Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: DC Water (WASA)
See JDLand's DC Water (WASA) Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


68 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

The Florida Rock mixed-use project had a second-stage PUD hearing at the DC Zoning Commission on Monday night; I missed the first 90 minutes, so I can't really give you a solid feel for how it all went; I did detect a fair amount of concern about the easternmost building of the project, an office building (now redesigned to include three floors of retail) at the terminus of First Street, specifically how it impacts the views of the river from the "grand staircase" of the ballpark. There were also still apparently some issues to be resolved with DDOT, the Office of Planning, and the AWC's new plan for a 39,000-sq-ft plaza at the foot of First Street. The Florida Rock folks will be back in front of the Commission in November to address the concerns brought forward. One interesting tidbit did sneak in during Adrian Washington's testimony--he said that the plans for the Ballpark District portion of the WASA site (AWC and Forest City are still in negotiations to acquire the land) is for it to be all residential, perhaps as many as 800 units. If that Ballpark Development Strategy ever sees the light of day, we'll get more details, I'm sure.

 

In advance of the Sept. 18 Zoning Hearing, representatives on behalf of the development project at Florida Rock made a presentation to last night's ANC 6D meeting on some changes that they've made to their design after consulting with the Anacostia Waterfront Corporation as the AWC works to create a Ballpark District around the stadium. One big change is a 52,000-sq-ft increase in the amount of retail planned for the site, now pegged at 92,000 sq ft. Much of it will be along Potomac Avenue, facing the stadium, but also in the first three stories of the office building planned for the eastern part of the site, at First Street--it's in this location where the AWC is now envisioning a 39,000 sq ft public plaza, with some of the WASA waterfront land being used for this park (Florida Rock has offered to contribute $3.5 million to the design, development, and initial maintenance of the plaza). It would serve to far better connect the stadium to the Anacostia River, and with the retail there as well, it's hoped it could be a destination that would draw many people down to the southern side of the stadium. Florida Rock has also been able to tweak the design of the western side of their land (which for now is under the old Frederick Douglass Bridge), and will now be able to build a large pedestrian pier sticking out into the Anacostia in that area. They've also been able to "twist" the upper floors of a the buildings to allow for much more open views. Building heights, density, and the 75-ft-deep esplanade along the riverfront all remain the same. In a stunning display of unanimity (for them), the ANC passed a resolution in support of the changes 6-0. I hope to have updated renderings and site maps of the new design within the next few weeks.
 

Here today, I am righting a wrong that has left me filled with guilt for years--I'm finally adding a page on my site about the Earth Conservation Corps's Old Capitol Pumphouse location, tucked away between Florida Rock and WASA on the edge of the Anacostia River. See the ECC's own web site for more information about what this group does for local youngsters and also for the river. (They certainly will have a front-row seat to the stadium!) And while I was out, I snapped a couple of shots to add to the WASA page as well as the Capper Seniors page, with construction on both #1 and #2 proceeding along. I also updated the Capper Seniors #1 slideshow. Just because.
UPDATE: I got on a slideshow roll this afternoon, and updated and enlarged the three existing ones (DOT, Capper Seniors #1, and Capitol Hill Tower), and then added two more Capitol Hill Tower slide shows, including one of the project's southeast corner, so you can watch the Star Market go from stand-alone to oppressed neighbor. So go play with them.

 

Today the Anacostia Waterfront Corporation named two teams of development companies to "enter into exclusive negotiations" to develop mixed-use projects on two sites in the ballpark district. Forest City Washington (developers of Capper/Carrollsburg and the Southeast Federal Center) and Western Development Corporation (Herbert Miller's company, responsible for Potomac Mills and many other projects) lead one team, and Monument Realty LLC (which has purchased many parcels of land along N and Half Streets) and The Cordish Company LLC (developers deeply involved in the Baltimore Harbor) lead the other. What does this mean? Not as much as it sounds right now--the Forest City/Western team will be negotiating with AWC to develop the 6 acres of excess land at the WASA site on 1st Street, and Monument/Cordish will be negotiating for the 3 acres of WMATA parcels along Half Street. However, at this time AWC does not own either of these properties. The teams will be working together (coordinated by Forest City/Western) to create a Development Strategy for the entire ballpark district, which is due to the AWC in draft by March 15, 2006 and in final version by April 15, 2006. The teams have committed to provide payment to the AWC through a combination of up-front payment, annual base rent, and participation in development profits. UPDATE: Here is the mayor's office press release. UPDATE II: The Post's web site now has its story about the announcement. UPDATE III: And here is the AWC's press release. UPDATE IV: Here is the Baltimore Sun's Cordish-centric story.
 

It's been a busy busy weekend here at the Near Southeast page. To reflect the true boundaries of the area I'm tracking, the map at right has been expanded, to 11th Street to the east and to South Capitol and S Streets in the south. I've also added two new pages to the site: the New South Capitol Street Bridge page, and the Near Southeast East End page, both of which have lots and lots of photos, and links to information about what's happening in those spots. I've also finally made my Navy Yard page more than an afterthought, adding many more pictures (although not so many from inside the Navy Yard walls, I don't want a visit from the Homeland Security folks). I know this makes the map smaller and a bit harder to read, but I also needed to leave some space for when more projects get underway. And, in the midst of all that, I added new photos to many of the existing pages: check out the DOT HQ, Washington Canal Park, Capitol Hill TowerFlorida Rock, and WASA pages to see them. (You'll also find a few new pictures on some other pages, but it'd be embarassing to mention them here when there's only one new photo on a page.)

 

The Anacostia Waterfront Corporation has posted the draft summary of its Ballpark District Urban Development Strategy (PDF). This is an important document that should be read by anyone interested in the development plans around the stadium. It defines the Ballpark District as 60 acres surrounding the baseball stadium site, including the two blocks north of the stadium site, the western portion of the Southeast Federal Center, a few acres of the WASA site, the Florida Rock site, and additional land at the foot of South Capitol Street (currently owned by Douglas Jemal). The document describes its vision for a "vibrant mixed-use waterfront district":

· Shops, and restaurants and entertainment venues along Half Street, First Street and the Anacostia River;
· An engaging pedestrian environment with strong linkages to and along the waterfront;
· Major public gathering spaces along Half Street, at the ballpark, and at the foot of First Street at the river;
· A grand promenade along the Anacostia River and Potomac Avenue;
· Upper-level offices, hotel rooms and housing that create a diverse population of residents, workers and visitors; and
· A state-of-the-art ballpark that contributes to the life and identity of the neighborhood.

In all, the AWC envisions 465,000-785,000 sq ft of retail and restaurant uses, 350,000-1.6 million sq ft of office space; 1,900,000 to 3,600,000 sq ft (1570 to 2980 units) of housing; and 7,000 to 8,000 parking spaces. (We also find out that the traffic circle being planned as the terminus for the new South Capitol Street Bridge will be called "Potomac Circle.")  Vision documents are wonderful things, I look forward to living long enough to see what the reality actually ends up being :-).

 

The DC government is negotiating to purchase five acres of land in the area near the new baseball stadium, reports the Post, to help influence the development in the neighborhood by creating a "ballpark district" with restaurants, stores, and residential units. Two of the acres would come from the DC Water and Sewer Authority's land at 1st and O Streets, with another 3.2 acres to be acquired by taking control of the WMATA (Metro) bus depot and parking lot at Half and M Streets. Developers are already snapping up plenty of parcels in the area (specifically Monument Realty, which is assembling the acreage to build 750,000 sq ft of mixed-use offerings in the block north of the stadium), but by controlling some of the most desirable land (the Metro land on Half Street lies directly along the envisioned "promenade" entrance to the stadium), DC can do more to ensure that the stadium area sees the sort of development the city wants, and that the area is made into an attractive destination even on non-game days. And in other news, the article mentions that the Anacostia Waterfront Corporation is close to unveiling its master plan for the waterfront redevelopment. (It also reminds us again that DC will be tendering their offers to landowners in the stadium footprint "within the next several weeks.")

 
68 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7