern about the easternmost building of the project, an office building (now redesigned to include three floors of retail) at the terminus of First Street, specifically how it impacts the views of the river from the "grand staircase" of the ballpark. There were also still apparently some issues to be resolved with DDOT, the Office of Planning, and the AWC's new plan for a 39,000-sq-ft plaza at the foot of First Street. The Florida Rock folks will be back in front of the Commission in November to address the concerns brought forward. One interesting tidbit did sneak in during Adrian Washington's testimony--he said that the plans for the Ballpark District portion of the WASA site (AWC and Forest City are still in negotiations to acquire the land) is for it to be all residential, perhaps as many as 800 units. If that Ballpark Development Strategy ever sees the light of day, we'll get more details, I'm sure.

 

In advance of the Sept. 18 Zoning Hearing, representatives on behalf of the development project at Florida Rock made a presentation to last night's ANC 6D meeting on some changes that they've made to their design after consulting with the Anacostia Waterfront Corporation as the AWC works to create a Ballpark District around the stadium. One big change is a 52,000-sq-ft increase in the amount of retail planned for the site, now pegged at 92,000 sq ft. Much of it will be along Potomac Avenue, facing the stadium, but also in the first three stories of the office building planned for the eastern part of the site, at First Street--it's in this location where the AWC is now envisioning a 39,000 sq ft public plaza, with some of the WASA waterfront land being used for this park (Florida Rock has offered to contribute $3.5 million to the design, development, and initial maintenance of the plaza). It would serve to far better connect the stadium to the Anacostia River, and with the retail there as well, it's hoped it could be a destination that would draw many people down to the southern side of the stadium. Florida Rock has also been able to tweak the design of the western side of their land (which for now is under the old Frederick Douglass Bridge), and will now be able to build a large pedestrian pier sticking out into the Anacostia in that area. They've also been able to "twist" the upper floors of a the buildings to allow for much more open views. Building heights, density, and the 75-ft-deep esplanade along the riverfront all remain the same. In a stunning display of unanimity (for them), the ANC passed a resolution in support of the changes 6-0. I hope to have updated renderings and site maps of the new design within the next few weeks.
 
68 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7