Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Van Ness Elementary
See JDLand's Van Ness Elementary Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


35 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4

A few quick items not earth-shattering enough for their own entries:
* The Post reports that there is a group trying to launch a "Congressional Bowl" college football bowl game, where one of the teams would be a service academy, and which would be played at either RFK or Nationals Park. The NCAA should give its answer in May of 2008.
* In a story mentioning the problems being encountered by cities trying to sell municipal bonds because of the "credit crunch" mentions that DC's "A" rating means it is probably going to have to pay a higher interest rate on a $350 million bond issuance next month that will fund, among other things, the rebuilding of the 11th Street Bridges, though the city locked into a low interest rate on the $355 million bond issued last year for the ballpark.
* None of the 24 DC schools proposed for closure in the mayor's plan are in Near Southeast (Van Ness Elementary School closed in 2006), but I'll note that Southwest's Bowen Elementary is on the list, which brings to mind the continued wrangling over the fate of the move of the MPD First District police station off its current location in Southwest to allow for the construction of the new consolidated crime lab. At various times this fall, there has been discussion about 1D moving to a school building in Southwest (after plans to move them to the Post Plant at 225 Virginia Ave. SE fell through) and perhaps Bowen's closure clears the way for this. UPDATE: Oops, I missed that Phil Mendelson is quoted about the Bowen closing in today's Washington Times, wondering whether Bowen was picked to be closed because it needs to be, or because the city wants to put MPD there. (Though I remember hearing talk of either Bowen or Amidon as possible closures long before the MPD question.)
* My Ballpark and Beyond column this week talks about the opening of 400 M (Capper Building #2), the rash of stolen cars, and the ballpark liquor license application.
* One more addition: The DC Sports and Entertainment Commission is asking the city council for more money, says the Post, because its budget will suffer thanks to the move of the Nats from RFK to South Capitol Street, thanks to the loss of the $2 million a year that the Nats were paying to the DCSEC for renting RFK. The team will pay $5.5 million in rent at the new ballpark, but that money will go toward paying off the construction bonds.
 

The DC Housing Authority is having a groundbreaking ceremony on Tuesday (June 26) at 11 am for the first phase of the Capper/Carrollsburg mixed-income townhouses (i.e., Capitol Quarter), at 4th and L by the EYA sales office. This isn't a signal for the actual start of "vertical" construction, though--that won't begin until later this year.
And maybe this makes for a good time to have a refresher on what exactly "Capper/Carrollsburg" is:
In 2001, DC received a $34.9 million Hope VI grant to redevelop the 23-acre 700-unit Capper/Carrollsburg public housing project as a mixed-income development, replacing every one of the low-income units and then adding to them another 700-plus market-rate and workforce-rate rental and ownership units. The redevelopment project is being handled as a joint venture by Forest City Washington, Mid-City Urban LLC, and the Housing Authority.
The townhouse portion of the redevelopment, being marketed by EYA as Capitol Quarter, will have approximately 121 market-rate and 91 "workforce"-rate ownership houses; an additional 65 townhouses will contain 111 subsidized rental units and Section 8 ownership units. The market-rate houses are already being made available for reservations in monthly blocks, with the attendant tent cities popping up at the sales center as hopeful homeowners stake their claims. There was a lottery back in 2006 for the first 20 workforce units; I imagine another will be coming before too long.
Three hundred low-income rental units have already been completed (or are about to be) as part of the new Capper Seniors #1 and Capper Building #2 projects. The rest of the public housing rental units will be included in four mixed-income apartment buildings planned along Canal Park, three on the eastern side of the park between 2nd and 3rd and I and M, and a fourth on the site of the DPW Trash Transfer lot at New Jersey and K. None of these are anticipated to start construction before 2010, so in the meantime, temporary surface parking lots will soon appear on those blocks to help ease the expected Nationals stadium parking crunch.
Additionally, 700,000 sq ft of office space will eventually be built within the Capper redevelopment area; 250 M Street is a 190,000-sq-ft joint venture between William C. Smith and the DC Housing Authority, and although it now has all of its zoning approvals, we just learned a few days ago that Smith is going to wait until the building is 30 percent leased before beginning construction. There will eventually be another 500,000 sq ft of office space developed at 7th and M on the site of the old Capper Seniors building (itself scheduled to be demolished late this year), but with no current timetable for that project a temporary surface parking lot is coming to that site as well. There will also be another 30-45 townhomes built along L Street behind these new office buildings, but those are a long ways off.
Topping it all off, a new 28,000-sq-ft community center is planned at 5th and K, replacing the one demolished earlier this year. It could start construction in 2008, but those plans might change if, say, a developer or the Housing Authority manages to snag from DCPS the Van Ness Elementary School site at 5th and M, which was closed in 2006 and is now administrative space. A new elementary school could be then constructed to serve families as they move into the rebuilt Capper neighborhood, and the community center could be part of the school rather than being a standalone project. But with the changes in the structure of the public schools' governance, who knows when any decision like this could happen, if at all. Just some Sunday morning speculation for you.
(This info has all been available on my Capper overview page, but it's good to get it out front once in a while.)
 

(Apologies for the posting delays, which will continue for about another week) The DC school board has approved the superintendent's plan to close Van Ness Elementary, at 5th and M SE, as part of the plan to shrink the school system's unused space (see the short Post story on the vote). You can read my previous entries on the Van Ness closure here and here.
More posts: Capper, M Street, Van Ness Elementary
 

In what shouldn't be a shock at this point, the superintendent of the DC public schools has recommended that Van Ness Elementary be one of six schools to be closed by August, according to the Post ("D.C. Will Close Six Public Schools"). The 90 students that are currently at Van Ness (in Head Start and special-ed courses) would be moved to Prospect Elementary. The school board will hold public hearings on the plan and take a final vote June 28--you can see the Superintendent's Recommendation Report for more information. But keep in mind, as I mentioned in a previous entry: "However, as school board member Tommy Wells explained, the city won't be selling school properties, and the feeling is very strong that an elementary school must remain in Near Southeast. Given that Van Ness's M Street location could be enticing to developers, it's possible that the city would agree to a swap, to have a new Van Ness built somewhere else in the neighborhood in exchange for a developer getting rights to the 5th and M lot."
More posts: Capper, M Street, Van Ness Elementary
 

Also at the ANC meeting tonight, there was a discussion about the DC Public Schools' upcoming plan to close/repurpose as much as 3 million square feet of school space over the next two years. Van Ness Elementary at 5th and M is unofficially considered to be very high on the list--although it had 400 students a few years ago, with the closing of Capper/Carrollsburg it now services just 30 Headstart Pre-K students and 48 Special Ed students from around the city. However, as school board member Tommy Wells explained, the city won't be selling school properties, and the feeling is very strong that an elementary school must remain in Near Southeast. Given that Van Ness's M Street location could be enticing to developers, it's possible that the city would agree to a swap, to have a new Van Ness built somewhere else in the neighborhood in exchange for a developer getting rights to the 5th and M lot. A plan to identify 1 million square feet of DCPS space that could be closed/repurposed is due to the school board on May 17, after which there will be a 30-day period of public input meetings (there are also public forums on April 18 and 22). For more information, see the DC Board of Education web site, in particular the rightsizing criteria and calendar.
More posts: ANC News, Capper, Van Ness Elementary
 

Van Ness Elementary School, at 5th and M streets SE, is apparently on the city's list of approximately 30 schools it wishes to close by August 2008 as part of a financial restructuring of the DC Public Schools. I'm guessing that a developer or two might be willing to pay the city a tidy sum for the rights to that property on the southern edge of Capper/Carrollsburg.... Here's a Post story from a few days ago about the school closures initiative in general; and a Voice of the Hill blurb about Van Ness's principal going before ANC 6D looking for a letter of support for keeping the school open (the ANC wants more information before making a decision). The city is expected to make its decision in April.
More posts: ANC News, Capper, Van Ness Elementary
 
35 Posts:
Go to Page: 1 | 2 | 3 | 4